GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.

Slides:



Advertisements
Similar presentations
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 5 of 12 Subsystem Acceptance 1 GLAST Large Area Telescope Pre-Environmental.
Advertisements

GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
SVACInstrument Analysis Meeting, August 5, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT Project LAT System Engineering 1 NCR Status Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project18 July GLAST Large Area Telescope: NCR 529 Systems Engineering R. Bright Gamma-ray Large Area Space Telescope.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
SVACInstrument Analysis Meeting, October 21, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST Large Area Telescope:
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project Technical/Cost/Schedule Review 04/26/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 1 GLAST Large Area Telescope: TKR.
GLAST LAT ProjectI&T Test Planning Telecon, 8 Nov 2004 CAL Test and Calibration DefinitionJ. Eric Grove GLAST LAT GLAST LAT Calorimeter Subsystem Gamma-ray.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
GLAST LAT Project5 April 2006 LAT System EngineeringLAT Verification Process GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
GLAST Large Area Telescope:
Mechanical Integration
Single-CAL Test and Calibration
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
Overview Goal Study GEM variables in SVAC ntuple
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
LAT Environmental Test Planning and Design Review
Overview Cost to Complete
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope LAT Test Planning Meeting Performance and Ops Test Plan Update Alternate Integration Plans Pat Hascall SLAC (650)

GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting 2 Performance and Operations Test Plan Updates  Incorporate LAT-CR to eliminate the clock margin test.  Update Cal and Tracker test definitions –Calorimeter test definitions – simplification of the descriptions and discussion of parallelized scripts. –Updated Tracker test definitions to discuss parallelized scripts.  Incorporate LAT-CR to define the ACD receiving test.  Incorporated LAT-CR This CR updated Figure 5-1 to allow tower integration directly onto the grid. This update includes further changes to Section 7 and Figure 5-1 to allow either tower integration directly into the grid or tower integration starting in the test bay.

GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting 3 Change details  LAT-CR was written to allow integration of the towers directly onto the grid.  The update to the Performance and Ops Test Plan allows both testing in the single bay and integration directly onto the grid. –Figure 5-1 updated to show the flow assuming integration in the test bay, with a note to indicate that the single bay testing is optional –Section 7 was updated with a definition of the baseline sequence and some allowable variations –The test matrix (Table 7-1) was updated to collapse the definition of a CPT into one set of columns, rather than three sets (test bay, single tower in grid, multiple towers in grid)

GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting 4 Figure 5-1 update

GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting 5 Sequence Options  The baseline tower integration sequence is: –Integrate the tower into the test bay, perform a CPT (first 2 towers) or a LPT. Perform trigger timing tests. –Integrate the tower into the grid, perform a CPT (first 2 towers) or a LPT on the newly integrated tower. Note that typically two towers at a time are integrated. –Perform a CPT (at 2,4,8 and 16 towers) or LPT with all the integrated towers. –Perform the SVAC calibration and muon runs with all the integrated towers.  Variations to the baseline sequence are: –The tower may be integrated directly into the grid. In this case, the trigger tests will be performed in the grid. The test bay LPT/CPT will be replaced by the LPT/CPT in the grid. –More than two towers may be integrated at a time. In this case, a LPT or CPT will be performed as each tower is integrated. –Note that two tracker tests (TE702 and TE704) are Tracker level tests that could not be performed earlier due to test set limitations. These two tests should be performed as early as practical.

GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting 6 Existing Test Sequence Summary  The existing test sequence to be performed with 16 towers is: –TEM register tests –LAT CPT for Calorimeter and Tracker –TE702 and 704 to complete Tracker subsystem testing –Time in the new towers –Calibration runs (CalibDac, CalibGen, MuTrig, TE601, 602 and 604) –SVAC runs

GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting 7 Proposed Test Sequence Discussion  The proposed modifications to the planned tests are: –Skip the register tests as they will have been performed during the installation of the last 8 towers –Run LAT CPT for Cal and Tracker About a day of testing Gives good confirmation that the towers are operating properly Given that the single bay LPTs were performed as part of the installation process, could we skip this test here and do it after the ACD is installed? –Run Tracker tests TE702 and 704 (necessary to complete testing of the trackers, less than one shift) –Time in the 8 new towers (Time duration needs to be worked – what can be done in parallel?) –Defer the calibration runs until the ACD is installed –Defer the SVAC runs until the ACD is installed Perform a short TBD Muon run to demonstrate that the 16 towers are working together (calibration for this muon run is TBD, since the Calorimeter or Tracker would not have been calibrated with the flight TEM/TPS)