Remarks of R.P. Singh CMD, SJVN Limited. Power Scenario in India & Neighboring Countries All India Installed Capacity (As on 30th September, 2014) Sector.

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

Grid Issues Charles Davies Commercial Director, National Grid Company British Wind Energy Association April 2002.
Baltic Energy Strategy Einari Kisel Director of Energy Department.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
Hydropower Development: Experience of Nepal
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Recent Trends in Energy Regulation IEA-FTS of Russia Workshop on Global Energy Market Scenarios Paris, 28 May 2009 Kieran McNamara Country Studies Division.
1 Framework Required to Ensure Long-term Sustainability - Environmental and Socio- cultural concerns.
Solar Energy Policy in Andhra Pradesh (AP) M. Thimma Reddy People’s Monitoring Group on Electricity Regulation Jaipur – 29/11/2013.
1 Renewable Energy Options for the Indian Railways Amit Kumar TERI, New Delhi December 21, 2011.
Thailand, May 2009 Mekong Energy and Ecology Network The First Mekong Energy and Ecology Training.
Uib.no UNIVERSITY OF BERGEN Development of Energy law Legal Challenges Professor Ernst Nordtveit Faculty of Law Insert «Academic unit» on every page: 1.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Renewable Energy Sector
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Dr. Osman Bülent TÖR Power System Planning and Analyse Group Jordan, 2012 Responses of IPPs against Incentive Mechanisms for Renewable Generation in Turkey.
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
Turkish Power System Overview March 2012
Presentation to San Diego Sierra Club Richard Caputo 12 Nov 07 Renewable Energy Parks.
REGULATORY FRAMEWORK ON OIL & GAS SECTOR by B.S. NEGI Member Petroleum and Natural Gas Regulatory Board, India 1.
Quantum Leap in Wind Role of Institutions and Regional Cooperation Chunhua Li DGM Goldwind International June 2011, Manila.
Comparative Legal and Regulatory Framework of Nepal and India relating to Hydropower Development Advocate Amar Jibi Ghimire.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
ISO 9001:2008 (A Govt. of India Undertaking- Ministry of Water Resources) International Consultants in Water Resources, Power and Infrastructure.
Overview of Thailand’s power demand and supply With reference to proposed mainstream dams in the Lower Mekong Basin The Development Context Discussion.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Sanjay Garg General Manager PGCIL/ Ministry of Power
1 WIND ENRGY STATUS : PAKISTAN ASIAN CLEAN ENERGY FORUM ND ADB Quantum Leap in Wind Conference GOVERNMENT OF PAKISTAN June 20, 2011.
Prof F.D. Yamba I NTERNATIONAL S EMINAR REFIT AND CHALLENGES IN ZAMBIA 30 TH – 1 ST M ARCH, 2015.
The Future of Energy Markets in India: Structure and its Regulation Anoop Singh Dept. of Industrial and Management Engineering, Indian Institute of Technology.
Frankfurt (Germany), 6-9 June 2011 Fabio Cazzato, Simone Botton, Marco Di Clerico – Enel Distribuzione SpA Simone Botton – Italy – Session 4 – Paper ID.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
MiniGrid Group NEP Off Grid Electrification Breakout session.
Energy Conclave 2006 Presentation by Debashish Majumdar, Managing Director Indian Renewable Energy Development Agency Limited New Delhi July 27, 2006 Implementing.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
Kiichiro Fukasaku Development Centre
El Gallo Hydroelectricity Project PDD Analysis
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
Presentation on Capacity Addition targets for X th Plan MINISTRY OF POWER 2 nd May 2002.
Renewable Energy Certificates in Himachal Pradesh Role of HP regulator and Government By : Navneet Khokhar
Geothermal Policy and Regulation Cases from Chile, Kenya, New Zealand and the Philippines November 2015.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
BS3: FINANCING OF IRRIGATION PROJECTS 6 th April, 2016 INDIA WATER WEEK by R. K. Agrawal Senior General Manager.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Hanoi, October GROWTH RATE OF ELECTRICITY DEMAND Growth rate of Electricity consumption, period Growth rate of Electricity consumption,
Nepal’s Water Resources at a Glance
Renewable energy support schemes in the Republic of Moldova
South East Europe Regional Consultation Meeting Bucharest, Romania 6 – 7 October 2016 Session II: Opportunities and Challenges in RE Deployment in the.
Template for country interventions (5 min)
Presentation of the case in Japan for Technical Committee K - Integrated Operation of Hydropower Stations and Reservoirs- Centers for Civil Engineering.
WATER & POWER 4th INDIA WATER WEEK- 2016
Overview on Renewable energy in Bulgaria
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
FIELD LEVEL CHALLENGES FOR SOLAR PARKS IN INDIA
a. Financing b. Designing c. Construction d. Operating
Development of Hydro Power Projects Issues and Possible Solutions
Incentives for electricity infrastructure – ERGEG view
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Presentation transcript:

Remarks of R.P. Singh CMD, SJVN Limited

Power Scenario in India & Neighboring Countries All India Installed Capacity (As on 30th September, 2014) Sector Installed Capacity (MW)% Share Thermal1,76, Hydro Nuclear4, RES Total254049

Power Scenario in India & Neighboring Countries Estimated Demand & Generation Projection in India by 2050 YearPeak Demand Requirement (GW) Installed Capacity Requirement (GW)

Power Scenario in India & Neighboring Countries(- Contd-) Status of Hydro Power Development in India (As on 30 th September,2014 ) StatusCapacity (MW) Hydro Potential Available Under Operation40799* Under Construction13207 Potential yet to explore96100 % of Potential harnessed ( Operation + construction) 34 %

Power Scenario in India & Neighboring Countries(- Contd-) % Share of sectors in All India Hydro Power Installed Capacity (As on ) Sector Installed Capacity (MW)% Share Central State Private Total40799

Power Scenario in India & Neighboring Countries(- Contd-) Status of Hydro Power Development in India - Opportunities Status Capacity (MW) > 25 MW Arunachal Pradesh Uttarak hand Himachal Pradesh SikkimKarnatakaMaharashtr a Hydro Potential Under Operation Under Construction Yet to explore % of potential explored Kerala

Power Scenario in India & Neighboring Countries(- Contd-) Hydro Power Opportunities in Neighboring Countries:- StatusCapacity (MW) BhutanNepal Hydro Potential30000(Technically feasible ) Under Operation Under Construction Yet to Explore % of Potential explored486

Challenges for Hydro Power Sector  Land Acquision  Environmental Issues  Market Challenges:- Bidding process for hydro projects, difficulty in financing due to long gestation period  Technical Challenges: Natural Disasters of flood and landslides along with unexpected cavities, underground water springs (hot/cold) and a relatively fragile rock as Himalayas are young fold mountains.  Lack of Infrastructure:- Lack of communication facilities, Sub stations & Power Evacuation Network.  Clearance of DPR and approval of Investment decision  Long gestation period

Challenges for Hydro Power Sector-Contd- Major slippage reasons for Hydro Projects  Delay in Preparation of DPR & MOU Signing  Delay in MOEF Clearances  Delay in Investment decision/Funds tie up constraints  Delay in Award of Works  Geological Surprises  Natural Calamity  R &R Issues  Court cases

Measures to Optimize the Hydro Power Generation  Optimization in Operation of Hydro Power Plants  Hydro Plants need to operate at Overload Capacity available within design limit during high flow season and/or during peak hrs.  Use of advance technologies e.g. Robotic based HVOF Coatings on underwater parts, Periodic Reservoir Flushing and specific arrangements at Dam to counter high silt in the river.  Use of latest Control schemes/up gradation of control system of old plants to achieve fast response characteristics e.g. FGMO/RGMO Mode of operation, SPS Schemes for improving grid security etc. Result:-  Extra MU  Extra MW  Less Maintenance time  Reduced cost of Maintenance  Increased Plant Availability

Gross Energy Generation (MU) The design energy generation capacity is 6,612 MU in a 90% dependable year Measures to Optimize the Hydro Power Generation-Contd- Nathpa Jhakri Hydro Power Station (1500 MW) PAF ( NAPAF 90%) Highest in the country

Measures to Optimize the Hydro Power Development  Regulatory Framework for Hydro Power Sector:- Revival of Mega Power Policy to allow the benefit of Excise Duty/Custom Duty on Equipments as well as Construction material (Steel, Cement etc) for the Hydro plants of Unit size more than MW Possibility of Single Window clearance for all approvals required to set up a Hydro Power Plant. A Central Agency/ Govt. of India may be given the responsibility for preparation of DPR and obtaining all other statuary clearances before the allotment of project to developer for execution. Statuary clearance from the Environment, Forest and Wildlife point of view may be accorded on a speedy basis. Speedy approval of investment decision after the project has been allotted to the developer.  Improving Infrastructure of the Region Prior to Execution of Project: Roads, Rail Connectivity, Upgrading of the existing sub-stations, Basic Infrastructure for PAPs

Measures to Optimize the Hydro Power Development (Contd.)  Planning for Integrated River basin development approach:- Project allocation procedure in line with integrated river basin development, Cascade /Tandem Projects should be allotted to same developer.  Development of Benefit sharing mechanism with PAPs for benefit of all stakeholders:- Provisions for the PAPs to establish an ownership in the project by offering suitable equity participation at par as on the date of COD.  Power evacuation Infrastructure:- Dedicated Transmission network may be created for Evacuation of Power from the North East Region. Building Pooling substations in locations having concentration of hydro resources to reduce project cost.  Introduction of Hydro Power Purchase obligation in line with renewable sector.  Differential Tariff Structure consisting of Peak & Off-Peak Tariff  Introduction of incentive scheme for Operational Hydro Power Plants -- Black start up capability -- reactive power regulation -- measures to ensure grid security like SPS & FGMO/RGMO mode.