Status Report of the WLTP coasting TF

Slides:



Advertisements
Similar presentations
OIL#19 Alternative warm-up procedure (JAPAN proposal) 14th of January, 2015 WLTP rev1e.
Advertisements

Working Paper No. WLTP-09-07e 1 Agenda item 5: Progress report on Downscaling / Gearshifting (OIL #4-9) by H. Steven th WLTP IG meeting, 14.
WLTP drive trace normalization
Applicability of Driving Index
Status Report of the WLTP coasting Task Force Author: Thomas Vogel (chairman) WLTP IG, 9 th meeting, Geneva, Jan 2015 WLTP-09-15e.
WLTP-08-19e BMW, Christoph Lueginger WLTP Road Load Family
1 Comparison of WLTP unified database distributions and WLTC rev2 distributions Heinz Steven WLTP WLTP-DHC
WLTP Phase 1B Main Open Issues Road and Dyno Load Presentation at WLTP IG Meeting Geneva Open Issues Road and Dyno Load- K. Kolesa Working paper.
WLTP DRAFTING TF, "RECORDED" BMW, Christoph Lueginger DISTINGUISH BETWEEN MEASURED AND RECORDED.
WLTP OIL #6, annex 2, sections 3.2 and 3.3 Determination of engine speeds, calculation of available power.
Informal document No. GRPE (63rd GRPE, Jan. 2012, agenda item 3(a)) 1 1 Progress Report of World-wide Light-duty Test Cycle Prepared by DHC.
Working paper number WLTP-DHC Application of the development approach described in WLTP-DHC on ACEA’s EU database By H. Steven
GS/ESC | 21/05/2014 | © Robert Bosch GmbH All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as.
1 Proposal for a downscaling procedure for the extra high speed phases of the WLTC for low powered vehicles within a vehicle class Technical justification.
Progress report of Sub Group EV (WLTP-12-19e) draft 1. Proposals for adoption 2. Discussion points.
WLTP-DHC Validation Phase I Results and Recommendations by India
WLTP-12-17e Status report about the work of the gearshift issues task force.
Renault statements and questions: Page Autor/Abt.: ACEA WLTP EV Group /Samarendra Tripathy 1] Phase specific calculation (appendix YYY of attached.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
WLTP, result calculation, v6
1 Comments on the Ste 3 gearshift calculation tool from validation 2 participants Heinz Steven WLTP WLTP-DHC
Coasting in WLTP Bosch proposal Invented for life
NEDC/WLTP correlation process Meeting of TCMV on 17 November 2015
Proposed by Japan GRPE/WLTP-IG/ DHC subgroup
WLTP-12-17e Status report about the work of the gearshift issues task force.
25 January 2016 European Commission - Joint Research Centre (JRC)
1 Comparison of the worldwide weighted WLTP database and EU regional database with WLTC rev3 and further modifications performed by JARI, JRC and HS Heinz.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-081 Leader: Per Ohlund / Kazuki Kobayashi.
WLTP-DHC Development of World-wide Light- duty Test Cycle -- Proposal for the threshold vehicle speed of Low/Middle/High(/extra-High) phase --
Joint Research Centre the European Commission's in-house science service NON-EXHAUST PARTICLE EMISSIONS.
Starting note on gearshift issues
WLTP-DHC Analysis of in-use driving behaviour data, influence of different parameters By Heinz Steven
India’s Comments on EPPR (Part-B2)
Study on Drive Trace Index of Electrified Vehicles
Progress Report of World-wide Light-duty Test Cycle
WLTP-14-15e Progress report of Sub Group EV (WLTP-14-15e) 14th WLTP IWG 26 April 2016.
Improvement of Wind tunnel Measurement Process Status report
WLTP Modelling of fuel consumption and detection of driveability problems for “borderline” cars with different maximum speed caps. Heinz Steven
Fuel consumption measurement in LDVs WLTP 2nd act Working Group
RDE Regulation Commission Meeting
HD FE Harmonization OICA HD-FE TF Y. Takenaka
Questions on cycle representativeness
RDE Task Force Meeting, 28th November 2013, Brussels
Comparison of different gearshift prescriptions
BRAKE PARTICLE EMISSIONS
Current status of WLTP-DHC
WLTP-DTP-LabProcICE-229
Additional RDE trip indicator(s)
ACEA Comments from ACEA still does not understand the reasoning for this proposal. This proposal increases the test burden disproportionally.
Institute for Internal Combustion Engines and Thermodynamics
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 1/2/2019.
WLTP Validation2 for RLD ~ Validation test plan by Japan ~
J. Pavlovic, A. Marotta, B. Ciuffo WLTP 2nd Act May 18th, 2017
1. Summary # items RESULTS status remarks EV_1 HEV system power
WLTP Comparison of WLTP unified database distributions and WLTC rev2 distributions Heinz Steven
Purchasing Supplier Development European Supplier Day
Boundary conditions - Status
WLTP/DHC meeting on 29th March 2012 at Ispra, Italy.
J. Pavlovic, A. Marotta, B. Ciuffo WLTP 2nd Act March 15th, 2017
WLTP Modelling of fuel consumption and detection of driveability problems for “borderline” cars with different maximum speed caps. Heinz Steven
GRPE/WLTP-IG/ DHC subgroup
Discussion paper on Applicable Test Cycle and Mode Construction
Discussion paper on Applicable Test Cycle and Mode Construction
Progress report of Sub Group EV (WLTP-12-19e) 1
WLTP-26-03e - Revision 1 Final amendments for annex 2 and status report about the programming code development subgroup Heinz Steven
Title : Alternative warm-up procedure WLTP rev1e by Japan
LAT Technology Modeling
WLTP/DHC meeting on 29th March 2012 at Ispra, Italy.
Palais des Nations, Geneva
GRPE/WLTP-IG/ DHC subgroup
Presentation transcript:

Status Report of the WLTP coasting TF WLTP-08-32e Status Report of the WLTP coasting TF Author: Thomas Vogel (chairman) Presenter: Heinz Steven with contributions from the Bosch presentation at the WLTP coasting TF telco at 06.11.2014 WLTP IG, 8th meeting, Pune, Nov 2014

Coasting TF proposals (reviewed since 7th WLTP IG) 1 2 3 Synthetic differential supplemental CO2 test: Combine different coast sequences, which represent real life coasting time share and WLTP speed distribution. Compare cycle with different deceleration: engine drag vs. coasting Weighted CO2 difference of original WLTP vs. modified WLTP (PSA proposal) CO2 final = CO2 WLTP original + Utility Factor * (CO2 WLTP coast modified – CO2 WLTP original) Post calculated CO2 difference: accumulate filtered 1Hz resolved CO2 measured data from the WLTP test (Bosch proposal) as base for further discussion Agreed by EU & Japan Rejected by Japan Rejected by Japan 2x ~15 min hot CO2 test 2x hot WLTP or 1x cold ~5 min coast function test

Japan position regarding Coasting Japan cannot support PSA proposal, because it is cycle modification. Japan has no objection to continue discussion with Bosch proposal on WLTP level. A methodology needs to address the following concerns and confirmed by data before adopted. The methodology is able to evaluate various kind of sailing (coasting) technologies fairly. The methodology must be robust and reflect real-world CO2 benefit. (regional difference/driver-behavior difference etc) The methodology doesn't create CO2 flexibility. 1 2 3

Remaining 3rd proposal (Bosch) Perform cold unmodified WLTP test: with disabled coasting function. Measure modal CO2 or use (bag normalized) OBD fuel flow data (1Hz resolved time aligned CO2 data) OEM declares (coast calculation critical) parameters prove with a simple supplemental test (no CO2 measurement) Post calculation: with variable filtered measured WLTP 1Hz data accumulate delta CO2, until time share meets a Coast Time Share (CTS*1800s) target, Correct for SOC & engine restart energies

Proof of Technology & Op. Strategy while TA Coasting in WLTP - Bosch Proposal Proof of Technology & Op. Strategy while TA Additional simple test procedure, conducted after std. TA measurements (no CO2 measurement !) OEM has to declare his implemented Coasting strategy in advance. Relevant parameters: entry and exit speed limits, IDC vs. SSC speed limits, delay time(s) completeness to be checked Vehicle driving short test on dyno (e.g. 5 min, vehicle warm) consisting of different constant speed levels & following coast down to a minimum speed (e.g. 15km/h). Indication to test driver of act. speed, act. gear (MT) & when to release gaspedal measured parameters tbd. proposal: vehicle speed, engine speed, powertrain connected/disconnected condition Output of test: Proof of technology Operating strategy according OEM statement. time speed Gasoline Systems Confidential | GS/ESC | 06/11/2014 | © Robert Bosch GmbH 2014. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.

Calculation Sequence Coasting in WLTP/Bosch Proposal vmin, vmax INPUT ALGORITHM OUTPUT Measurement data vehicle parameter: mass, friction, … vehicle speed fuel consumption (mass flow) Pre-Calculation vehicle driving power acceleration Limitations vmin, vmax amin, amax Restrict data points Vehicle speed in range Acceleration in range Determine Coasting Phases Identify data points i w/ vehicle power demand < power threshold calculate coasting time (sum of data points) preset Pthreshold Real life coasting coasting time share tcoast time share reached? Coasting implementation quality in vehicle NO: increase power threshold Post-Calculation Replace fuel consumption of data points i w/ coasting w/ engine on  idle consumption coasting w/ engine off  zero consumption idle consumption mfidle coasting benefit S replaced fuel consumptions Gasoline Systems Confidential | GS/ESC | 06/11/2014 | © Robert Bosch GmbH 2014. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.

Coasting Share  CO2 Benefit in WLTC Coasting in WLTP/Bosch Proposal Coasting Share  CO2 Benefit in WLTC Variation of coasting time share compares to: variation of power threshold 10 kW 6 kW 4 kW 3 kW 2 kW 1 kW 0.1 kW A3_WLTC.xlsx: '2012_10_16_A3_Yoshi_WLTC_SiG_Ref_01.mat‘ mf_idle = 0.18 g/s, 200W powernet Reference: Data WLTC measurement on test bench, Audi A3 1.4L TSI, MT6 Time resolved fuel consumption measured by test bench equipment (sample rate1 Hz) Gasoline Systems Confidential | GS/ESC | 06/11/2014 | © Robert Bosch GmbH 2014. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.

Coasting Share: Representative average base value Coasting in WLTP/Bosch Proposal Coasting Share: Representative average base value Coasting time shares are based on driver statics influenced by: Regional infrastructure: grade, roads, traffic, Coast function implementation: driver info, navi, Average Coasting Time Share found: 25%* (=30% Coasting Distance Share) GER route: FKFS near Stuttgart: 17%...35% (Audi A3, probands, normal driving) US route: Farmington Hill cycle: 22%** (average of 11%...56%) JRC Monograph: Porsche field data indicate 26% CTS Representative average base value for most vehicles & drivers Additional tests shall show regional & implementation influence 25% CTS assumed to be representative base (for BOSCH implementation) Operating strategy has to be considered in algorithm * Base: BOSCH Operating Strategy, based on total cycle time/distance with powertrain open until engine re-start @vehicle speed ≥0km/h ** VW Passat with DCT Gasoline Systems Confidential | GS/ESC | 06/11/2014 | © Robert Bosch GmbH 2014. All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution, as well as in the event of applications for industrial property rights.

Next steps of Coasting TF Review calculation methodology in detail Calculation method (Excel sheet) Vehicle bandwidth study Discuss possible / recommended modifications Time resolved CO2 measurement alternatives Distance compensation in calculation Plan for additional tests to determine Coasting Time Share Review existing coast data OEM to deliver vehicles for additional tests Institutes to perform tests or witness OEM tests