Kranjska Gora, 19.-20.04.2004 1 Test plan - PI will test F-MAN tools on: - 2 types of wagons (Uacs, Himrrs) - 2 types of operation (timetable supervision.

Slides:



Advertisements
Similar presentations
Understanding Basic Components:
Advertisements

System Developed By Srijan Software Services, Dehradun Are you associated with Multiple Companies ? Are you facing problems ? Service industry is the largest.
D11.2 – The Story Each test operator will test the system in different corridors in Europe. CP use one corridor, PI use another corridor, SIGMA has got.
17th February, 2000 by Maciej Korzeniowski (CERN-IT-IA-MI) 1 Oracle Discoverer Product Presentation  This is an ad hoc query and analysis tool for.
© 2008 OSIsoft, Inc. | Company Confidential Event Frames Initiative Update Chris Nelson Chris Coen Chris Nelson Chris Coen.
Stock Management System  I.T. Systems Solutii Profesionale S.R.L. This will present the key features of the Stock Managemen System (SMS) developed by.
UGDIE PROJECT MEETING Athens September WP6 – Assessment and Evaluation  Evaluation Results  Deliverable D 13 (first release issued and delivered.
Paris, June Wagon management information flow on Slovenian Railways wagon ordering wagon maintenance.
WP3- Development: Milestone M3 Lisbon 30 January 2004 National Technical University of Athens.
Evaluation is a professional and ethical responsibility and is a core part of PHN professional practice Commitment to evaluation helps build the PHN intelligence.
1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH
Figure 6-1: Transport Request Data Entities: CS: Customer OM: Order manager OPM: Operational manager FM: Fleet Manager MM: Maintenance manager OBT: On.
Face Recognition Data Search Tool COMP6703 PRESENTATION Presented by Yan Gao u Supervisor: Professor Tom Gedeon.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
Kranjska Gora, Installation – plan, delivery -PI installation on Slovenian Railways’ wagons: -3 Uacs -2 Himrrs -Delivery of OBTs and loading.
WP5 - Estimated Time of Arrival: verification of the F-Man approach and identification of effects on fleet management Athens -Greece Sept 2004 National.
Crete Meeting April 10 th – 11 st, 2003 WP3 Sciro Presentation.
Florida’s Water Management District Permitting Website – Phase II (Permitting Portal II)
UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
ΑΝΝΕΧ 3 by SCIRO. Task 2.1 – Functional requirements definition Task 2.1 aims at drawing the functional analysis of F-MAN, starting from the users’ needs.
1 SCIRO - Bled /09/02 WP2 Functional Requirements and Architecture External Functional Analysis (D4) & Internal Functional Analysis (contribution.
Final (Part A) Presentation 31/10/04 Virtual Traffic Signal Presented by: Ron Herman Ofir Shentzer Instructor: Mr. Mony Orbach Technion – Israel Institute.
Octopus F-MAN FM OPM OM Standards and Norms Environment MM Wagons F2 F1 F3 Contractual data Wagons owner F4 F5 F6 F9 F7 F8 F10 F11 F12.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Learning Objectives LO1 Outline six general audit techniques for gathering evidence. LO2 Identify the procedures and sources of information auditors can.
Employment and Training Administration DEPARTMENT OF LABOR ETA Reporting and Data Validation Updates Presenters: Wes Day Barbara Strother Greg Wilson ETA’s.
Configuration Management Avoiding Costly Confusion mostly stolen from Chapter 27 of Pressman.
Network security policy: best practices
CCFF Program Operations Functional Review October 22, 2002 The following document is posted by the Low Income Investment Fund (LIIF) in accordance with.
Complaint Management System
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Monthly APCD User Workgroup Webinar May 27 th, 2014.
Presentation by SNCF in 19/20 April 2004 Meeting in Kranjska.
Chapter 7: Database Systems Succeeding with Technology: Second Edition.
DOCUMENTATION Research Data Management. Research Data Management Lab Books Why keep a Lab Book? Records are important for development and writing up of.
9/19/2012ISC329 Isabelle Bichindaritz1 Conceptual Data Modeling.
Work Flow Control and Documentation Name: J. Douglas Wells Sponsor: Molded Plastic Ventures (MPV)
California State University, Northridge Certification Process Team B Carlos Guzman John Kramer Stacey LaMotte University of Phoenix.
Trackstar Navigations Pvt. Ltd. Presenting New Generation GPS Tracking System.
South Western School District Differentiated Supervision Plan DRAFT 2010.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Computing Fundamentals
Dakota State University.
The Role of Teaching Assistants. Session outline The Workshop includes four elements: (1)Roles and Responsibilities of Staff (2)Establishing a Professional.
Chapter 5 Technology in the Business Office Copyright © 2011, 2006 Mosby, Inc., an affiliate of Elsevier. All rights reserved.
G045 Lecture 08 DFD Level 1 Diagrams (Data Flow Diagrams Level 1)
INTRODUCTION TO DBS Database: a collection of data describing the activities of one or more related organizations DBMS: software designed to assist in.
Crash Record System Connecticut Version JB Technology Inc.
CIRSCALC - CT BONE DENSITOMETRY. Agenda  What is CIRSCALC project?  Tools Used.  Code Description Database Connectivity Crystal Reports Graph  Demo.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
CALIFORNIA DEPARTMENT OF EDUCATION Tom Torlakson, State Superintendent of Public Instruction Special Education Self Review (SESR) Activity Three: Corrective.
Data Coordinators Conference – 2014 Laura Marroquin CASEWORKER/JCMS Specialist Everything New Data Coordinators Should Know.
F-MAN Kranjska Gora, 19th - 20th April RIV CHANGES Most probably that with 1st of January 2005 the “old” RIV expires.
NOTE: To change the image on this slide, select the picture and delete it. Then click the Pictures icon in the placeholder to insert your own image. DATABASE.
Introducing ReportCard2.0 ReportCard2.0 Introductory Training.
National Workshop on ANSN Capacity Building IT modules OAP, Thailand 25 th – 27 th June 2013 KUNJEER Sameer B Pool of experts database and further enhancements.
Lisbon, Report on OBT installations -50 OBTs and sensors to be installed on wagons: - 35 CP (sggmrss – flat wagon with 102 ton cargo capacity)
Contractual Relationship Requirements for End Users Implementation Update: Policy Proposal
Learners Support Publications www. lsp4you.com Database Users and Administrator.
The information systems lifecycle Far more boring than you ever dreamed possible!
POS 409 MART Learning for leading/pos409martdotcom.
RAILDATA Centralbahnstr. 6, CH – 4051 Basel Wagon and Consignment Tracking Petr Červinka, CDC.
Microsoft Customer 2 Partner Connector Quick Reference Guide
ΑΝΝΕΧ 10 by EK. Rail Operators‘ Group (1) 1.Background F-Man Cargo operators: FS, CP, SZ. Their responsibilities: - to define their needs for a F-Man.
For More Best A+ Tutorials HCR 240 Entire Course (UOP) HCR 240 Assignment  HCR 240 Assignment: Payments and Statements  HCR 240.
BSA 385 Week 3 Individual Assignment Frequent Shopper Program Part 2 Check this A+ tutorial guideline at
Design Process.
HCIS 255 Innovative Education- -snaptutorial.com
Presentation transcript:

Kranjska Gora, Test plan - PI will test F-MAN tools on: - 2 types of wagons (Uacs, Himrrs) - 2 types of operation (timetable supervision – 3 Uacs, status supervision – 2 Himrrs) - Activities: - Control of timetable supervision mode on corridor Koper tovorna – Treibach-Althofen including ETA (check ISUP, Hermes) - Control of wagon status data (check ISUP, Hermes, phone calls) - Calculation of exploitation indicators for freight wagons (check F-MAN database extraction; result: XLS tables post processing) - Report tables (check F-MAN DB extractions; result: XLS tables on wagon history, timetable and ETA performance) - Software presentations and survey on users’ attitude about F-MAN tools, interface,...

Kranjska Gora, Timetable supervision procedure -PI operator will be assisted by ISUP (SZ IS for traffic management) and Hermes (internationally based IS for wagon management) -Procedure: 1.PI operator “piom” will check the information in the ISUP and Hermes. 2.Upon the information “piom” will place an order to AMM. 3.PI operator “pifm” will assign the wagons to the order complying with the AMM procedure 4.Upon the information of the movement (AMM and DPM) and information form ISUP and Hermes “piopm” will assign the appropriate timetable to the wagon and send it to OBT 5.“piopm” will sporadically check the information in the F-MAN system to the ISUP and Hermes IS. 6.“piopm” will note his observations and react to the alerts 7.AMM and DPM administrators need to provide F-MAN DB extractions on periodically basis (2 weeks)

Kranjska Gora, ISUP – wagons’ application - start

Kranjska Gora, ISUP – wagon history / 1month

Kranjska Gora, ISUP – wagon record –Details on wagon history record

Kranjska Gora, Hermes

Kranjska Gora, Hermes – query result for wagon

Kranjska Gora, Control of wagon status –Status will be controlled for all five wagons: –check of wagon position and status –comparison of data with ISUP and Hermes and phone calls –response to alerts raised by F-MAN tools –entering special states (maintenance, damage,...) –report on functionality of the tool (suggestion of enhancements) –recording of special observations

Kranjska Gora, Exploitation indicators –Proposed exploitation indicators are evident in W5PI_TN_7023: –speed indicators –inequality analysis –productivity in terms of time –productivity in terms of distance (proposed: cost – related to distance) –Exploitation indicators analysis is based on the F-MAN database –Exploitation indicators have been limited according to the availability of the data from AMM and DPM – DB extractions (reports) –DB data will be processed reported in XLS worksheet

Kranjska Gora, Report tables –Report tables are based on F-MAN DB extractions –Document W5PI_TN_7023 lists the required data to make a report –Two types of reports: – wagon based (all wagons: list of wagon positions and wagon states) –corridor based (3 wagons on corridor: control of timetable and ETA) –Reports contain description of observations and problems

Kranjska Gora, Wagon status table

Kranjska Gora, Timetable and ETA supervision table

Kranjska Gora, Users’ feedback –Functionality and operation of F-MAN system will be presented to Slovenian Railways operation and management staff –FM of Slovenian Railways will use the system as backup support –Survey of the attitude of the users - report