Grand Calumet River/Indiana Harbor Canal Feasibility Study

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Advertisements

NYS Department of Environmental Conservation Update on the Niagara River U.S. RAP Niagara River Remedial Action Plan Implementers Session April 10, 2013.
Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
1 Utilizing Engineered Permeable Reactive Caps To Minimize Re-Suspension Of COC – Post Dredge WEDA Midwest Chapter – Green Bay April 27, 2012 Allen Bullock.
Northwest Region Cleanup Program Zidell Waterfront Property Cleanup 2012 Portland Scott Manzano | Oregon Department of Environmental Quality.
Confined Disposal Facilities and In Situ Capping Site characterization / selection Engineering design Operational considerations Contaminant pathways and.
BoRit Superfund Site Timeline
ICMP Public Meeting February 18 th, 2011 February 18 th, 2011.
Shell Island West NRDA Restoration
Harwich Haven Authority. Harwich Haven Authority and the Port of Felixstowe are working together on the early stages of a Haven Navigation Channel deepening.
Update on Canal Restoration Demonstration Projects Water Quality Protection Program August 14, 2014.
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Great Lakes Legacy Act Stakeholder Engagement Meeting, Adjacent Waterway Landowners April 23, 2015 Agenda I.Introduction/welcomeFernando M. Treviño, ECWMD.
The situation in Norway concerning sediments/dredging Tore Lundestad, Port of Borg, Norway.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Savannah Harbor Expansion Project
Environmental Quality Service Council IDEM Great Lakes Issues September 29, 2011 Thomas W. Easterly, P.E., BCEE, QEP Commissioner, Indiana Department of.
KleanEnvi, Inc. The Provider of Environmental Solutions Introducing A Team of BioGenesis™
Salton Sea Species Conservation Habitat Workshop June 10, 2010.
Update on the Superfund Program: U.S. Tour de Table NATO SPS Pilot Study Prevention and Remediation in Selected Industrial Sectors June 17-23, 2006 Ljubljana,
Collaborative Monitoring in the Great Lakes: Revisiting the Lake Michigan Mass Balance Project Collaborative Monitoring in the Great Lakes: Revisiting.
Challenges of Performing Contaminated Sediment Remediation and Restoration in China and Taiwan Brian J. Mastin, Ph.D. Dave Renfrew Jerry Chen Samuel Wu.
Dredging Engineering: Building & Maintaining Underwater Highways
Roxana Marsh Characterization by Jim Smith, Ph.D., IDEM & Dan Sparks, U.S. FWS.
Modeling to Understand Stormwater Management Efforts Portland Harbor Superfund Site Dawn Sanders City of Portland Bureau of Environmental Services September.
1 Survey of the Nation’s Lakes Presentation at NALMS’ 25 th Annual International Symposium Nov. 10, 2005.
CWPPRA New Orleans Land Bridge Shoreline Enhancement and Marsh Creation Project Project Kickoff Meeting April 15, 2015.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Economic Opportunities from Environmental Harms: The Passaic River Example Bill Jackson
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Fiscal Year 2004 April 10, FY 2002FY 2003FY 2004 EnactedBudgetBudget COLUMBIA RIVER BASIN: Army Corps of Engineers Bureau of Land.
The Clean Water Act © Dr. B. C. Paul (Jan. 2000).
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
PROSPECT ISLAND RESTORATION& THE FISH RESTORATION THE FISH RESTORATION PROGRAM AGREEMENT Dan Riordan Department of Water Resources.
US Army Corps of Engineers Chicago District FY04tpr\skbcongressional Civil Works Program Missions Missions Process Process Select Authorities Select Authorities.
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
Stakeholders Meeting November 15,  Review the development and identification of State’s preferred alternative  Provide updates on SCH Project.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
Characterizing the Post-Dredge Surface: Comparison of In-Situ (Pre-dredge) and Post-Dredge Grab Samples at Three Sites in the Willamette River, Portland.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Project Update: Hudson River PCBs Superfund Site October 24, 2012 Mr. David King, PE – USEPA Region 2 Mr. Gary Klawinski – USEPA Region 2 Mr. Mark Surette.
Margaret Byrne, U.S. Fish and Wildlife Service
Dredged Material Separation Plan Execution in New York Harbor Deepening Projects Jeff Snyder SeaVision Underwater Solutions.
Brian Hitchens and Sam Williams PCBs in the Urban Environment: Implications for Long-Term Sustainability Of Low-Threshold Remediation.
Planning Habitat Restoration for Dredging Projects WEDA Midwest Chapter Conference Green Bay, Wisconsin April 27, 2012 Jack Brunner.
In Situ Sediment Treatment: State of the Practice
Brazoria County RESTORE Act Projects
Florida Inland Navigation District: Broward County Deepening Project Dredging Challenges – Permitting the Dredging of the Intracoastal Waterway, Dania.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
What does a Civil Engineer do?
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Purpose of the Project  Construct surface access (industrial) to the Ambler Mining District  Support exploration and development of mineral resources.
Draft Work Plans West Branch of the Grand Calumet River Indiana September 2002 prepared by Foster Wheeler Environmental Corporation for Grand Calumet River.
CALCASEIU RIVER AND PASS DREDGED MATERIAL SEDIMENTATION STUDY.
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
Bayou Verdine Superfund Site
United States Environmental Protection Agency
Niagara River Area of Concern
Sediment Cleanup Options
Pipeline Planning and Construction: Environmental Considerations
Dave Wethington, PE Joanne Milo, PMP
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

Grand Calumet River/Indiana Harbor Canal Feasibility Study Discuss approach and considerations when planning habitat restoration for dredging projects East Chicago Waterway Management District Jim Wescott April 23, 2015

Grand Calumet River & Indiana Harbor Canal East Chicago Waterway Management District and EPA are funding an investigation and study of the GCR/IHC to develop a remedial design ECWMD, EPA, and their consultant, Tetra Tech, want stakeholder feedback on remedial options, funding priorities, future end use, and other stakeholder groups not represented here today.

GCR/IHC Progress East Branch Actual Start spring 2013 Discuss WBGCR and how lessons learned applied to EBGCR.

Completed/In Progress EBGCR USS Steel Section: Hydraulic Dredging WBGCR Reaches 3-5: Mechanical Excavation and Capping WBGCR Reaches 1&2:Hydraulic Dredging, Mechanical Excavation, Capping, and Habitat Restoration EBGCR Reaches 4A&4B: Hydraulic Dredging, Mechanical Excavation, Capping, and Habitat Restoration WBGCR Reaches 6&7:Mechanical Excavation and Capping EBGCR Gary Section: Feasibility Study/Remedial Design WB/EB GCR, Indiana Harbor Canal, and Lake George Canal Remedial Investigation and Feasibility Study

Current Project Area – GCR/IHC

Grand Calumet River Junction

Indiana Harbor Canal

Lake George Canal

RI/FS Tasks Remedial Investigation Feasibility Study Sediment Sampling Pore Water Sampling Source Control Evaluation Bathymetric and Topographic Surveys Geotechnical Sampling Clean Up Goals Development Remedial Alternative Screening and Evaluation

GCR Surface Sediment Total 16 PAH

GCR Subsurface Sediment Total 16 PAH

GCR Surface Sediment PCBs

GCR Subsurface Sediment PCBs

GCR Surface Sediment Metals

IHC Surface Sediment Total 16 PAH

IHC Subsurface Sediment Total 16 PAH

IHC Surface Sediment PCBs

IHC Subsurface Sediment PCBs

IHC Surface Sediment Metals

LGC Surface Sediment Total 16 PAH

LGC Subsurface Sediment Total 16 PAH

LGC Surface Sediment PCBs

LGC Subsurface Sediment PCBs

LGC Surface Sediment Metals

Remedial Options No Action Monitored Natural Recovery In Situ Capping Environmental Dredging or Excavation

Grand Calumet River Options Sediment Dredge 10 feet of River (Majority of Impacted Sediment) and place 2 feet of sand over remaining sediment. Estimated $43,000,000 Dredge 3 feet of West Branch. Place active cap material over West and East Branches. Estimated $16,000,000. Option 2 with targeted dredging in East Branch. Estimated $17,500,000 Habitat Dredge and rebuild/restore Junction Marsh and the USS Lead Marsh. Estimated $13,000,000 Invasive Species control and replant both marshes. Estimated $1,000,000 Option 2 with partial dredging along river boundary. Estimated $7,500,000

Indiana Harbor Canal Options Sediment Dredge 8 feet of Canal (Majority of Impacted Sediment) and place 2 feet of sand over remaining sediment. Estimated $48,000,000 Option 1 with 1 foot sand. Estimated $44,000,000 Partial dredging for PCB areas and place 2 feet of sand over remaining sediment. Estimated $15,000,000 Option 3 with 1 foot sand. Estimated $11,000,000

Lake George Canal Options Lake George Canal East of Railroad Bridge Dredge area to navigation channel depth (10 feet) Estimated $8,000,000 Partial dredge to reduce resuspension (5 feet) Estimated $4,000,000 Lake George Canal between Railroad Bridge and Land Bridge Partial dredge (5 feet) and 2 feet sand cap. Estimated $8,500,000 Six (6) foot sand cap. Estimated $4,500,000 Lake George Canal west of Land Bridge Dredge 6 feet and 1 foot sand cap. Estimated $ 18,000,000 2.No Action

Selection Considerations Cost Permits Site Access Utilities and other Debris Sediment Characteristics Long Term Effectiveness Potential for Recontamination Future End Use Stakeholder and Community Acceptance

Typical Remedial Tasks

Time Frame and Costs Seeking Project Partners Begin Dredging spring 2016 Complete remedial action 2018-2020 Cost Ranges from $40 Mil to $145 Mil Schedule heavily dependent on non-federal and federal funding Construction could be broken into smaller pieces to facilitate funding and stakeholder priorities Seeking Project Partners

Jim Wescott Tetra Tech jim.wescott@tetratech.com 312.201.7781 Questions? Jim Wescott Tetra Tech jim.wescott@tetratech.com 312.201.7781