Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR 19.09.2014.

Slides:



Advertisements
Similar presentations
Joint Action for ECHIM European Community Health Indicators and Monitoring Antti Tuomi-Nikula National Institute for Health and Welfare (THL), Helsinki,
Advertisements

ICAO TEM/NOSS Symposium November 2005
The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
The framework of the Convention on Long-range Transboundary Air Pollution Henning Wuester Secretariat of the United Nations Economic Commission for Europe.
Date: in 12 pts 28 th Meeting EQF Advisory Group Brussels 2 -3 December 2014.
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
EDEP UG Bretigny, June 9 th 2008 eDEP Users Group Meeting Radar Skills Trainer Road map Vladimir Bubalo, IANS TDH.
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Dr. Barry Kirwan, EUROCONTROL Safety Culture Seminar introduction.
The CASCADE Programme Validation Status and Plans ASAS-TN2 Workshop 3-5 April 2006 Christos Rekkas CASCADE Deputy Programme Manager European Organisation.
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Nigel Makins EUROCONTROL
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Visit of Mr Griffiths, DG CAA UK - 20 December 2007 EUROCONTROL.
Christos Rekkas ADS Programme Manager EUROCONTROL
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
EDIT validation tool item 8 of the agenda Structural Business Statistics Working Group 14 April 2015, Luxembourg Arlind Dobërdolani.
Progress under the Convention on Long-range Transboundary Air Pollution Twenty-ninth meeting of the Task Force on Integrated Assessment Modelling
Water.europa.eu Update on legal issues Strategic Coordination Group Update as of Marco Gasparinetti, DG ENV.D.1, European Commission.
Gender Equality is key towards the eradication of Violence against Women.
Objective ATC 07.1 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Unique in Europe. Across Europe.
Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Eurojust cases involving crimes against children
GÉANT Planned Topology
Update on the UOE 2012 data collection
Education and Training Statistics Working Group, May 2011
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
State of legal transposition (1)
Report on WISE Art.8 and GIS issues
Habides update (May 2011).
State of play Article 5 reports
1.
Representative sampling questionnaire
Update on legal issues Strategic Coordination Group
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
2a. Status of WFD reporting
Reporting – Art 17 of HD and Art 12 of BD
Item 8.1 Implementation of the 2016 Adult Education Survey
2b. Status of WFD reporting
Programme adoptions Cohesion Policy:
Item 7.1 – Overview of 2012 UOE data collection
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
Update on legal issues Strategic Coordination Group
WFD River Basin Management Plans :
LSSIP Objective AOP03.
Update on legal issues Strategic Co-ordination Group 7-8 May 2009
State of Play RBMPs and WISE reporting (9/07/10)
FISIM State of play Agenda Item 3.
Update on implementation WG F 27 April 2010 Maria Brättemark
European Statistical Training Programme (ESTP)
Update on legal issues Strategic Coordination Group 23 February 2010
Update on legal issues Strategic Coordination Group
STEM Education Policies and Practices in Europe
Update on status of reporting and validation process
LAMAS Working Group June 2015
DG Environment, Unit C.2 Marine Environment and Water Industry
Presentation transcript:

Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR

2 Comprehensive Explanation (1/2)  Implementation of Medium Term Conflict Detection (MTCD) and MONitoring Aids (MONA) functionalities.  MTCD is an ATC tool which checks the system trajectories (Flight plan enhanced with surveillance data) and identifies the potential conflict. This function requires an appropriate presentation of detected conflict to the planning/tactical controller.  MONA is a conformance monitoring functionality including lateral, longitudinal and vertical conformance as well as progress monitoring.  Some functions, like longitudinal and lateral conformance plus progress monitoring, are widely implemented in ECAC area.  Additional flight conformance monitoring functions as: vertical conformance, CFL conformance, potential co-ordination failure, SSR code conformance, potential level bust are implemented by a limited number of ATM systems.  Automatic reminders (i.e. those that include controller reminders for next sector transfer, co-ordination reminders and maneuvering clearance) are not widely implemented. ESSIP Plan 2014 / Objective ATC12

3 Comprehensive Explanation (2/2)  Scope: ECAC  Applicability Area: in en-route airspace of AL / AM / AT / AZ / BA / BE / BG / CH / CY / CZ / DE / DK / EE / ES / FI / FR / GE / GR / HR / HU / IE / IT / LT / LU / LV / MAS / MD / ME / MK / MT / NL / NO / PL / PT / RO / RS / SE / SI / SK / TR / UA / UK Requirement: Implement and make operational use of ground based automated ATC support tool for conflict detection and conformance monitoring. ESSIP Plan 2014 / Objective ATC12

4 What is new or has changed for ESSIP Plan ed  SLoA REG01 on safety oversight removed (general action across all ESSIP objectives in the ESSIP Plan ed. 2014);  ‘Supporting material’ list extended (see full list in the last slide) ESSIP Plan 2014 / Objective ATC12

5 Link to European ATM Master Plan and/or Interim Deployment Programme (IDP) Eur. ATM Master Plan:  [CM-0202] - Automated Assistance to ATC Planning for Preventing Conflicts in En Route Airspace  [CM-0203] - Automated Flight Conformance Monitoring IDP:  None ESSIP Plan 2014 / Objective ATC12

6 Most important SLoA(s)  ASP01 – ‘Implement MTCD function’  ASP03 – ‘Develop safety assessment for the changes’ ESSIP Plan 2014 / Objective ATC12

7 Finalisation Criteria and Closed Questions  ASP01 – MTCD and conformance monitoring are implemented, documented and in operational use.  ASP03 – The Safety assessment report including safety arguments for the changes has been delivered to the NSA and a notification of acceptance was received.  MTCD and MONA implemented?  Safety assessment done and accepted by NSA?  Notification of acceptance received from NSA? ESSIP Plan 2014 / Objective ATC12

8 Supporting Material  EUROCONTROL Specification for Medium-Term Conflict Detection, Ed 1.0 of 15/07/2010; EUROCONTROL-SPEC  EUROCONTROL Specification for Monitoring Aids, Ed 1.0 of 15/07/2010; EUROCONTROL-SPEC-0142  EUROCONTROL Specification for Trajectory Prediction, Ed 1.0 of 15/07/2010; EUROCONTROL-SPEC-0143  EUROCONTROL: Completing the FASTI Safety Case: Guidance for Service Providers-Edition /2008  EUROCONTROL - Good Practice Guidelines for First ATC Support Tools Implementation (FASTI) with a Focus on Human Factors and Managing the Transition - Edition 1.0 / 06/2007  EUROCONTROL: FASTI Operational Performance Requirements Analysis for the Conflict Detection Tool 2nd Edition 2012  EUROCONTROL: FASTI ATC Manual - Guidelines for FASTI Tools Implementation 2009  EUROCONTROL : FASTI Specific Human Factors Guidelines for MTCD, MONA and SYSCO 2007 ESSIP Plan 2014 / Objective ATC12

9 ESSIP Report 2013  Progress mostly on schedule.  16 States have declared it Completed, another 5 as Partially Completed and 16 with plans for completion by FOC date (12/2016) at the latest. ESSIP Plan 2014 / Objective ATC12

10 Links and contacts  Objective Coordinator: Dell’Orto Luca,  EUROCONTROL Objective Expert: Predrag Terzioski, ESSIP Plan 2014 / Objective ATC12