August 8, 2007 Flange Options for the Antineutrino Detectors Kirk McDonald Princeton University (August 8, 2007)

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Mast Storage Rack NNSY Sean Ellis, Philip Crist, Max Carpenter, Gershom Obeng.
Heavy Concrete Construction Formwork
WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
C T A Camera Development Rich Northrop Laboratory for Astrophysics & Space Research University of Chicago Consortium Meeting Chicago May 28 – June
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Hoop Tech Clamp Assembly and Attachment. Contents of package.
Slide HALLD TAGGER MAGNET STRUCTURAL ANALYSIS Presented by William Crahen 6/10/09 Pole Plate analysis Vacuum chamber analysis Vacuum chamber tie rods and.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
A simple clamping device for the Solid absorber Wing Lau, Oxford.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
MICE modules interface proposal FAC module Phone meeting Edgar Black IIT 2/13/2004.
K.T. McDonald March 11, 2008 Comments on PMT Mounts Kirk T. McDonald Princeton University.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Multi Flasher By Joshua.
Petroleum Engineering 406 Floating Drilling
Flange facings Contact surfaces to seat the sealing gasket material.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
Design of a Robotic Manipulator for a Wheelchair Gateway Coalition Ohio State University Sinclair Community College Wright State University December.
PAL PLUNGERS® BY PAL PLUNGERS, LLC.
 2005 Pearson Education South Asia Pte Ltd TUTORIAL-1 : UNIAXIAL LOAD 1 PROBLEM-1 1 m P A composite A-36 steel bar shown in the figure has 2 segments,
Structural option for the Jinping neutrino central detector Contributor : Yuanqing Wang, Zongyi Wang Speaker : Zongyi Wang Department of civil engineering,
Sag of ZTF components Callahan 9/4/2014. Corrector Trim Plate analysis.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Magnets and Supports Bob Wands October 20, 2006 PPD/MD/Engineering Analysis Group Fermilab 4 th Concept Detector at Fermilab October, 2006.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
Cold Magnetic Shield Update
Mechanical Designs of The Central Detector Jinyu Fu
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
NEDM Collaboration Meeting, May 19, 2008 Valve Progress Steve Williamson.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
1 Proposal of the mechanical support on the Buffer for the 10“ PMTs by Enrique Calvo Alamillo.
A View of NCSX Structural System and Load Path for the Base Support Structure.
G-10 CPA March 2016 Bill Sands. Design Criteria Structure must support the CPA panels and Field Cage Differential contractions must be identified and.
4.4 Size of a Horizontal Boring Machine:  Conventionally, the size of a horizontal boring machine is specified by the spindle diameter in mm.  The spindle.
1 VV Support Fixture FPA Stage 1 PDR Review August 10, 2005 T. Brown.
USB in the USA Tyler Joseph Reimer, Sang Jun Han, Lukas Shaw Smugar, Alexa Marguerite Trautz.
EXTRUSION BASIC CONCEPTS
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Assembly of steering.
Fixture.
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
LBNF CAD models, Drawings and Component list
By: Shawn Berkeybile, Dave Martin, Zach Palamara, John Sopczynski
Baseline Design for Braidwood
INSTALLATION SEQUENCE
SDHCAL Integration Moi j’aime bien SAFARI
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
Mounting a BalanceBox®650 to a brick wall
Applied Dynamics - Assignment
Welcome! Drafting 2323: Pipe Drafting
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Valve stem “gag” mechanism
Propeller Test Apparatus
SNS PPU Cryomodule Space Frame
Copyright ©2014 Pearson Education, All Rights Reserved
Flexible System Hardware
SNS PPU Cryomodule Space Frame
Presentation transcript:

August 8, 2007 Flange Options for the Antineutrino Detectors Kirk McDonald Princeton University (August 8, 2007)

August 8, 2007 Problem: Flanges Restrict Space for PMT Ladder Insertion

August 8, 2007 Solution: Flanges with Minimal Horizontal Extent Use horizontal bolts to secure lid to vertical wall of vessel. If the O-ring needs compression during assembly, use clamping brackets (one per bolt) that engage a slot in the vessel wall such as to force the lid down as the bolts are tightened. This concept could be applied to both the SS vessel and the outer acrylic vessel. Stress concentrations in the wall and lid around the flange bolts should be evaluated.

August 8, 2007 Will the O-Ring Be Compressed by the Weight of the Lid? A 0.25”-diameter O-ring of 50 hardness requires 20 lb/in to be compressed by 20%.  Need 12,600 lb to compress a 5-m-diameter O-ring (10,000 lb for 4-m-diameter).  Since neither the SS lid nor the acrylic vessel lid weigh this much, the O-rings will need to be compressed by the clamping brackets during assembly. From Parker O-ring handbook:

August 8, 2007 Even Better to Bond the Lid of the Outer Acrylic Vessel Even more space for the PMT ladders would be obtained if the lid of the outer acrylic vessel were bonded rather than bolted. The bonding would be done by the vessel manufacturer. The flexible Teflon tubes that extend upwards from the inner and outer acrylic vessels can/should also be attached to the acrylic lids by bonded flanges -- to simplify assembly and to reduce the risk associated with blind, tapped holes in the acrylic lids.