THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.

Slides:



Advertisements
Similar presentations
How Will it Help Me Do My Job?
Advertisements

PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Roles and Responsibilities. Collaborative Efforts to Improve Student Achievement Guidelines for developing integrated planning and decision making processes.
Contract CloseOut.
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
Subchapter M-Indian Self- Determination and Education Assistance Act Program Part 273-Education Contracts under Johnson-OMalley Act.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Contractor Safety Management
CTC-470 Construction Administration Project Management Concepts.
Independent Contractor Management Program Guide
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
PROJECT DELIVERY SYSTEMS
Regulatory Body MODIFIED Day 8 – Lecture 3.
Purpose of the Standards
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Development plan and quality plan for your Project
ZHRC/HTI Financial Management Training
Project Human Resource Management
BUSINESS OPERATIONS Business Management. Today’s Objectives  Identify workplace safety & security measures.  Analyze components included in policies.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
Guidance for AONB Partnership Members Welsh Member Training January 26/
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Construction Contracts and Project Delivery Methods
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
TOPIC-9- PROJECT ORGANIZATION
Roles and Responsibilities
Construction Why Construction The Construction Which are closely related to swimmingly project completion Which Mean: every thing related to Project participants.
1 Kingsley Karunaratne, Department of Accounting, University of Sri Jayewardenepura, Colombo - Sri Lanka Practice Management.
Project Life Cycle.
Practice Management Quality Control
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Agency Construction Management :CM NOT AT-RISK
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
TOPIC-9- PROJECT ORGANIZATION
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
BUSINESS OPERATIONS Business Management. Today’s Objectives  Identify workplace safety & security measures.  Analyze components included in policies.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
The Contract Management Process Post Award Activities.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
BUSINESS OPERATIONS Business Management. Today in Business Management  Let’s begin by putting your phones away.  Find the 3 Note Packets for Financial.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Job Titles Examples Used for HISD Nonexempt Jobs
Profession Practices (ECIV-5105)
PROJECT DELIVERY METHODS
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
PROJECT MANAGEMENT 2 Chu Eu Ho
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
ENGINEERING MANAGEMENT (GE 404)
ENGINEERING MANAGEMENT (GE 404)
PROJECT DELIVERY METHODS
Roles and Responsibilities
Chapter # 4 Development and Quality Plans
Roles and Responsibilities
Project Management Method and PMI ® PMBOK ® Roles
Presentation transcript:

THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN TEAM THE CONTRACTING TEAM

TYPICAL REQUIREMENTS OF OWNER Adequate function and appearance of the new facility. Project completion on time and within the budget. Desirable balance of life-cycle and initial capital costs. Operability and maintainability Addressing of environmental, health, permitting, safety, user impacts, and sustainable development considerations. A fair and reasonable process for resolving disputes.

TYPICAL RESPONSIBILITIES OF OWNER Fulfillment of contractual obligations to other team members, including furnishing site and related information, and timely payment. Compliance with applicable laws, regulations, codes, standards, and practices. Provision of adequate finding. Provision of necessary real estate or right(s) of way. Provision of project goals and objectives. Fulfillment of insurance and legal requirements. Assume an appropriate role in site safety. Acceptance of completed facility.

TYPICAL REQUIREMENTS OF DESIGNER An adequate project scope definition. An adequate budget. A reasonable schedule. Timely decisions from the owner. Realistic and fair sharing of project risk. Adequate communication with the owner regarding performance. A fair and reasonable process for resolving disputes. Timely payment and a reasonable profit.

TYPICAL RESPONSIBILITIES OF DESIGNER Fulfillment of contractual obligations to other team members. Compliance with applicable laws, regulations, codes, standards, and practices. Fulfillment of professional standards. Development and drafting of well-defined contract documents. Responsiveness to project schedule, budget, and program. Provision of construction-phase design services.

TYPICAL REQUIREMENTS OF CONTRACTORS* A well-defined set of contract documents. A reasonable schedule. Timely decisions from the owner and design professional. Realistic and fair sharing of project risks. Adequate communication with the owner regarding performance. A fair and reasonable process for resolving disputes. Timely payment and a reasonable profit. * Includes subcontractors and suppliers

TYPICAL RESPONSIBILITIES OF CONTRACTORS Fulfillment of contractual obligations to other team members. Compliance with applicable laws, regulations, codes, standards, and practices. Interpretation of plans and specifications. Construction of facility as described in contract documents. Management of construction site activities and safety. Management, quality control, and payment of subcontractors and vendors.

Design Influence on Project Characteristics

TRADITIONAL TEAM ORGANIZATION AND OWNERS Under traditional DBB (Design-bid-build) contracting, the owner heads the team with a designated project manager. The owner establishes reporting authority with the designer and contractor by entering into separate contracts with each. The designer and contractor do not enter into contracts with each other, though they do communicate and should work cooperatively to achieve their requirements.

Traditional Construction Project Organization Chart OWNER Project Manager  In house staff  Specialty Consultants DESIGNER Design Team Leader  Design disciplines  Design Sub consultants CONTRACTOR Construction Manager or Superintendent  Subcontractors  Suppliers/vendors  Fabricators  Construction Trade Workers Lines of Authority (Defined by contract) Lines of Communication

THE OWNER’S TEAM The owner often assembles a group of expert advisers that may consist of in-house staff and/or independent consultants to provide the level of expertise and effort needed to complete the project successfully. The basic function of the owner’s team is to initiate and generally guide the project through the planning, design, and construction processes. Members of this team report to the owner but consult regularly with the project manager, designer, and contractor. The owner may delegate authority to a representative to act on his or her behalf.

Core Activities of the Owner’s Team Identifying and articulating the basic need for the project Assisting in establishing project objectives Securing funding Addressing zoning considerations and acquiring property and applicable permits Selecting the designer and contractor, and facilitating their payments Establishing material, equipment, and operational standards Making design and construction decisions Integrating the project with existing facilities Monitoring and managing the performance of the designer and contractor

The Owner’s Project Manager “Project Manager” is a person or a firm representing the owner that holds overall responsibility for the coordination and management of project activities. The project manager may be the owner (small projects), the design professional, a member of contractor’s staff (usually design-build) or an independent construction manager under contract The project manager is the focal point for project communication and coordination. The project manager oversees the entire range of project activities from start to finish such as initiation, planning and scheduling, administration of contracts, communication and decision management, start-up and project close-out.

THE DESIGN TEAM The owner can use a qualifications-based selection (QBS) process to engage a design team with professionals who have experience and skills that correspond to the project requirements. The basic task of the team is to design a project that meets the project requirements and to provide the plans, specifications, and other contract documents to the level of completion specified in the contract. Most constructed projects are sufficiently complex that the designer supplements its staff with additional specialized consultants (e.g. geotechnical, mechanical, electrical, plumbing, field surveying)

THE CONTRACTING TEAM The contractors’ role on the project team is to plan, manage, and properly execute the construction activities to build the project according to the plans and specifications prepared by the design professional. The contractor assembles a team of material and equipment suppliers, specialty subcontractors, material fabricators, construction trades workers to complete the construction. The contractor is often required to implement an appropriate quality assurance and quality control (QA/QC) program.