JHP Case Study Exercise 1 UNCLASSIFIED notional data for notional program.

Slides:



Advertisements
Similar presentations

Advertisements

1 Application/case based GS 9-12 & E7-O4 Experience: 2 yrs Level II Certification LOG 201 Intermediate Acquisition Logistics LOG 201 Intermediate Acquisition.
JHP Case Study Introduction 1 UNCLASSIFIED notional data for notional program.
O&S Cost Estimating JHP Case Study 1 UNCLASSIFIED notional data for notional program.
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
EPLC Deliverables Sherry Brown-Scoggins & Wanda Hall
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Microsoft Office Project Portfolio Server
OASD Logistics and Materiel Readiness
Cost 101 for Life Cycle Logisticians R&D Cost: program costs primarily associated with the development of a new or improved capability to the point where.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies R&M Engineering 08/16/11 Page 1 DTM R&M Engineering.
1 BCF-215: Course Admin and Overview Course Administration and Overview 10/12/2010.
1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN.
LOG 101 Curriculum Review 16 Jul 04 Richard A. Andrews, CPL Course Manager.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
Life Cycle Logistics.
LOG 236 Curriculum Review 15 Jan 2010 Curriculum Review LOG 236 Performance Based Logistics Presented to the Life Cycle Logistics (LCL) Functional Integrated.
Grant Closing February 4, Grant funds ending vs. program ending Usually happens at the end of the grant cycle On rare occasions can happen before.
1 Life Cycle Logistics FIPT FIPT Action Items 19 OCT 12.
LOG 101 Curriculum Review 16 Oct 2009 Curriculum Review LOG 101 Acquisition Logistics Fundamentals Presented to the Life Cycle Logistics (LCL) Functional.
Strategic Vision Life Cycle Logistics Functional IPT Mrs. Sue Dryden DASD(Materiel Readiness) January 13, 2012.
DAU Life Cycle Logistics Curriculum Review Presented to the Life Cycle Logistics Functional Integrated Product Team (FIPT) 23 JAN 2015.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
Materiel Development Decision (MDD) Information Requirements
LOG235/236 Performance Based Logistics Bruce Hatlem Logistics Functional IPT September 2007.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
ARMY CAUCUS DSP Conference 23 May Army Caucus Recommendations Problem: The Army Standardization Program’s products and services are not recognized.
LOG 235 Performance Based Logistics On the Move: Fielding Expected June 03 Dr. Russell A. Vacante CDSC DAU Thursday 24 October /02 LOG 235.
1 Alan Estevez | Principal Assistant Deputy Under Secretary of Defense Logistics & Materiel Readiness April 15, 2008 DAU Annual Acquisition Community Symposium.
Business, Cost Estimating & Financial Management Considerations
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Contracting (Product) Considerations
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Implementing Will-Cost & Should-Cost Management
Service Management World Class Operations - Impact Workshop.
Summary of Changes to the
PSM Lessons Learned Background
Materiel Solution Analysis (MSA) Phase
Status of the Planning Working Group’s (PWG) Efforts
Production Considerations
Milestone A to Milestone B Requirements Management Activities
Product Support Strategy Demonstrated Performance
ISA 201 Intermediate Information Systems Acquisition
Life Cycle Logistics DAWIA Certification Requirements (FY18)
Product Support BCA Exercise – JRATS/JTAMS
ISA 201 Intermediate Information Systems Acquisition
JTAMS PRE-MILESTONE B ANALYSIS
Test and Evaluation Considerations
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
DAU Acquisition Training Symposium April 3, 2018
A B C Solution Analysis Technology Maturation & Risk Reduction
Sustainment Reporting CADE Sustainment Reporting
Product Support Considerations
Adjustments required for program or funding changes Options
Revised DSOR Process Chart for Initial DSOR Decision
Updating the System Milestones
Product Support Strategy
Fielding plan details and adjustments
Fielding plan details and adjustments
CAMELOT Coordination Analysis Motivation Execution Logistics Tracking
Product Support Strategy Demonstrated Performance
Training: An Element of Integrated Product Support
Preventive Maintenance Service Agreement
Research Administration Forum Grants and Contracts Administration
Presentation transcript:

JHP Case Study Exercise 1 UNCLASSIFIED notional data for notional program

Purpose Apply Learning from the Workshop Prepare a Quad Chart for the Pre-RFP DAB Prepare Sustainment Should Cost Initiatives Ensure the DRAFT LCSP (for the DAB) is updated 2 UNCLASSIFIED notional data for notional program

Joint Helicopter Program LCSP – Support equipment is GFE and sustained by contractor Does this make sense? “Each Service would stand up organic government Depots” – Is this least-cost? – Other benefits? – When does throughout justify additional repair lines? Service-unique school houses to train the operators and maintainers – A Sustainment Business Case Analysis (BCA) should be performed to prove that this is the ideal strategy for the system UNCLASSIFIED notional data for notional program 3

Milestone A Quad Chart UNCLASSIFIED - notional data for notional program 4 LCSP Update Product Support Strategy Final Metric HH-60 Actual JHP Original Goal JHP Current Goal Current Estimate / Actual Materiel Availability 58.4%83% Materiel Reliability: 20.5 hrs 0.25 hrs >28.5 hrs >0.30 hrs >28.5 hrs >0.30 hrs >28.5 hrs >0.30 hrs Mean Down Time 26.0 hrs≤20.8 hrs O&S Cost (BY2013$M) $32.62M $30.58M Sustainment Schedule O&S Data (Annual BY2013$M) 1 MS B MS C IOC FRP FY12 FY14 FY16 FY18 FY20 FY22 Contract Award  Performance based strategy throughout life cycle  2-level Mx Concept (same as HH-66)  ICS then transfer to Organic (O & D)  Field Service Rep (FSR) support O-level Issues  None Resolution  None BCA CDR IOT&E FSR Support Organic O Lvl CLA Metrics Data 4 Draft BCA Interim Supply Support BCA MTBCF MTBM MS A Sustainment Approach Date: Feb 12, 2013 LCSP Final Draft Organic D Lvl LCSP Update Final Draft LCSP Update Final Draft Cost Element HH-66 Estimate BY2013$K/system/year JHP Estimate BY2013$K/system/year 1.0 Unit-Level Manpower$892.13$ Unit Operations$562.11$ Maintenance$2,415.00$1, Sustaining Support$21.25$ Cont. Sys Improvements$ Indirect Support$84.09$73.31 Total$4,078.08$3, Total O&S CostsHH-66JHP BY2013$M$32,624.66$27, TY$$37, Note 1: Quantity of 400 aircraft with a service life of 20 years each.

UNCLASSIFIED - notional data for notional program 5 Tracking O&S Costs through the DAB charts 5 UNCLASSIFIED notional data for notional program “Sand” Chart “Spruill” Chart “Quad” Chart Portfolio Data Data O&S Data DRAFT “O&S Spruill” Chart (DRAFT)

UNCLASSIFIED - notional data for notional program 6 LCSP Update Product Support Strategy Final Metric HH-60 Actual JHP Original Goal JHP Current Goal Current Estimate / Actual Materiel Availability 58.4%83% Materiel Reliability: 20.5 hrs 0.25 hrs >28.5 hrs >0.30 hrs >28.5 hrs >0.30 hrs >28.5 hrs >0.30 hrs Mean Down Time 26.0 hrs≤20.8 hrs O&S Cost (BY2013$M) $32.62M $30.58M Sustainment Schedule O&S Data (Annual BY2013$M) 1 MS B MS C IOC FRP FY12 FY14 FY16 FY18 FY20 FY22 Contract Award  Partnering for Depot  Leverage Existing Sustainment Structure  Organic (O & D)  Limited Field Service Rep (FSR) support Issues  O&S Cost versus O&S Cap Resolution  Monitor Closely BCA CDR IOT&E FSR Support Organic O Lvl CLA Metrics Data 6 Draft BCA Interim Supply Support BCA MTBCF MTBM MS A Sustainment Approach Date: Sept 20, 2014 LCSP Final Draft Organic D Lvl LCSP Update Final Draft LCSP Update Final Draft Cost Element HH-66 Estimate BY2013$K/system/year JHP Estimate BY2013$K/system/year 1.0 Unit-Level Manpower$892.13$ Unit Operations$562.11$ Maintenance$2,415.00$1, Sustaining Support$21.25$ Cont. Sys Improvements$ Indirect Support$84.09$73.31 Total$4,078.08$3, Total O&S CostsHH-66JHP BY2013$M$32,624.66$27, TY$$37, Note 1: Quantity of 400 aircraft with a service life of 20 years each.

Proposed Initiatives to Assess UNCLASSIFIED - notional data for notional program 7 Shorten Period of ICS and FSRs? Combine School Houses? Leverage Existing Sustainment Structure Could the GFE SE be supported organically? – Would probably require a Performance Based Agreement to ensure the SE meets the contractor requirements Other?

Other Document Updates Update RFP – Include Contractor Option to pursue best value solutions via partnering with organic depots – What Else? Update SOW – Include corrosion requirements – What Else? UNCLASSIFIED notional data for notional program 8

QUESTIONS? UNCLASSIFIED - notional data for notional program 9