Status of the preparation for KEK test beam M. Yoshida (Osaka Univ.) MICE VC 2005/9/14.

Slides:



Advertisements
Similar presentations
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Advertisements

Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
Prototype Performance in D0 test stand M.Yoshida (Osaka Univ.)
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
VME readout fro TOF MICE Tracker Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Control, Monitoring and DAQ Makoto Yoshida Osaka Univ. MICE Frascati June 28, 2005.
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
DAQ for KEK beam test M.Yoshida (Osaka Univ.). Components VLPC readout –Stand Alone Sequencer (SASeq) Slow < 100Hz –Buffering VLPC data with VME interface.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
KEK TB Phase II setup status Alan Bross MICE Tracking Group Meeting Daresbury Lab August 30, 2005.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
Scintillating Fiber, Ribbon Production, Cryo Update Alan Bross MICE Tracker Meeting IC November 8, 2006.
1 G4MICE TOF Reconstruction & KEK Test Beam Analysis Update Aron Fish Tracker Phone Conference May 25, 2006.
TOF/ACC test Overview M. Yoshida Osaka Univ.. TOF / ACC in the prototype test For the prototype test in May, we will need PID: –TOF counter Distinguish.
Liquid-hydrogen absorber: Shigeru Ishimoto KEK Contents (1)Introduction (2)MICE absorber design (3)Prototype absorber test at KEK (4)MICE absorber instrumentation.
Fiber, Ribbon Production and Cryo Update Alan Bross Tracker Phone October 26, 2006.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
Tracker Summary Makoto Yoshida Osaka Univ. MICE Frascati June 28 th, 2005.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs – Me Comp1 11K hrs, Comp2 11K, Comp3 20K, Comp4 18K Service cold.
Review of Daresbury Workshop MICE DAQ Workshop Fermilab February 10, 2006 A. Bross.
1 Introduction to UniDAQ Makoto Yoshida (Osaka Univ.) MICE DAQ 2005/9/1.
MICE : the Muon Ionization Cooling Experiment M. Yoshida (Osaka Univ.) for the MICE Collaboration Osaka - Overview and Status -
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Takashi Matsushita Imperial College T. Matsushita 1 MICE Status Excerpt from talks at MuTAC review:
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE Phase 1 Koji Yoshimura KEK June
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
KEK beam test in May 2005 Makoto Yoshida Osaka Univ. MICE Frascati June 27 th, 2005.
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
2005/10/24 MICE CM at RAL, KEK test beam, Makoto Yoshida 1 KEK Beam Test for MICE SciFi Tracker - KEK-PS T585 - M. Yoshida MICE 2005/10/ /10/24.
KEK Test Beam Phase I (May 2005) Makoto Yoshida Osaka Univ. MICE-FT Daresbury Aug 30th, 2005.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Tracker Summary M. Yoshida (Osaka Univ.) MICE 2005.Feb.12 th.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
1 DATE-based DAQ Hideyuki Sakamoto CM22, RAL 19/10/08.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Plan for the KEK beam test in November 2007 and Beyond Satoru Uozumi (Shinshu) Oct-1 Japan-Korea KNU.
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
MICE Meeting at RAL, Oct-23, 2005
Preparation for Station Acceptance Test
Tracker Software Status
Presentation transcript:

Status of the preparation for KEK test beam M. Yoshida (Osaka Univ.) MICE VC 2005/9/14

VLPC Cryostat delivered to KEK Cryostat and the other equipments delivered to KEK on Aug. 24 th Cryostat and the other equipments delivered to KEK on Aug. 24 th Commissioning started by Alan and Japanese guys Commissioning started by Alan and Japanese guys Succeed to reach 6K Succeed to reach 6K Stable operation in 3 weeks Stable operation in 3 weeks

KEK-PS  2 exp. area Tracker prototype inside USHIWAKA spectrometer magnet VLPC Cryostat

Beside  2 area Power Supply to AFE He gas ctrl to Cryostat DAQ electronics Linux/Windows PCs Cryostat over the fence Compressor for Cryocooler

Cryostat LID heater against condensation Typhoon approaches to Japan in Aug. and Sept. Typhoon approaches to Japan in Aug. and Sept. High room temp. and high humidity High room temp. and high humidity Condensation on LID of Cryostat! Condensation on LID of Cryostat! Need to keep the LID temperature higher Need to keep the LID temperature higher

Electronics Bit3 interface VLSB TDCADCMIL-1553 SASEQ InterruptRegister Linux/Windows PC AFEII(CryostatBackplane) LVDS data links Slow Ctrl CLK/TRG

DAQ/CTRL program on Windows PC VB macro programs on Excel VB macro programs on Excel Check AFE functionality for each Check AFE functionality for each Initialization Initialization Diagnostics Diagnostics Data aquisition Data aquisition

Pedestal distribution AFE#104 AFE#105 AFE#106 AFE#107 channel number ADC counts

DAQ software on Linux PC (UNIDAQ)

Status / Schedule TOF hodoscope, Aerogel Cherenkov counter, defining counter and other beam counters are ready. TOF hodoscope, Aerogel Cherenkov counter, defining counter and other beam counters are ready. Cryostat works quite stably. Cryostat works quite stably. Electronics has been delivered. (although not for all channels of VLPC) Electronics has been delivered. (although not for all channels of VLPC) Improving DAQ with VLSB and VME ADCs/TDCs. Improving DAQ with VLSB and VME ADCs/TDCs. Continue preparation work by 4 or more Japanese colleagues Continue preparation work by 4 or more Japanese colleagues 5 from US, 4 from EU will join around Sept from US, 4 from EU will join around Sept from UK will join Sept. 20 to install tracker into solenoid magnet. 2 from UK will join Sept. 20 to install tracker into solenoid magnet. Sept. 20 : Remove USHIWAKA magnet and cleanup  2 area Sept. 20 : Remove USHIWAKA magnet and cleanup  2 area Sept. 21 Sept. 21 Set the solenoid magnet Set the solenoid magnet Install the tracker Install the tracker Install beam counters. Install beam counters. Sept. 27 : Accelerator tuning will be started Sept. 27 : Accelerator tuning will be started Sept. 28 : VLPC fully commissioning by experts from FNAL Sept. 28 : VLPC fully commissioning by experts from FNAL Sept. 29 : hopefully internal target ON, and beam could be provided to  2 although it is unstable Sept. 29 : hopefully internal target ON, and beam could be provided to  2 although it is unstable Tuning beam counters. Trigger setup. Tuning beam counters. Trigger setup. Oct. 3 – Oct. 7 : Stable beam. Oct. 3 – Oct. 7 : Stable beam.