Drew Baden, UMD Nov 20001 HCAL Trigger/Readout CMS/Tridas November 2000 Drew Baden, Tullio Grassi University of Maryland.

Slides:



Advertisements
Similar presentations
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
Advertisements

CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
USCMS/Rochester. Oct 20, 2001HCAL TriDAS1 HCAL TPG and Readout CMS HCal meeting at Rochester Oct Oct 2001 Tullio Grassi, Drew Baden University of.
CMS/HCAL/TriDas. Sept, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland September 2003.
CMS ESR. May, 2004 HCAL TriDAS 1 HCAL TPG Status Tullio Grassi University of Maryland May 2004.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HCAL Group.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
HCAL Trigger Primitive Generator Tullio Grassi University of Maryland September 2004.
CMS/HCAL/TriDas. Dec, 2003 HCAL TriDAS 1 Clocking Drew Baden University of Maryland December 2003.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
HCAL/TriDas. November, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland November 2003.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Drew Baden, UMD Nov HCAL Trigger/Readout Texas Tech Meeting February 2001 Drew Baden, Tullio Grassi University of Maryland.
CMS/HCAL/TriDas. Mar, 2004 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland March 2004.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL TPG and Readout CMS HCAL Readout Status CERN Tullio Grassi, Drew Baden University of Maryland Jim Rohlf Boston University.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
21-Jun-2005 HCAL TriDAS 1 HCAL TriDAS Status Drew Baden, University of Maryland For the HCAL Group: Boston University Fermilab Princeton University University.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
CMS Electronics Week November Electronics Issues Drew Baden University of Maryland USCMS HCAL.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Slice Test (SLT) of TGC electronics Introduction Simulation Trigger part SLT Wire Wire and Signal.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Technical Part Laura Sartori. - System Overview - Hardware Configuration : description of the main tasks - L2 Decision CPU: algorithm timing analysis.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CMS/CERN. June, HCAL TPG and Readout CMS HCAL Readout Status CERN Drew Baden University of Maryland June 2002
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
The L0 Calorimeter Trigger U. Marconi On behalf of the Bologna Group CSN1, Catania 16/9/02.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
13-Feb-2004 HCAL TriDAS 1 HCAL Tridas SLHC Drew Baden University of Maryland February 2004.
1 Level 1 Pre Processor and Interface L1PPI Guido Haefeli L1 Review 14. June 2002.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
Possible SLHC Modifications to Clock Distribution Chris Tully, Dan Marlow Princeton Madison, Wisconsin February 13, 2003 Current SLB Clock Distribution.
Feb 2002 HTR Status CMS HCal meeting at FIT Feb. 7-9, 2002 Tullio Grassi University of Maryland.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
25 Sept 2001Tullio Grassi From MAPLD2001 ( space community conference ) Major causes of failures.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
The CMS HCAL Data Concentrator: A Modular, Standards-based Design
DAQ and TTC Integration For MicroTCA in CMS
HCAL DAQ Path Upgrades Current DCC Status New DCC Hardware Software
ATLAS calorimeter and topological trigger upgrades for Phase 1
14-BIT Custom ADC Board Rev. B
The CMS HCAL Data Concentrator: A Modular, Standards-based Design
HCAL Data Concentrator Production Status
The CMS HCAL Data Concentrator: A Modular, Standards-based Design
CMS EMU TRIGGER ELECTRONICS
CMS SLHC Calorimeter Trigger Upgrade,
Vertex 2005 November 7-11, 2005 Chuzenji Lake, Nikko, Japan
ECAL OD Electronic Workshop 7-8/04/2005
Calorimeter Trigger Synchronization in CMS,
TTC system and test synchronization
Introduction HCAL Front-End Readout and Trigger Joint effort between:
Geneve The Alps Where is CERN? Jura Mountains Lake Geneva 18-Sep-18
HCAL Configuration Issues
Synchronization Policy: HCAL will follow ECAL as much as possible
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
USCMS HCAL FERU: Front End Readout Unit
Lehman 2000 Project Timeline
Data Concentrator Card and Test System for the CMS ECAL Readout
HCAL DAQ Interface Eric Hazen Jim Rohlf Shouxiang Wu Boston University
Presentation transcript:

Drew Baden, UMD Nov HCAL Trigger/Readout CMS/Tridas November 2000 Drew Baden, Tullio Grassi University of Maryland

Drew Baden, UMD Nov Outline ® Trigger/DAQ Demonstrator project ® Simulation studies ® Level 1 Latency

Drew Baden, UMD Nov Demonstrator Requirements ® Test functionality of system “LPD” functions Synchronization Pipeline maintenance ® Will not test hardware implementation Some cards will be 6U versions Will not worry about TTC fanout or PLLs on front-end ® Most important goal: What considerations have not been anticipated for integration into TRIDAS

Drew Baden, UMD Nov HTR Demonstrator System Design ® Front-end and LHC emulator Fiber data source for HTR  Uses crystal clock Signals for TTC ® HTR demonstrators Data inputs TTCrx daughterboard TPG output ® TTC system TTCvi TTCvx ® DCC demonstrator Full 9U card ® Level 1 “Emulator” Use existing DØ card  Cypress inputs  Lots of FIFO  VME output  FPGA 10k100 ® Crate CPU Commercial card Running Linux TTCrx HTR Demonstrator TTCvi/TTCvx Data Clock (etc) FE/LHC Emulator TTCrx HTR Demonstrator DCC Demonstrator TTCrx TTC Commercial CPU Level 1 “Emulator” TPG Output

Drew Baden, UMD Nov Front End/LHC Emulator ® 6U VME board ® 8 fiber data outputs simulates HCAL ® System signals: Internal 40MHz crystal + FPGA (Altera 10k50) Generates master clock, L1A, and BC0 All are ECL outputs ® LHC pattern generated internally ® Layout almost complete, ready for fab

Drew Baden, UMD Nov HTR Demonstrator ® 6U VME board ® 2 Dual Optical Rx (4 fibers) ® HP deserializer chips ® TTCrx daughterboard ® APEX 20k400 Has enough memory ® LVDS output to DCC ® SLB footprint for TPG output ® Layout complete and ready for fab

Drew Baden, UMD Nov Testing Goals TPG ® Receiving optical data G-links clock recovery Asynchronous FIFO TTC clock ® Maintain pipeline With error reporting ® Crossing determination Send data to HTR demo coincident with selected 25ns time bucket Recover this particular 25ns time bucket DeserializerO-to-E “n” Optical “1” WCLK Recovered Clock RCLK “n” TTC Clock

Drew Baden, UMD Nov Testing Goals TPG ® Synchronization All TPG data from same bucket are aligned for transmit to L1 trigger Use of Synch Chip on our boards ® From L1A, verify correct data gets into DCC ® TPG output needs a source! Build our own “SLB” with PLD and Cypress output Send Address of TPG (relative to BC0) to D0 card  Already built, tested, works fine  Has multiple Cypress inputs, 64kByte FIFO, FPGA (10k100) and VME out  Can do some comparisons of multiple HTR TPG output to verify synchronization on output Synch Chip TTC Clock TPG out PLD MAIN FPGA Cypress out

Drew Baden, UMD Nov DCC Logic Layout ® TTCrx ® Data from 18 HTR buffered in iFIFO dual PCI buses, 9 HTR per PCI ® Large FPGA reads events from FIFO distributes to 4 FIFO-like streams Each stream can prescale events and/or select by header bits. ® Local control FPGA provides independent access via VME/PCI for control/monitoring while running.

Drew Baden, UMD Nov Testing Goals DCC ® Input Test LVDS protocol from HTR Test (multiple) PCI interface and event building ® Buffers Multiple FIFOs for various functions  Output to L2/DAQ (all data)  Monitoring (preselected)  Trigger verification (prescaled)  Other? ® Error checking and monitoring Event number check against L1A from TTC  Demonstration of system-wide synch capability Line error monitoring  Built in Hamming ECC FIFO occupancy monitoring ® NO PLANS FOR CHECKING “s-link” output

Drew Baden, UMD Nov Schedule ® FEE/LHC Emulator Layout complete, under review Expect board by Dec 1  8 fiber output  Clock, L1A, BC0 to TTC ® HTR Layout almost complete, under review Expect board by Dec 1  6U, 4 fibers, VME, Vitesse (or LVDS?), LVDS, TTC, DCC output, etc. ® DCC Link receiver cards (PC-MIP) produced Dec 2000: DDC prototype ready ® Integration Begin by December 2000  FEE/LHC-E, HTR, DCC, TTC….integration  Goal: completed by early 2001

Drew Baden, UMD Nov HCAL Granularity Summary ® All readout towers in HB and HE participate in TPG sums HO is NOT in trigger HF is under negotiation and study ® Some overlap in tower 16 have 5 readout channels in single TPG sum Receiver card will handle it inside FPGA We will probably have 2 FPGA/card  Means no more than 16 readout channels/TPG sum

Drew Baden, UMD Nov HCAL Granularity HE Details ® HE – entire wedge will be in TPG 16 towers in   Towers 1-13 have 2 readout depths  Both depths will contribute to TPG  Tower 14 has 2 readout depths  Last depth has RBX cutout  Both will contribute to TPG  Tower has 3 readout depts  Last due to lack of HO  All 3 will contribute to TPG  Some HE towers will be added

Drew Baden, UMD Nov HCAL Granularity ® HE – entire wedge will be in TPG 13 towers in   Tower 16 has 2 readout depths  To be added to HB tower 16 TPG  Makes 5 total for that TPG tower  Towers have 2 readout depths  Towers have 4 readout depths  For radiation damage purposes

Drew Baden, UMD Nov Simulation ® Nominal HCAL pulse Front-end electronics respose ® QIE output per 25ns “bin” Energy should be associated with bin 0

Drew Baden, UMD Nov Pileup Studies (preliminary)  Start with  ’s with E T =30 GeV in single tower  =0.4,  =  /2 Consistent with HCAL dominating resolution

Drew Baden, UMD Nov Pileup Studies (preliminary) ® Form Trigger towers (TPG) Try ECAL algorithm with HCAL weights  Add energy in buckets [-4,+3] inclusive  Weights: [-.21, -.21, -.21, -.14, +.94, +.20, -.17, -.21]  Determined using ECAL method  Simpler method also being considered gives same answer  Use [-3,+1] weights [-1.5,-1.5,+1.0,+1.0,+1.0]  Under longer term study, is being pushed on ® TPG from HCAL+ECAL Increase in resolution from 5.4 to 5.6 GeV Shift in E T by about 2 GeV

Drew Baden, UMD Nov ® Contribution to TPG from HCAL alone 100 MeV threshold kills lots of small ECAL TPGs…. Pileup Studies (preliminary) 100 MeV TPG threshold All HCAL Some ECAL ETET After TPG quantization (units of 1 GeV)

Drew Baden, UMD Nov Simulation (cont) ® TPG vs “REAL” Correction is ~15% over decent ET range HCAL TPG E T “real” (from GEANT)

Drew Baden, UMD Nov L1 Latency Estimates ® HCAL TPG will use 5 trigger towers in the Level 1 Filter ® HCAL will follow ECAL as much as possible Same TTC distribution system  6 TTCvi/TTCex, optical splitting, etc.  LVDS fanout to receiver cards and DCC Use sync ASIC (or PLD) for TPG synch ® Have not yet begun simulation of FPGA logic ® Overall guess…. ….same requirements as ECAL ….fewer towers in sum ….simpler weighting ….we will be ok if ECAL is ok!