California Association for Research in Astronomy W. M. Keck Observatory NGAO Next-Generation Adaptive Optics System NGAO Uptime Budget Keck NGAO Meeting.

Slides:



Advertisements
Similar presentations
Flow-down of Strategic Priorities to Annual and 5-year WMKO Plan Taft Armandroff Hilton Lewis September 18, 2009 Taft Armandroff Hilton Lewis September.
Advertisements

Scott Hamilton Bill Randolph University of Hawaii at Manoa W. M. Keck Observatory.
Highly Efficient Operations Keck Scientific Strategic Planning 2009 Hilton Lewis T. Armandroff, S. Adkins, R. Goodrich J. Johnson, K. Kinoshita, R. Matsuda.
1 Keck LGS AO Planning Workshop: Overview, Requirements & Schedule December 5, 2004.
RASC, Victoria, 1/08/06 The Future of Adaptive Optics Instrumentation David Andersen HIA.
Page 1 Lecture 12 Part 1: Laser Guide Stars, continued Part 2: Control Systems Intro Claire Max Astro 289, UC Santa Cruz February 14, 2013.
National Research Council Canada Conseil national de recherches Canada Observing Efficiency and Reliability of Gemini South MCAO Glen Herriot Herzberg.
Why do astronomers need AO? Lick Observatory, 1 m telescope Long exposure image Short exposure image: “speckles” With adaptive optics Three images of a.
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
AO188/LGS status AO188 development group(Subaru Telescope, NAOJ) (JST)
Laser Launch System for the LBT Richard Davies Sebastian Rabien Max Planck Institute for Extraterrestrial Physics  Approaches of other observatories 
NGAO Companion Sensitivity Performance Budget (WBS ) Rich Dekany, Ralf Flicker, Mike Liu, Chris Neyman, Bruce Macintosh NGAO meeting #6, 4/25/2007.
NGAO Controls Team Meeting August 29, 2008 Erik Johansson.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
LGS AO Operations Transition: Introduction to Meeting April 15, 2005.
System-wide issues Before we get to the telescope System integration and verification at the telescope Operations Maintenance and support.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/7/07.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
NGAO Control Systems Group Status, Plans & Issues NGAO Team Meeting August 19, 2008 Erik Johansson Jimmy Johnson, Doug Morrison, Ed Wetherell.
Functional Requirements Status and Plans Christopher Neyman W. M. Keck Observatory Viswa Velur California Institute of Technology Keck NGAO Team Meeting.
NGAO Report February 18, 2009 Waimea NGAO Report February 18, 2009 Waimea P. Wizinowich for the NGAO Team.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
Science Operations Update NGAO - Meeting 11 D. Le Mignant, E. McGrath & C. Max W. M. Keck Observatory 11/05/2007.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Laser Architecture Meeting Oct 1 st, 2007.
Science Operations Replan NGAO - Meeting 6 D. Le Mignant W. M. Keck Observatory 04/25/2007.
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Science Operations Plan NGAO - Meeting 10 D. Le Mignant W. M. Keck Observatory 09/17/2007.
NGAO interface control documents: Christopher Neyman W. M. Keck Observatory Keck NGAO PD phase Meeting #6 March 19, 2007 Videoconference.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/3/07.
Observing efficiency for NGAO 1.Definitions 2.Lessons learned a)Keck LGS AO “efficiency” b)Keck AO brute conclusion 3.Observing efficiency budget 4. Observing.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
The Future of AO at Keck Sept 2004 Mike Brown, for the AOWG and Keck AO team.
NGAO operations thoughts D. Le Mignant, E. Johansson, C. Neyman.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
NGAO Performance Flowdowns R. Dekany 02 September 2009.
Design Team Report: Laser Facility Chris Neyman Jim Bell, Erik Johansson, Jason Chin W. M. Keck Observatory Viswa Velur Caltech Optical Observatories Keck.
Encouraging “System Level” Thinking Christopher Neyman, Erik Johansson, David Le Mignant W. M. Keck Observatory Viswa Velur California Institute of Technology.
NGAO topical discussion: Observing Efficiency and Uptime Budgets Telecon Meeting 12/7 D. Le Mignant and E. Johansson 7 Dec Attendees; R. Campbell,
Functional Requirements Status and Plans Christopher Neyman & Erik Johansson W. M. Keck Observatory Viswa Velur California Institute of Technology Keck.
Keck Laser Guide Star Adaptive Optics System: 1 st & 2 nd Milestones AOWG Telecon Oct. 17, 2003 A. Bouchez, J. Chin, A. Contos, S. Hartman, E. Johansson,
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
WBS Non-RTC Controls Erik Johansson, Jason Chin, Don Gavel, Marc Reinig Oct 31 th, 2007.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
AO Opto-mechanical System Design Status, Issues, and Plans Don Gavel UCO/Lick Observatory (for the opto-mechanical design team) Keck NGAO Team Meeting.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
Telescope Errors for NGAO Christopher Neyman & Ralf Flicker W. M. Keck Observatory Keck NGAO Team Meeting #4 January 22, 2007 Hualalai Conference Room,
Build to Cost Meeting: Major NGAO system cost savings ideas Don Gavel NGAO Team Meeting September 11-12, 2008.
Reliable PVFS. High Performance I/O ? Three Categories of applications demand good I/O performance  Database management systems (DBMSs) Reading or writing.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
Instrumentation on OIR Large Telescopes – A Case Study S. R. Kulkarni Caltech Optical Observatories.
Next-Generation IDS: A CEP Use Case in 10 Minutes 3rd Draft – November 8, nd Event Processing Symposium Redwood Shores, California Tim Bass, CISSP.
“Twinkle, Twinkle Little Star”: An Introduction to Adaptive Optics Mt. Hamilton Visitor’s Night July 28, 2001.
MAORI Lisa Rightmire Mentor: Marcos van Dam. What is MAORI?  The indigenous tribal people of New Zealand  Marcos’ Adaptive Optics Rectangular Interface.
TMT.PMO.PRE REL011 Thirty Meter Telescope Background and Status.
W.M. Keck Observatory 26-April The next generation of EPICS at the W.M. Keck Observatory Presented by Jimmy Johnson, Kevin Tsubota.
Na Laser Guide Stars for CELT CfAO Workshop on Laser Guide Stars 99/12/07 Rich Dekany.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
Telescopes Telescopes only have a few jobs: 1)Point to a particular point on the sky 2)Collect lots of light and focus it onto a detector 3)Follow the.
Z Knight W.M. Keck Observatories Research Supervisor: Al Conrad Home Institution: University of Hawai'i at Hilo A Graphical User Interface for NIRC2 Asteroid.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Keck Precision Adaptive Optics Authors: Christopher Neyman 1, Richard Dekany 2, Mitchell Troy 3 and Peter Wizinowich 1. 1 W.M. Keck Observatory, 2 California.
Introduction of RAVEN Subaru Future Instrument Workshop Shin Oya (Subaru Telescope) Mitaka Adaptive Optics Lab Subaru Telescope Astronomical.
Keck Observatory Status
Laser(s) for Keck Observatory’s Next Generation AO (NGAO) System
Identify Program and Map System
NGAO topical discussion: Observing Efficiency and Uptime Budgets
NGAO Uptime Budget Keck NGAO Meeting #2 Tuesday, November 14, 2006
Presentation transcript:

California Association for Research in Astronomy W. M. Keck Observatory NGAO Next-Generation Adaptive Optics System NGAO Uptime Budget Keck NGAO Meeting #2 Tuesday, November 14, 2006 Erik Johansson

NGAO Next-Generation Adaptive Optics System 2 Roadmap to an uptime budget Review Keck AO statistics –Currently have LGS AO stats –Looking for NGS AO stats If not currently summarized, derive from Metrics database Attempt to get uptime statistics from other institutions Remove outliers –Failures with large downtimes that can be avoided in NGAO, e.g.: K2 Laser timing board failure with no spares K2 WFC crashes K2 Laser failures may not apply to NGAO laser(s) Use remaining statistics as a starting point for a budget Iterate and fine tune

NGAO Next-Generation Adaptive Optics System 3 Review of Keck II LGS AO uptime statistics Major contributors to system downtime: –AO Faults –Laser Faults –Other Faults (instrument + telescope) –Space Command (?) –Spotters (?) –Laser traffic control (?) Should all these categories be considered as downtime?

NGAO Next-Generation Adaptive Optics System 4

5 Conclusions Not all current Keck failures/downtime will map directly to NGAO Primary downtime drivers will be laser and AO system reliability Need to break down AO and Laser faults into finer granularity to draw more and better conclusions