Biagio Rossi – PhD Student LHEP, University of Bern Biagio Rossi – PhD Student LHEP, University of Bern 1.Analysis of capillary target 2.Report on LN-TPC.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

P HI T S Exercise ( II ) : How to stop , ,  -rays and neutrons? Multi-Purpose Particle and Heavy Ion Transport code System title1 Feb revised.
E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.
I.Kreslo CHIPP workshop on Detector R&D, University of Geneva, June Development of Liquid Nitrogen Time Projection Chambers A. Ereditato,
AGATA Introduction John Simpson Nuclear Physics Group.
Results on Test Cryostats and The AGATA Asym. Triple: Status of Cryostat Production AGATA Detector Group Meeting, IKP Cologne March 16th, 2006.
Tracking with capillaries – Neutron & GRA radiography 1.Fist test with 2 targets is made in December 2.Analysis in progress 3.Test on monochromatic neutron.
Biagio Rossi – PhD Student LHEP, University of Bern Biagio Rossi – PhD Student LHEP, University of Bern 1. Report on stautus of Analysis of capillary target.
Testbeam 2010 with CAPTAN System Jianchun Wang Syracuse University.
October 20th, 2006 A. Mazzacane 1 4 th Concept Software First Results.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
VELO Testbeam 2006 Tracking and Triggering Jianchun (JC) Wang Syracuse University VELO Testbeam and Software Review 09/05/2005 List of tasks 1)L0 trigger.
HFT Geometry Considerations F.Videbæk BNL. Introduction This presentation is meant to be a living document, updated as more and better information becomes.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 CEX beam test at piE1 Satoshi Mihara.
Report of the NTPC Test Experiment in 2007Sep and Others Yohei Nakatsugawa.
Status of DRIFT II Ed Daw representing the DRIFT collaboration: Univ. of Sheffield, Univ. of Edinburgh, Occidental College, Univ. of New Mexico Overview.
TWIST Measuring the Space-Time Structure of Muon Decay Carl Gagliardi Texas A&M University TWIST Collaboration Physics of TWIST Introduction to the Experiment.
LRT2004 Sudbury, December 2004Igor G. Irastorza, CEA Saclay NOSTOS: a spherical TPC to detect low energy neutrinos Igor G. Irastorza CEA/Saclay NOSTOS.
ICARUS General Trigger Design Contributions from: M.Della Pietra, A.Di Cicco, P.Di Meo, G.Fiorillo, P.Parascandolo, R.Santorelli, P.Trattino B.Baboussinov,
LAV Software Status Emanuele Leonardi – Tommaso Spadaro Photon Veto WG meeting – 2015/03/24.
Stanford, Mar 21, 2005P. Colas - Micromegas TPC1 Results from a Micromegas TPC Cosmic Ray Test Berkeley-Orsay-Saclay Progress Report Reminder: the Berkeley-Orsay-
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
CMS Calorimeter HB- HB+ HE- HE+ HF- HF+ HO-2 HO-1 HO0 HO+1 HO+2
To do for the next K0 beam time Department of Physics, Tohoku University H. Kanda.
GLD Intermediate tracker task list Configuration & software Silicon Sensor Electronics Support structure H.J.Kim, Kyungpook U. for intermediate tracker.
Pattern Recognition in OPERA Tracking A.Chukanov, S.Dmitrievsky, Yu.Gornushkin OPERA collaboration meeting, Mizunami, Japan, of January 2009 JINR,
MINERvA Main INjector ExpeRiment for -A is the symbol for the neutrino. The beam that is sent to MINERvA is made out of neutrinos. In chemistry, an A stands.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Argontube Detector design Laffranchi Marco, Meregaglia Anselmo, Messina Marcello, Rubbia Andre’ Bern,
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
1 Simulation Update S. Margetis. 2 Issues Since in August most people were gone the action items are the still the same as listed in Jim’s slide for the.
Experimental Nuclear Physics Some Recent Activities 1.Development of a detector for low-energy neutrons a. Hardware -- A Novel Design Idea b. Measure the.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT.
Results of the NEMO-3 experiment (Summer 2009) Outline   The  decay  The NEMO-3 experiment  Measurement of the backgrounds   and  results.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
NCC simulation update DC meeting Oct 3, 2007 BNL.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
The BoNuS Detector: A Radial Time Projection Chamber for tracking Spectator Protons Howard Fenker, Jefferson Lab This work was partially supported by DOE.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
J. Alozy, S. George, F.Murtas, M. Silari 1 CERN GEMPIX detectors as hadron therapy beam monitors and radioactive waste detectors GEMPIX construction.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Progress Report on GEANT Study of Containerized Detectors R. Ray 7/11/03 What’s New Since Last Time?  More detailed container description in GEANT o Slightly.
Installation of the T600 at Fermilab CSN2, September 22,
1 Giuseppe G. Daquino 26 th January 2005 SoFTware Development for Experiments Group Physics Department, CERN Background radiation studies using Geant4.
Development of FLINT experiment Konstantin Mikhailov for FLINT collaboration ITEP 24 November 2011 The Session-conference of Nuclear Physics Division of.
Development of a Single Ion Detector for Radiation Track Structure Studies F. Vasi, M. Casiraghi, R. Schulte, V. Bashkirov.
Test Beam Meeting Monday, January 31, 2000 Fpix1 Calibration Status 1.What we have 2.What to do Monitor Software to use now 1.Current Version 2.Calibration.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Tracking software of the BESIII drift chamber Linghui WU For the BESIII MDC software group.
Scintillating Fiber Profile Monitor The M-Test Experience Gianni Tassotto 112/15/2014.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Durham, Sep 3, 2004P. Colas - Micromegas TPC1 Micromegas TPC Berkeley-Orsay-Saclay Progress Report Reminder: the Berkeley-Orsay- Saclay cosmic setupReminder:
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Installation of the T600 at Fermilab
Albert Einstein Center for Fundamental Physics
Beam
new straw end plug: D=10.6 mm straws support frame Levan option
Dubna/JINR Status & Plans
Status of measurements with the Napoli TPC
The interaction region for FIRST (status report)
Corners Why are they important?.
Development of Liquid Nitrogen Time Projection Chamber
Variable distance from beam.
Picture 1 10 protons 10 neutrons = an electron.
LHC BIF test setup - update
Presentation transcript:

Biagio Rossi – PhD Student LHEP, University of Bern Biagio Rossi – PhD Student LHEP, University of Bern 1.Analysis of capillary target 2.Report on LN-TPC design hardware and schedule of next activities 1.Analysis of capillary target 2.Report on LN-TPC design hardware and schedule of next activities LHEP-CRYO Meeting, Bern, 9 January 2007

Biagio Rossi - LHEP-CRYO Meeting - Bern University - 9th Jan Analysis of capillary target People involved: A. Ereditato - I. Kreslo - B. Rossi – H. U. Schutz and SOREQ

Biagio Rossi - LHEP-CRYO Meeting - Bern University - 9th Jan November 06: AGREEMENT between SOREQ-LHEP December 06: Preliminary tests of capillaries, using gamma and neutron sources. A picture of the detector during some tests with radioactive sources Pattern recognition of Capillary bundles Genaury 07: Developing SW for analysis. Febraury 07: Preliminary Analysis. March 07: Test beam in Germany Detector geometry: Shape: Cilindrical (5  m radius glass capillaries embedded) Radius: 0.7 cm - Lenght: 10 cm

Biagio Rossi - LHEP-CRYO Meeting - Bern University - 9th Jan Display of events ITEMS: 1.Pedestal background subtraction for every pixel 2.Active surface determination ( with a very near Cs  -ray source ) 3.Automatic Recostruction (by SW) of the “active surface” 4.Data analysis BACKGROUND SOURCES: 1.Isolated electrons extracted inside “Image Intensifier” (expecially for electrons) 2.Isolated Ions extracted inside “Image Intensifier” (expecially for protons) PRELIMINARY “BLIND ANALYSIS” ON NEUTRON EVENTS 1.Proton tracks are more easy to characterize respect to electrons 2.Direction of the TRACKs Event with a Pu source (neutron source)

Biagio Rossi - LHEP-CRYO Meeting - Bern University - 9th Jan What’s the idea 1.Energy distribution of all the point of the matrix without cut 2.Put High_thresohld = + 3  and Low_thresohld = + 1  3.Search for HIT ( points of matrix A(i,j) > high_threshold ) 4.Search for CLUSTER ( two or more “NEAR” HITs ) – i.e. A(3,3) is an HIT -> check if in the CELL (3x3 matrix centered in the point A(3,3) ) there are other HITs. If NOT do the Sum of the values of the CELL that are greater than low_threshold. If YES starts the recoursive analysis, searching for other HITs in the CELL centered in the LAST found HIT and so on until it doesen’t find an HIT in the neighborhood CELLs. When the recoursive serching stops, do the Sum of the values of all the pixels in all the CELLs that are greater than low_threshold.

Biagio Rossi - LHEP-CRYO Meeting - Bern University - 9th Jan Software code int XMIN, XMAX, YMIN, YMAX; //---- Limits of the matrix of data int Sum = 0; int c = 0; loop YMIN,YMAX (index i) //---- loop COL of A(i,j) – Matrix of data loop XMIN, XMAX (index j) //---- loop on ROW of A(i,j) – Matrix of data if ( A( i,j ) > high_threshold && B( i, j == 0 ); B( i,j ) == 0; Sum = 0; c = 0; Clustering_Func(&A, &B, i, j, &Sum, &c); Energy_distribution->Fill(Sum); if ( c == 0 ) …… …. RECOURSIVE FUNCTION void Clustering_Func(int*A[i,j],int* B[m,n],int i,int j,int* Sum,int* c) loop i-1, i+1 ( index k ) loop j-1, j+1 ( index l ) if ( k = XMAX || j = YMAX) if( !B(k,l) ) if( A(k,l) > low_threshold ) Sum = Sum + A(k,l); B(k,l) = 1; C(k,l) = A(k,l); if( A(k,l) > high_threshold ) c = 1; Clustering_Func(&A, &B, k, l, &Sum, &c) endif end loop ( index l ) end loop ( index k )

Biagio Rossi - LHEP-CRYO Meeting - Bern University - 9th Jan Report on LN-TPC design hardware and schedule of next activities People involved: A. Ereditato - M. Hess - S. Janos – I. Kreslo - M. Messina - U. Moser - B. Rossi – H. U. Schutz

Biagio Rossi - LHEP-CRYO Meeting - Bern University - 9th Jan Dewar 2.TPC 3.New wire plane (10 wires - wire’s diameter 125  m – wire’s pitch 2mm) 4.“BIG Flange” 5.“Feedthrough Flanges” 6.Vacuum pumps (Rotative and Turbo) 7.HV supply and signal feedthrough 8.Analogic Front End board (4 amplifier = we can read 4 wires contemporary ) Status of activities LN-TPC

Biagio Rossi - LHEP-CRYO Meeting - Bern University - 9th Jan HV feedthrough - end of JAN ? 2.“Feedthrough flange holes” and “knit feedthrough flange” – end of JAN ? 3.Design and Build the support for the radioactive source – design for half of FEB 4.Cleaning and Assembly TPC – a week before the first vacuum test 5.Build support for TPC – a week before the first vacuum test 6.Dewar for Filter – To buy or we have it ? 7.Levelmeter ( PT100 ? ) – ? ? ? 8.OXYSORB filter – see Marcello Messina talk 9.Proposal scheme for Direct Filtering – see next slide Schedule of next activities

Biagio Rossi - LHEP-CRYO Meeting - Bern University - 9th Jan Oxysorb Vacuum pump TPC dewar LN tank Pure LN tank Proposal scheme for Direct Filtering