Presented by: [name] [date].  Overview of CMAA’s Standards of Practice  Benefits of attaining CCM credential.

Slides:



Advertisements
Similar presentations
Campus Improvement Plans
Advertisements

Software Quality Assurance Plan
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
Security Controls – What Works
The ISO 9002 Quality Assurance Management System
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
ENVIRONMENTAL MANAGEMENT PLAN
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Certified Business Process Professional (CBPP®)
SAFA- IFAC Regional SMP Forum
Certified Business Process Professional (CBPP®) Exam Overview
Purpose of the Standards
How can projects be controlled?
Auditing Standards IFTA\IRP Audit Guidance Government Auditing Standards (GAO) Generally Accepted Auditing Standards (GAAS) International Standards on.
Charting a course PROCESS.
Release & Deployment ITIL Version 3
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
Internal Auditing and Outsourcing
1 CHCOHS312A Follow safety procedures for direct care work.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
S/W Project Management
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
ACADEMIC PERFORMANCE AUDIT
Standards of Practice Course
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
James Aiello PricewaterhouseCoopers Africa Utility Week 06 International Good Practice in Procurement.
Implementation of the Essential Standards The Australian Quality Framework (AQTF) is the national set of standards which assures nationally consistent,
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Building Individual Professionalism in Construction Since A Valid, Reliable & Fair Direct or Indirect Measure for ACCE Construction Program Student.
TBPC Brown Bag Presentation Texas State Government
Georgia Institute of Technology CS 4320 Fall 2003.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
How To: A Process for Successful Partnerships. Partnership Definition A partnership IS: A written agreement between the parties. Mutual interest in, mutual.
Strategies for Knowledge Management Success SCP Best Practices Showcase March 18, 2004.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Company: Cincinnati Insurance Company Position: IT Governance Risk & Compliance Service Manager Location: Fairfield, OH About the Company : The Cincinnati.
Quick Recap.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Internal Audit Quality Assessment Guide
Leadership for Project and Program Success How professional Construction Management saves time, saves money and delivers quality projects.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Standards of Practice Course
Systems Analysis and Design in a Changing World, 4th Edition
Project life span.
TechStambha PMP Certification Training
Project Management.
OHS Staff Introduction Training
Guidance notes for Project Manager
By Jeff Burklo, Director
Project Management Process Groups
Presentation transcript:

Presented by: [name] [date]

 Overview of CMAA’s Standards of Practice  Benefits of attaining CCM credential

Construction Management The practice of professional management applied to the planning, design, and construction of projects from inception to completion for the purpose of controlling time, scope, quality and cost. © Construction Management Association of America. Do Not Duplicate or Reproduce.

 Establishes industry standards  Serves as a guide to range of services  Does NOT limit methods and procedures  Is delivery system neutral

1.0 Introduction 2.0 Project Management 3.0 Cost Management 4.0 Time Management 5.0 Quality Management 6.0 Contract Administration 7.0 Safety 8.0 Program Management 9.0 Sustainability 10.0 Risk Management 11.0 Building Information Modeling (BIM)

o Construction Management defined o is the practice of professional management applied to the planning, design, and construction of projects from inception to completion for the purpose of controlling time, scope, cost, and quality. o the application of integrated systems and procedures by a team of professionals to achieve the owner’s goals o 10 functions that are not mutually exclusive, but are related and integral components of the Construction Management process presented in the following phases: o Pre-Design o Design o Procurement o Construction o Post Construction o Key Definitions relevant to Construction Management

o 2.0 Project Management o Key components of a Project Management Plan and its development throughout the various project phases. In general terms it outlines key goals and elements of managing a project under the Construction Management format o 3.0 Cost Management o Guidelines for the CM to assist the team members in managing, controlling, and monitoring project costs during all phases of a project through an integrated and comprehensive cost management system. o 4.0 Time Management o An integral part of the CM’s responsibilities on a project. This responsibility is met when the CM makes the most effective use of people, equipment, materials, and funds relative to time.

o 5.0 Quality Management o Key goals, philosophies and elements of providing services while enhancing quality in the planning/design/construction process, the Construction Management services and ultimately, in the constructed facilities. o 6.0 Contract Administration o Addresses the administrative tasks of the CM during project execution and the administration and reporting requirements for all construction contracts. o 7.0 Safety o Focuses on the subject of providing safety management services to the owner if so required by the owner.

o 8.0 Program Management o Discusses Program Management which, in the context of the construction industry, is the application of Construction Management to large, complex or multiple capital improvement projects. o A Program Manager (PM) is generally assigned the responsibility of managing all of the resources and relationships necessary to achieve an owner's desired outcome. o Depending on the owner’s organization and needs, Program Management services may be provided by in-house personnel or contracted to a qualified consultant o 9.0 Sustainability o Discusses the expanding subject of sustainability as it pertains to the role of the CM. It outlines in general terms key goals, philosophies and elements of sustainability. o The general philosophy is to be incorporated with other key elements of the construction management plan including cost time and quality management as well as within the Project Management Plan. o

o 10.0 Risk Management o Provides the CM with a guide to a standard implementation of risk management on a project. o 11.0 Building Information Modeling (BIM) o Provides a brief summary of the CM’s role and responsibilities in implementing BIM on a project by phase. The CM must also accept the following general responsibilities related to the BIM process: o The CM has the responsibility to stay current and remain educated on the BIM process. o The CM has the responsibility to educate the owner and the project team on the benefits, features, limitations and the implementation process for BIM. o By educating its own personnel and the rest of the project team, the CM has the opportunity to continue its leadership role in the project delivery process with appropriate application of BIM.

Address 10 distinct functions…  Project Management  Cost Management  Time Management  Quality Management  Contract Administration  Safety  Program Management  Sustainability  Risk Management  Building Information Modeling (BIM) © Construction Management Association of America. Do Not Duplicate or Reproduce.

… and activities during all Phases of a Project © Construction Management Association of America. Do Not Duplicate or Reproduce.  Pre-Design*  Design  Procurement  Construction  Post-Construction *optimum time to engage CM

CMAA Body of Knowledge  CMAA Capstone: History of Construction  Management  CM Standards of Practice, 2010 Revision  CMAA Contract Administration Procedures  CMAA Cost Management Procedures  CMAA Quality Management Guidelines  CMAA Time Management Procedures  CMAA Sustainability Guidelines 2010  Model Contract documents ◦ CM At-Risk ◦ CM Agency © Construction Management Association of America. Do Not Duplicate or Reproduce.

Project Management: Definition As qualified to a construction project, the use of integrated systems and procedures by the project team to accomplish design and construction. © Construction Management Association of America. Do Not Duplicate or Reproduce.

Project Management Tools © Construction Management Association of America. Do Not Duplicate or Reproduce.  Construction Management Plan  Project Procedures Manual  Quality Management Plan  Procurement Plan  Contracts or Agreements  Laws  Standards of Care

Cost Management © Construction Management Association of America. Do Not Duplicate or Reproduce.  The CM plays a key role in Cost Management during all phases of a construction project: planning, design, bid/award, construction, and closeout  The CM is the cost professional on the project  Cost management must be established and implemented at the outset and continued throughout the project  CMAA procedures intended to help the CM with this role

Cost Management  Objectives ◦ Control Cost ◦ Deliver within Budget  CM’s Role in Cost Management ◦ Cost Management Plan (CMP), aka Project Money Plan ◦ Deliver within Budget  Financial forecast  Control project costs and cash flow © Construction Management Association of America. Do Not Duplicate or Reproduce.

Cost Management © Construction Management Association of America. Do Not Duplicate or Reproduce. Cost Control Responsibilities All communications must include the CM CM must attend all meetings CM must report accurately and regularly to the Owner CM must ensure that the project is delivered in the most economical way conforming to project requirements

Time Management © Construction Management Association of America. Do Not Duplicate or Reproduce. CMs most often cite delivering projects on time as their biggest challenge Time has the least amount of flexibility; it passes, no matter what Schedule issues are one of the main reasons for conflict on projects Accurate, initial schedule development and continued ongoing maintenance is paramount to: Avoiding claims Providing a solid basis for quantifying time impacts

Baseline Schedules © Construction Management Association of America. Do Not Duplicate or Reproduce. Essentials CM needs to manage: - Sufficient level of detail - Inflated durations to hide float - Logic ties to hide true critical path - Missing or incorrect logic - Arbitrary milestones: non-logic driven - Open-ended activities - Primary and secondary critical paths - Phasing - Regulatory requirements - Code compliance / inspections - Long lead procurement items

Schedule status prior to change Change Fragnet: Check Logic & Durations Recovery CHANGE ORDERS & CLAIMS Run original, and revised schedules until approved Tie to change order and negotiations REVISED SCHEDULE Changes/Claim Process © Construction Management Association of America. Do Not Duplicate or Reproduce.

Arecibo Space Telescope, Puerto Rico To Manage Project Time/Resources/Cost Good Schedule, Accurate Forecasts To Integrate Multiple Parties Owner, Contractor, User, Community To Evaluate Options Changes, Delays, Acceleration To Resolve Disputes © Construction Management Association of America. Do Not Duplicate or Reproduce.

Quality © Construction Management Association of America. Do Not Duplicate or Reproduce.  Quality - Can be subjective  Quality Control - Contractors responsibility  Quality Assurance - CM’s responsibility  Quality Management - Encompasses all aspects of quality  Quality Management Plan – a team responsibility

Quality Management Plan (QMP): the CMAA Definition A project specific, written plan, prepared for certain projects which reflects the general methodology to be implemented by the CM during the course of the project – to enhance the Owner’s control of time, cost, and quality through a process-oriented approach to the various management tasks for the program - Understanding of roles - Control time, cost, and quality - Should be done early in the project © Construction Management Association of America. Do Not Duplicate or Reproduce.

Progress Payments & Quality  Retainage as a quality tool  Format for authorizing extra work  Partial payments  Withholding payment © Construction Management Association of America. Do Not Duplicate or Reproduce.

Dispute Resolution: An Important Key to Quality  A real QA issue  Various methods available  Propose and agree upon the process early, but most importantly…  Establish the mind-set about the desired / expected quality of the work © Construction Management Association of America. Do Not Duplicate or Reproduce.

Contract Administration © Construction Management Association of America. Do Not Duplicate or Reproduce. Objectives are to control: - Time - Cost - Quality - Information - Safety

Contract Administration: Pre-Design Phase © Construction Management Association of America. Do Not Duplicate or Reproduce.  Develop the following : - Construction Management Plan - Project Procedures - Management Information System - Quality Management Plan - Communications Procedures - A master schedule, a milestone schedule  Identify possible project delivery methods  Manage designer selection / contract form

Documentation: Records and Management Plan © Construction Management Association of America. Do Not Duplicate or Reproduce.  Organization  Project Documentation  Tracking and follow-up  Software utilized

Safety © Construction Management Association of America. Do Not Duplicate or Reproduce. Employee Safety and Health - Safety program / accident prevention program - Management and employee accountability - Safety orientation - Hazard recognition and awareness training Usually, the contractor provides “safe” access to the work for inspection - Employee guidelines for handling safety issues

CM & Safety Program © Construction Management Association of America. Do Not Duplicate or Reproduce.  Management commitment  Accountability  Employee buy-in  Hazard communication  Safety should be equal to current programs  Establish a safety committee to help develop the plan

Program Management © Construction Management Association of America. Do Not Duplicate or Reproduce. In the context of the construction industry, program management is the application of Construction Management to large, complex or multiple capital improvement projects.

 Owner’s road map to success  Defines vision, strategy, schedule and budget criteria, policies, procedures and standards.  Provides a level of continuity and standar­ dization

Sustainability  Common features of a sustainable project  Customize construction management tools for a project with sustainability goals and requirements  Sustainability Plan  Sustainability Review  CM leadership to achieve a project’s sustainability goals and requirements  Evaluate the effectiveness of management systems in achieving a project’s sustainability goals

 Risk Identification  Include those with most project knowledge  Facilitate open thinking during identification  Identify potential impacts of risks identified  Keep expectations realistic  Develop a tracking report (Risk Register)

 Risk Analysis  Likelihood  Severity  Categories risk element  Establish accountability  Prioritize efforts  Synthesize risk

 Communication and Reporting ◦ Tracking ◦ Mitigation ◦ Resolution  Avoidance  Mitigation  Transfer  Acceptance

A process by which a representation of physical and functional characteristics of a facility are captured in a digital model, analyzed, documented, and assessed virtually, then revised iteratively through the design and construction process 39

 Can vary significantly from project-to-project based on the extent of adoption of the BIM process and the selected project delivery method  At the project outset, the CM must guide the project team in the selection and adoption of the most appropriate and best-fit BIM approach based on: o Project Characteristics o Owner Buy-in o Project team Capabilities o Cost-Benefit Considerations 40

To fulfill his/her role and meet his/her responsibility through the project, the CM must: 1.Stay current on the BIM process 2.Educate the Owner and project team on the benefits, features, limitations of BIM 3.Maintain its leadership role in the project delivery process with appropriate application of BIM 4.Have clear communication with the stakeholders during the implementation of BIM

Person who has met prescribed criteria of the CCM program relative to: ◦ Formal education and general construction industry experience ◦ Documented, successful Construction Management experience ◦ Demonstrated capability and understanding of CMAA Body of Knowledge

Defines its own Standards of Practice and values Identifies those best qualified to practice Construction Management Offers an assurance of quality to those who employ Certified Construction Managers

The “Culture of Certification” describes a business environment in which it is simply assumed, at all levels, that the best and most committed Construction Managers will be CCMs, and in which organizations actively and consistently support their people in obtaining and maintaining their credentials. Increasing numbers of organizations, both owner and service providers, are adopting this outlook and focus

 Increased professional stature & marketability  Creates opportunity for advancement  Adds value for both employer and client  Tells owners, employers and peers you are a recognized professional.  Employers rewarding achievement with bonuses and salary adjustments  Access to professional community to network with other CCMs  Continuing professional development required to maintain credential

 Independent assessment of CM staff knowledge and skills based on national standards  National certification means “portable” credentials  Improved company marketability  Your employees continue to improve  Owners increasingly giving formal preference in evaluations

 First Industry Professional Certification Program to Achieve ANSI/ISO/IEC Personnel Certification Accreditation by the American National Standards Institute (ANSI)  Process and Procedures Adhere to an International Standard of Excellence that is mobile and in the Interest of Public Welfare  Provides Assurance of Legitimacy © Construction Management Association of America. Do Not Duplicate or Reproduce.

Must have 48 months Responsible-In-Charge(RIC) experience as a CM/PM as shown on Qualification Matrix AND one of the following: 4-year Degree from an Accredited Educational Institution Construction Management, Architecture, Engineering (mulitiple disciplines), or Construction Science Accrediting body recognized by CHEA or the US Dept. of Education 2-year Degree & 4 years experience in general design/construction 8 Years experience in general design/construction

“Did the decisions that the candidate was empowered to make directly impact the successful completion of the project and was the candidate directly responsible in charge of construction management services and for protecting the interests of the project and the owner?”

PHASE:Pre-designDesignProcurementConstructionPost-construction FUNCTION/ ROLE Project Management RIC Cost Management RIC Time Management RIC Quality Management RIC Contract Administration RIC Safety Management RIC RIC Experience > Minimum Total of 48 months cumulative experience required in these Phases & Function/Roles

Kate Brundage Certification Manager 7926 Jones Branch Drive, Suite 800 McLean, Virginia USA Tel: Fax: CMAA Contact Dennis Doran VP, Professional Development 7926 Jones Branch Drive, Suite 800 McLean, Virginia USA Tel: Fax: