Presentation is loading. Please wait.

Presentation is loading. Please wait.

Fielding plan details and adjustments

Similar presentations


Presentation on theme: "Fielding plan details and adjustments"— Presentation transcript:

1 Fielding plan details and adjustments
Operations & Support B Technology Development Engineering and Manufacturing Development Production & Deployment C LRIP/IOT&E Materiel Solution Analysis FRP IOC Acquisition Sustainment A Product support package elements refined Detailed site fielding plans refined Sustaining Engineering Logistics assessments LCSP Focus Fielding plan details and adjustments How sustainment performance requirements will be measured, managed, assessed and reported (Availability/Reliability/Maintainability/Affordability) Identification of Sustainment Risks/Issues and Resolutions Design demonstrated/Early Fielding Issues Analytical and management processes for : Refining product support package elements Fielded performance management and metrics Cost drivers and availability degraders Refinement of Resource Requirements/Workload Estimates/Cost Estimates Should Cost Initiatives


Download ppt "Fielding plan details and adjustments"

Similar presentations


Ads by Google