Laws and Regulations Laws and regulations are major tools for protecting people and the environment. Congress is responsible for passing laws that govern.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Developed by Western Iowa Tech Community College This material was produced under a grant (SH F-19) from the Occupational Safety and Health.
Course Material Overview of Process Safety Compliance with Standards
BLR’s Safety Training Presentations
Safety Driven Performance 2013
Process Safety Management of Highly Hazardous & Explosive Chemicals Operating Procedures, Safety Procedures & Training.
More CMM Part Two : Details.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
Jack Harrah Governor’s Office of Emergency Services
How to Implement the CalARP Program
School Safety Training
California Accidental Release Prevention Program California Accidental Release Prevention (CalARP) Program.
Process Safety Management of Highly Hazardous Chemicals Nancy J Bethea.
CalARP Formal Evaluation Review
Process Hazard Analysis Revalidations If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
Modeling with CAMEO Les Benedict St. Regis Mohawk Tribe.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Developing a Chemical Risk Management Program
This material was developed by Compacion Foundation Inc and The Hispanic Contractors Association de Tejas under Susan Harwood Grant Number SH SH0.
Safety and Health Programs
Process Safety Management of Highly Hazardous & Explosive Chemicals
Process Safety Management of Highly Hazardous & Explosive Chemicals Contractor Pre-Qualification, Emergency Preparedness, Incident Investigation, Audits.
Permit to Work Procedure Document Number: KOC.SA.004
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
HAZWOPER Overview.
PSM Covered Chemical Facilities National Emphasis Program.
OH&S Management System
Risk Assessment – An Essential Standard
EHS Management System Elements
EPCRA1 The Emergency Planning and Community Right-to-Know Act (EPCRA) The Emergency Planning and Community Right-to-Know Act (EPCRA)
Approaches for forest certification System versus performance ? Presentation prepared by Pierre Hauselmann for the WWF / WB Alliance Capacity building.
Presented to: RETA National Conference – Atlanta November 5, 2014 If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us.
Slide 1 Presented by: Insert name MEMIC Safety Management Consultant Hazard Communication Standard and the Globally Harmonized System (GHS) Overview.
Elements of Process Safety Management
Process Safety Management
Tim Date, Manager Risk Management Planning Unit
Basics of OHSAS Occupational Health & Safety Management System
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Ert 312 LECTURE 4 OSHA & DOSH.
© 2012 Delmar, Cengage Learning Chapter 13 Regulatory Overview OSHA, PSM, and EPA.
IMPLEMENTING AN EFFECTIVE SAFETY PROGRAM What Am I Supposed To Do To Meet OSHA Standards?
The OSH Act, Standards, & Liabilities
Process Safety Management (PSM)
Health and Safety Policy
Lecture 2 ENGR. MARVIN JAY T. SERRANO Lecturer
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
Florida Accidental Release Prevention and Risk Management Planning (ARP/RMP) Act State Emergency Response Commission Preparing for Facility Risk Management.
This Project is funded by the European Union Project implemented by Human Dynamics Consortium This project is funded by the European Union Projekat finansira.
Responsible Care® Health & Safety Task Force – 06 H&S.
Introduction to a Safe Workplace
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Process Safety Management
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Safety and Health Program Don Ebert- Risk Manager (509)
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Risk Assessment: A Practical Guide to Assessing Operational Risk
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Lowell Randel Global Cold Chain Alliance/ International Institute of Ammonia Refrigeration.

Occupational Safety and Health for Brownfields
OH&S Management System
Managing Safe Work Permits
Process Safety Management of Highly Hazardous Chemicals
OH&S Management System
Process Safety R. Bruce Eldridge.
Risk Management and Mitigation
Process Safety Management
Presentation transcript:

Laws and Regulations Laws and regulations are major tools for protecting people and the environment. Congress is responsible for passing laws that govern the United States.

Creating a Law in US A law is created with a three-step process: Step 1: A member of Congress proposes a bill. A bill is a document that, if approved, become a law. Step 2: If both houses of Congress approve the bill, it is sent to the president, who has the option to either approve it or veto it. If approved, it becomes a law that is called an act. Step 3: The complete text of the law is published in the United States Code (USC). The code is the official record of all federal laws.

Creating a Regulation or Standard To make the laws work on a day-to-day level, Congress authorizes governmental organizations, including the EPA and OSHA, to create regulations and/or standards. After the regulation is in effect, the EPA or OSHA has the responsibility (1) to help citizens comply with the law and (2) to enforce the regulation.

Regulation/Standard Creating Procedure The process for creating a regulation and/or standard has two steps: Step 1: The authorized organization or agency decides when a regulation is needed. The organization then researches, develops, and proposes a regulation. The proposal is listed in the Federal Register (FR) so that the public can evaluate it and send comments to the organization. These comments are used to revise the regulation. Step 2: After a regulation is rewritten, it is posted in the Federal Register as a final rule, and it is simultaneously codified by publishing it in the Code of Federal Regulations (CFR).

History Before 1936 regulations concerning occupational health were poorly administered by state and local governmental agencies. During this era, staffs and funds were to small to carry out effective programs. In 1936 the federal government enacted the Walsh-Healy Act to establish federal safety and health standards for activities relating to federal contracts. The concepts promulgated by the Walsh-Healy Act, although not adequate by today’s standards, were the forerunners of our current occupational health and safety regulations. Between 1936 and 1970 a number of states enacted their own safety and health regulations. The OSHAct of 1970 was developed to solve these problems and to give a nationally consistent program with the funding necessary to manage it effectively.

OSHA and NIOSH As a result of the OSHAct, sufficient funding was committed to create and support the Occupational Safety and Health Administration (OSHA), which manages and administers the government’s responsibilities specified in the OSHAct, and the National Institute for Occupational Safety and Health (NIOSH), which conducts research and technical assistance programs for improving the protection and maintenance of workers’ health. Examples of NIOSH responsibilities include (1) measuring health effects of exposure in the work environment, (2) developing criteria for handling toxic materials, (3) establishing safe levels of exposure, and (4) training professionals for administering the programs of the act. NIOSH develops data and information regarding hazards, and OSHA uses these data to promulgate standards.

Some laws and regulations particularly relevant to the chemical industry are shown in Table 3-1. As illustrated in this table, the distinction between laws (USC) and regulations (CFR) is global versus detail.

Table 3-1 A Few Laws (USC) and Regulations (CFR)

Highlight of OSHA enforcement rights are illustrated in Table 3-2. Table 3-3 provides a summary of relevant safety legislation, and Figure 3-1 shows how the amount of legislation has increased.

Table 3-2 Highlights of OSHA’S Right of Enforcement

Table 3-3 Federal Legislation Relevant to Chemical Process Safety (1)

Table 3-3 Federal Legislation Relevant to Chemical Process Safety (2)

Table 3-3 Federal Legislation Relevant to Chemical Process Safety (3)

Table 3-3 Federal Legislation Relevant to Chemical Process Safety (4)

Figure 3-1 Number of federal laws relevant to chemical process safety.

OSHA: Process Safety Management On February 24, 1992, OSHA published the final rule “Process Safety Management of Highly Hazardous Chemicals”. (PSM) Process safety management (PSM) was developed after the Bhopal accident (1985), to prevent similar accidents. The standard is performance oriented, that is, it sets general requirements for management of hazardous chemicals.

The PSM standard has 14 major sections: (1) employee participation, (2) process safety information, (3) process hazard analysis, (4) operating procedures, (5) training, (6) contractors, (7) pre-startup safety review, (8) mechanical integrity, (9) hot work permits, (10) management of change, (11) incident investigations, (12) emergency planning and response, (13) audits, and (14) trade secrets. (1) Employee participation requires active employee participation in all the major elements of PSM. Employers must develop and document a plan of action to specify this participation.

(2) Process safety information is compiled and made available to all employees to facilitate the understanding and identification of hazards. This information includes block flow diagrams (BFD) or process flow diagrams (PFD), process chemistry, and process limitations, such as temperatures, pressures, flows, and compositions. Consequences of process deviations are also required. This process safety information is needed before training, process hazards analysis, management of change (MOC), and accident investigations.

(3) Process hazard analysis (PHA) must be performed by a team of experts, including engineers, chemists, operators, industrial hygienists, and other appropriate and experienced specialists. The PHA needs to include a method that fits the complexity of the process, a hazards and operability (HAZOP) study for a complex process, and for less complex processes a less rigorous process, such as what-if scenarios, checklists, failure modes and effects analysis, or fault trees. Every PSM process needs an updated PHA at least every five years after the initial analysis is completed.

(4) Operating procedures that facilitate the safe operation of the plant must be documented. They need to cover, at a minimum, initial startup, normal operations, temporary operations, emergency shutdown, emergency operations, normal shutdown, startup after normal and emergency shutdowns, operating limits and consequences of deviations, safety and health considerations, hazardous properties of the chemicals, exposure precautions, engineering and administrative controls, quality control specifications for all chemicals, special or unique hazards, and safety control systems and functions. Safe work practices also need to be documented, such as hot work, lockout/tagout, and confined space. These operating procedures are updated frequently, with the frequency being set by the operating personnel.

(5) An effective training program helps employees understand the hazards associated with the tasks they perform. Maintenance an operation personnel receive initial training and refresher training. Operators need to understand the hazards associated with every task, including emergency shutdown, startup, and normal operation. Refresher training is given every three years and more often if necessary; the operators decide on the frequency of the refresher training.

(6) Contractors are trained to perform their tasks safely to the same extent as employees. Even when selecting contractors, the employees need to consider the contractors’ safety performance in addition to their skills. (7) A pre-startup safety review is a special safety review that is conducted after a modification to the process or operating conditions has been made and before the startup. In this review a team of reviewers ensures that (1) the system is constructed in accordance with the design specifications, (2) the safety, maintenance, operating, and emergency procedures are in place, (3) the appropriate training is completed, and (4) the recommendations from the PHA are implemented or resolved.

(8) The mechanical integrity section of the PSM standard ensures that the equipment, piping, relief system, controls, and alarms are mechanically sound and operational. The requirements include (1) written procedures to maintain functioning systems, (2) training regarding preventive maintenance, (3) periodic inspections and testing based on vendor recommendations, (4) a process to correct deficiencies, and (5) a process to ensure that all equipment and spare parts are suitable.

(9) The PSM standard ascertains that a system is in place to prepare and issue hot work permits before conducting hot work activities (welding, grinding, or using spark-producing equipment). The permit requires dates authorized for hot work, the equipment involved in the work, a system to maintain and document certification, identification of openings where sparks may drop, the types and numbers of fire extinguishers, identification of fire watches, an inspection before the work, authorization signatures, identification of flammable materials in the area, verification that the surrounding area is not explosive, verification that combustible materials are removed or covered appropriately, identification and closure of open vessels or ducts, and verification that welded walls are not flammable.

(10) Under the management of change section of the PSM standard employees are required to develop and implement documented procedures to manage changes in the process chemistry, process equipment, and operating procedures. Before a change occurs (except for replacement-in-kind), it must be reviewed to ascertain that it will not affect the safety of the operation. After the change has been made, all the affected employees are trained, and a pre-startup review is conducted.

(11) The PSM standard mandates incident investigation. Employers must investigate all incidents that have or could have resulted in a major release or accident within 48 hours of the event. The regulation requires an investigation team composed of people, including operators, who are knowledgeable about the system. After the investigation, the employers are required to appropriately use the investigation recommendations.

(12) The intent of the PSM element for emergency planning and response is to require employers to respond effectively to the release of highly hazardous chemicals. Although the regulation requires this activity for companies with more than 10 employees, this element should be part of a program for even the smallest organizations that handle hazardous chemicals.

(13) Under the audits section of the PSM standard employers are required to certify that they have evaluated their compliance with the standard at least every three years. The recommendations from the audit must be followed. The audit reports need to be retained as long as the process exists. (14) The trade secrets section of the PSM standard ensures that all contractors are given all the information relevant to operating in the plant safely. Some personnel may need to sign secrecy agreements before they receive this information.

EPA: Risk Management Plan On June 20, 1996, the EPA published the Risk Management Plan (RMP) as a final rule. This regulation is also a response to the Bhopal accident.

It is recognized by industry and the government as an excellent regulation that will reduce the number and magnitude of accidents if it is understood and practiced as intended. The RMP regulation is aimed at decreasing the number and magnitude of accidental releases of toxic and flammable substances. Although the RMP is similar to the PSM regulation in many respects, the RMP is designed to protect off-site people and the environment, whereas PSM is designed to protect on-site people.

The RMP is required for plant sites that use more than a specified threshold quantity of regulated highly hazardous chemicals. The RMP is a site responsibility (the site may have several processes), whereas PSM covers every covered process on the site.

Elements of RMP hazard assessment, prevention program, emergency response program, documentation that is maintained on the site and submitted to federal, state, and local authorities. This information is also shared with the local community. The RMP document is updated when the process or chemistry changes or when a governmental audit requests an update.

Hazard Assessment Hazard assessment is a consequence analysis for a range of potential hazardous chemical releases, including the history of such releases at the facility. The releases must include the worst-case scenario and the more likely but significant accident release scenarios. A risk matrix can be used to characterize the worst-case and more likely scenarios.

EPA-Required Consequence Analyses A single worst-case release scenario is analyzed for all covered flammable materials on the site, and only one flammable substance is analyzed for other more likely scenarios; A single worst-case release scenario is analyzed for all toxic substances on the site, and more likely releases are analyzed for each toxic substance covered by the rule.

The worst-case scenario is based on releasing the entire contants of a vessel or piping system in a 10-minute period under worst-case meteorological conditions (F stability and 1.5 m/s wind speed). Passive mitigation measures (for example, dikes) can be used in the calculation process; therefore the release rate for liquid spills corresponds to the evaporation rate. Alternative release cases for toxic substances cover scenarios with toxic concentrations beyond the fence line. Alternative cases for flammable substances cover scenarios that may cause substantial damage off site and on site. The release scenarios that have a potential to reach the public are of the greatest concern. Those with no off-site potential damage are not required to be reported.

Dispersion model calculations are normally used to estimate downwind concentrations; these concentrations are the basis for determining the consequences resulting from toxicity, fires, and/or explosions. For those not interested in using dispersion models, the standard includes lookup table for all the listed substances to help a facility determine the impact distances for specific release scenarios. The RMP requires only an analysis of the consequence and not the probability. Therefore the results are not a true determination of risk, because risk is composed of both consequence and probability.

Prevention Program The second requirement of the RMP is a prevention program. The prevention program has 11 elements, compared to the 14 elements of the PSM standard. As shown is Table 3-4, many of these elements are duplicated. Fortunately, the EPA made a deliberate attempt to retain the same requirements wherever possible, although differences exist because the EPA and OSHA have different responsibilities.

Table 3-4 Comparison of the PSM and RMP Prevention Programs (1)

Table 3-4 Comparison of the PSM and RMP Prevention Programs (2)

Emergency Response Program This program delineates the steps to be taken by the facility’s employees in response to accidental releases of hazardous materials. It also establishes procedures for notifying the local community and the appropriate emergency response agencies. Training is for all employees on the topics relevant to emergency response. The requirements include drills to test the plan and to evaluate its effectiveness, and the plan must be revised based on the findings of these drills.

The plan must be coordinated with local emergency response plans developed by Local Emergency Planning Committees (LEPCs) and local emergency response agencies. As with similar OSHA regulations, the Resource Conservation and Recovery Act (RCRA), and the Spill Prevention Control under the Clean Water Act, the emergency response plan must be maintained at the facility and must include descriptions of all mitigating system.