DRAFT HCAL digital optic link and trigger mapping DRAFT.

Slides:



Advertisements
Similar presentations
1 Calorimeter Trigger to L1-Board data transmission Umberto Marconi INFN Bologna.
Advertisements

C. Fernández Bedoya, A. Navarro, I. Redondo. C. Fernández Bedoya November 29th, Goal: Replace SC crate with simple CuOF electronics and place TSC.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
W.Van Doninck 4/2/05 YE-1 Rack layout (9/12/04). W.Van Doninck 4/2/05 YE-1 Rack layout (9/12/04)
Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HCAL Status CMS HCAL Status Jim Freeman.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
Andris Skuja: US CMS Annual DOE/NSF Review, May 19, CMS HCAL Report US CMS HADRON CALORIMETER REPORT Andris Skuja University of Maryland US CMS Annual.
1 Cost Estimate (and configuration) Drew Baden Univ. Of Maryland July 2001.
HCAL RBX for HB, HE, and HO Status and Planning R. Ruchti Department of Physics University of Notre Dame Notre Dame, IN USA.
Ionization Profile Monitor Project Current Status of IPM Buffer Board Project 10 February 2006 Rick Kwarciany.
4-APR-06 CMS SLHC Perugia - Baden 1 Forward Jet Triggering for an Upgraded CMS Drew Baden - University of Maryland Jeremy Mans - University of Minnesota.
Drew Baden, UMD Nov HCAL Trigger/Readout CMS/Tridas November 2000 Drew Baden, Tullio Grassi University of Maryland.
USC 55 Layout w/Rack Wizard View from the front of the racks, crate arrangement is necessary for sharing of e/  data on cables. To GCT Spare Rack.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
CMS/HCAL/TriDas. Dec, 2003 HCAL TriDAS 1 Tridas Status Drew Baden University of Maryland December 2003 What’s new since September 2003…
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
Marc Baarmand Total of 8 Calibration Boxes (CBOX) for HF  CBOX contains Small blue scintillator (UV → blue) 1×9 Splitter (each CBOX serves 9 PMT RO Boxes)
Ch.9 Sequences and Series
MTCC –II & HCAL noise chasing Mandakini Patil India-CMS meeting Jan07 Shantiniketan.
Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 16 September 2003 Optical link in Calorimeter DAQ: Link FEE(CROC)
CALOR2006 June 7, Julie Whitmore Fermilab Overview of the CMS Hadron Calorimeter.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
Kavita Lalwani, Pooja Saxena, Kirti Ranjan, Ashutosh Bhardwaj Department of Physics & Astrophysics University of Delhi Manoj Sharan High Energy Nuclear.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
RM->HTR cabling organization pawel de barbaro, apr , Agreed on april-20, 2006.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
INTRODUCTION HIGHLIGHTS FLOOR PLAN SITE PLAN.
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
Status & Plans for Backend Program  Backend Architecture  Current Status  Schedule for HF Backend  Schedule for HB/HE Backend  Summary & Plans November.
Possible SLHC Modifications to Clock Distribution Chris Tully, Dan Marlow Princeton Madison, Wisconsin February 13, 2003 Current SLB Clock Distribution.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
Feb 2002 HTR Status CMS HCal meeting at FIT Feb. 7-9, 2002 Tullio Grassi University of Maryland.
25 Sept 2001Tullio Grassi From MAPLD2001 ( space community conference ) Major causes of failures.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
CMS HCAL optical links Eric Hazen (BU), Tullio Grassi (UMD) OptoWG - 28 Sept 2011.
HCAL upgrade FPGA FW: tasks and issues 12 May2016 Tullio Grassi, Univ. of Maryland.
HF “Slice test box” installation
HCAL Back End Report Manoj Sharan, For BackEnd Group June 24, 2014.
HCAL DAQ Path Upgrades Current DCC Status New DCC Hardware Software
Update on ‘Real estate’ for Level-0
HF “Slice test box” fabrication and installation
ROBOX modification plans
288 channel HE RBX? A conceptual exercise, NOT a proposal
HF Test station at P5 A.Mestvirishvili.
Hire Toyota Innova in Delhi for Outstation Tour
Geneve The Alps Where is CERN? Jura Mountains Lake Geneva 18-Sep-18
SCT/Pixel Draft Rack Layout rcj
Regional Cal. Trigger Milestone: Major Production Complete
HCAL Configuration Issues
Synchronization Policy: HCAL will follow ECAL as much as possible
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
USCMS HCAL FERU: Front End Readout Unit
RM 2 7 +RM 2 4 RM 7 3 +RM 1 6 RM 5 2 +RM 2 4 RM 1 3 +RM5 2.
The LHCb L0 Calorimeter Trigger
I have… I have… Who has 3:40? Who has 12:20? I have… I have…
HCAL DAQ Interface Eric Hazen Jim Rohlf Shouxiang Wu Boston University
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Prepared for CSC by Fred Borcherding FNAL
Presentation transcript:

DRAFT HCAL digital optic link and trigger mapping DRAFT

HCAL HTR crates mapping to RTC crates

DRAFT Layout of HCAL HTR racks in row F on the second floor of USC55

DRAFT HB/HE to RTC’s

DRAFT

Tower Mapping for HE RM2, 3 QIE Ch.# HE Tower Card1 Card2 Card f 19r m 20f 2 25f 29m 21r 3 25r 23f 21f 4 18f 27r 19f 518r 23r 20r f – front section; m – middle section; r – rear section Tower Mapping for HB QIE Ch.# HB Tower Card1 Card2 Card3 0 16r r f f Tower Mapping for HE RM1, 4 QIE Ch.# HE Tower Card1 Card2 Card f 19r m 20f 2 26f 29f 22r 3 26r 24f 22f 4 18f 28r 19f 5 18r 24r 20r

DRAFT HF sectors to RTC’s

DRAFT

HF HTR crates