Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams 2006 1 st part On behalf of the CALICE Collaboration.

Slides:



Advertisements
Similar presentations
CALICE Summary of 2006 testbeam for the ECAL
Advertisements

SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
The CALICE test beam at CERN Fabrizio Salvatore Royal Holloway University of London (on behalf of the Calice Collaboration) SPSC meeting, CERN, Geneva,
Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
November 3rd, 2006 CALICE-UK, Manchester - A.-M. Magnan - 1 Noise studies DESY + CERN TB overview Anne-Marie Magnan Imperial College London.
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
1 Calice Meeting 20/9/06David Ward What did we learn from DESY 2005 run? DESY run May CERN run August Data/MC comparisons for ECAL.
Calorimeter1 Understanding the Performance of CMS Calorimeter Seema Sharma,TIFR (On behalf of CMS HCAL)
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
March 6th, 2006CALICE meeting, UCL1 Position and angular resolution studies with ECAL TB prototype Introduction Linear fit method Results with 1, 2, 3,
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Simulation of the CALICE Test Beams with MOKKA Fabrizio Salvatore Royal Holloway University of London.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
Anne-Marie Magnan Imperial College London Kobe, May 11th, 2007 Calice meeting --- Anne-Marie Magnan 1 Status of MC reconstruction MC Reconstruction Chain.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
10 th November 2004Daniel Bowerman1 Dan Bowerman Imperial College Calice Meeting - UCL 10 th November 2004 Electronics Status For the Imperial, Manchester,
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
1 Calice UK 17/4/08David Ward Analysis highlights from Argonne meeting  Entirely plagiarised from other people’s talks:  Marcel Reinhard – calibration.
LCG Meeting, May 14th 2003 V. Daniel Elvira1 G4 (OSCAR_1_4_0) Validation of CMS HCal V. Daniel Elvira Fermilab.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Marco Delmastro 23/02/2006 Status of LAr EM performance andmeasurements fro CTB1 Status of LAr EM performance and measurements for CTB Overview Data -
1 Calice UK Meeting 27/03/07David Ward Plans; timescales for having analysis results for LCWS Status of current MC/data reconstruction Reconstruction status;
CALICE Digital Hadron Calorimeter: Calibration and Response to Pions and Positrons International Workshop on Future Linear Colliders LCWS 2013 November.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
© Imperial College LondonPage 1 Tracking & Ecal Positional/Angular Resolution Hakan Yilmaz.
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
1ECFA/Vienna 16/11/05D.R. Ward David Ward Compare these test beam data with Geant4 and Geant3 Monte Carlos. CALICE has tested an (incomplete) prototype.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Calice Meeting Argonne Muon identification with the hadron calorimeter Nicola D’Ascenzo.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Manqi Ruan Discussing & Support: Roman, Francois, Vincent, Supervisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua)) DQ Check for CERN Test.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
1 Calice Analysis 21/7/08David Ward Quick look at 2008 e - data; low energy hits in 2006  2008 e - data from Fermilab; July’08  Looked at several runs.
Understanding of SKIROC performance T. Frisson (LAL) On behalf of the SiW ECAL team Special thanks to the electronic and DAQ experts: Stéphane Callier,
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay ACFA/GDE Wordshop – TILC '08 Sendai Japan - Mar
Michele Faucci Giannelli
Analysis of LumiCal data from the 2010 testbeam
Beam test of Silicon-Tungsten Calorimeter Prototype
CALICE SiW Electromagnetic Calorimeter
CALICE scintillator HCAL
Status of Ecal(s) for ILD
Panagiotis Kokkas Univ. of Ioannina
Calice Collaboration Meeting Sep. 2009
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Rick Salcido Northern Illinois University For CALICE Collaboration
Michele Faucci Giannelli
Test Beam models in Mokka
Rick Salcido Northern Illinois University For CALICE Collaboration
Presentation transcript:

Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 2 Why doing testbeam Calorimetry for ILC: mostly driven by Particle Flow performance to achieve Optimum design addressed by MC simulation  Need to validate the simulation against a realistic detector ! And it allows to discover design/hardware issues in time to solve them. current performance for LDC-like detectors typical LEP-detectors performance see Mark Thomson’s talk today

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 3 Layout Introduction: the ECAL prototype I.the testbeam setups II.Calibration procedure III.Pedestal and noise and crosstalk issues IV.Electron selection for the analyses V.Tracking resolution at ECAL front face Conclusion

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 4 200mm 360mm The Electromagnetic Calorimeter prototype ECAL prototype: 3 modules with variable thickness of Tungsten Active slabs with silicon layers+tungsten interleaved Front end chip and readout on PCB board W layers wrapped in carbon fibre or between 2 PCBs Total tungsten thickness = 24 X 0. PCB+Si layers:8.5 mm 62 mm 6x6 1x1cm 2 Si pads Conductively glued to PCB Active area of 12*18 cm 2 completed for 30 layers Last 1/3rd : expected by July 2007, ~50% already completed Detailed implementation in the Geant4-based simulation for ILC: MOKKA (v06-03) Output data format: LCIO.

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 5 I- Overview of last year TB May DESY TB area, with only 24 layers. 14 days in total ~8 Million triggers, 7 energies (1-6 GeV), 5 angles, 3 positions CERN TB area, with 30 layers. ECAL+AHCAL: 1.7 M triggers, pions beam, 5 energies (30-80 GeV), 3 angles, ECAL alone: 8.6 M triggers, electron beams, 6 energies (10-45 GeV), 4 angles, + 30 Million muons for calibration. Aug 25th Sept 6th CERN TB area. Combined ECAL+AHCAL + TCMT: e+, e-: 3.8 M triggers, 10 energies (6-45 GeV) π+,π-: 22 M triggers, 11 energies (6-80 GeV) + 40 Million muons for calibration. Oct 11th Oct 30th Angle 0 ° (k events) 10 ° (k events) 20 ° (k events) 30 ° (k events) 45 ° (k events) 6 GeV GeV GeV GeV GeV GeV GeV Total

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 6 Testbeam setup in DESY

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 7 Testbeam setup in CERN - August

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 8 Testbeam setup in CERN - October 10 GeV pion event, taken Oct 16th 2006

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 9 Summary of the data taken Size on disk: ~ 40 kB/evt  65M events = 2.5 TB for CERN Physics runs  + 70 M = 3 TB for muon calibration runs August period October period Sept. break μ calib. runs μ calib. All the reconstruction has been done using the GRID !

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 10 II- ECAL calibration Using muon runs taken in October: ~18M events Taken with another experiment upstream  wide spread muon beam Procedure: reject noise with a fixed cut at 25 ADC counts (~0.5MIP) selection of MIP-like tracks : 15 ≤N hits ≤ 40, in a 2 cm tower fit with a Landau convoluted with a Gaussian 6471 calibrated channels Mean : 45.5 ADC counts RMS : 2.2 ADC counts  only 9 dead channels: 1.4‰ !!  6403/6471 : 98.9% convergent fit.  18/6471 needed a special treatment because of high noise.  14/6471 have been calibrated thanks to their neighbours.  One wafer (=36 cells) with a relative calibration : appears to be not fully depleted, 0.517×normal signal !!

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 11 III- Pedestal, noise and crosstalk issues 1- Square events : crosstalk with guard ring

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) Pedestal instabilities Ex: Muon run (ECAL threshold : 0.5 MIP) noise A Good PCB A PCB with unstable pedestals pedestal  NEW !! Understood : fake differential in the chip due to instabilities of the power supply not compensated. Is corrected in the EUDET module (SKIROC chip)

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) Signal induced pedestal shift: wafer scale  Not understood yet  under investigation  Correlated with signal intensity  Affects a few wafers randomly in space and time… 1- Pedestal substracted signal of all pads of one PCB 2- Beam hit the second wafer (chips #2 and #3) Total signal in the chip = 350 MIP 4 MIP shift ~ 200 ADC counts 1 chip = 18 channels 2 chips = 1 wafer Pedestal shift (ADC counts) Correlation between pedestal shift and signal recorded signal (ADC counts) The effect 3- Small signal in same wafer

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 14 Impact on the noise and software correction procedure PCB layer 9 in 6 GeV e- run (DESY) Wafers of the middle row before any corrections = 0.77 ± 0.02 Correlation between 2 channels, per wafer. 0% 50% 80% 100% = 0.66 ± 0.10 = 0.72 ± 0.02 Pedestal instabilities: corrected event by event by iterating on the mean and RMS in wafers without signal = 0.06 ± % 0% 50% 100% = 0.07 ± 0.04 = 0.32 ± *36 channels Signal Induced Pedestal Shift: corrected event by event by iterating on the channels having no signal but in a wafer recording a signal. position of the signal: less cells to perform the calculation=less correlations… = 0.21 ± 0.09 After all corrections in wafer recording a signal: Wafers of the middle row after corrections = 0.42 ± 0.19 = 0.06 ± 0.02 For completeness : a wafer only affected by signal induced shift:  Corrections are doing their job pretty well !!

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 15 Noise after all corrections Mean CERN Extracted from 11 runs at different energies ±3%

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 16 IV- Electron selection Triggering : coincidence of 3 scintillators along the beam line. Signal threshold: 0.6 MIP Selection of single electron events: CERN: Čerenkov counter to remove pion contamination DESY : shower barycentre in the region expected from the beam profile.

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 17 Data/MC comparison High energy tails very well reproduced, also up to 1.5 MIP Low energy disagreement not yet understood, under investigation But little influence on the total energy  present analyses based on the energy. Pion 12 GeV not showering in the ECAL  set the global energy scaling for the MC 30 GeV electrons linear scale

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 18 V- Tracking ECAL front face In view of extracting the ECAL resolution, need to subtract the tracking resolution Tracking: best linear fit with 4 chambers is considered to give the expected position and direction at ECAL front face. Error matrix contains intrinsic chambers resolution and scattering in front of the ECAL. Systematic errors in extrapolation to ECAL front face directly affects ECAL estimates. For 1 GeV Beam Energy - DESY Source of error Position (mm) On Angle (mrad) Simulation statistic0.02 residual misalignment material modelling Intrinsic resolution Background rate total

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 19 Results for the tracking resolution Track resolutions in ECAL front face EbeamPosition (mm)Angle (mrad) 1 GeV1.68 ± ± GeV1.00 ± ± GeV0.81 ± ± GeV0.72 ± ± GeV0.66 ± ± GeV0.60 ± ± 0.05 z beam x,y * σ pos σ angle ECAL front face

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 20 Introduction’s conclusions Testbeams 2006 have been a complete success: discovery of hardware problems: capacitance issues giving raise to so-called “square events”, Importance of compensating power supplies for the stability of pedestal lines, … and more to come ! Crosstalk issue affecting pedestals at wafer scale ?? exercise real life detectors and data handling: e.g. GRID setup, reconstruction software, simulation and digitisation issues. allowed to improve already the detector simulation models. lots of data taken, with a full spectrum in energy, angle, position Really good training for coming testbeam with a completed prototype : summer 2007, starting in 3 weeks. learning from our mistakes : even more efficient shift organisation + faster analyses and feedback expected. Preliminary results on performance presented by C. Carloganu right now !

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 21 Thank you for your attention

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 22 Backup

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 23 Detailed view of ECAL PCB

June 1st, 2007 LCWS Hamburg A.-M. Magnan (IC London) 24 noise after corrections