MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.

Slides:



Advertisements
Similar presentations
SOFTWARE TESTING. Software Testing Principles Types of software tests Test planning Test Development Test Execution and Reporting Test tools and Methods.
Advertisements

Presentation by Prabhjot Singh
January 14, 2004 TJR - - UPDATED 1/25/04 1 MICE Beamline Analysis Using g4beamline Including Jan 25 Updates for Kevin’s JAN04 Beamline Design Tom Roberts.
Easy DCR Development Control Regulation Online Building Permission System.
1 AFSWG Mtg 15 Aug 2003 Elwyn Baynham RAL Safety Overview Work done by RAL Group Contributors Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov.
G.Barber Mice Tracker Integration Jun Tracker integration.
Slide 1Fig. 22.1, p.669. Slide 2Fig. 22.3, p.670.
1 MICE Hydrogen System Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov RAL MICE / RAL Safety RAL, 30 October 2003.
Slide 1Fig. 17.1, p.513. Slide 2Table 17.1, p.514.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
1 MICE Video Conference Reception of FC magnets Andy Nichols, STFC,
MICE Safety Review Process and Schedule Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov Columbia Meeting June 2003.
MICE Meeting at Columbia University June 13, 2003 Implementation of argon gas jacket Edgar L. Black IIT.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
March 31, Status of the TOF, Ckov and Virtual Detector Packages in G4Mice Steve Kahn Brookhaven National Laboratory Mice Collaboration Meeting March.
Flammable Gas Electrical Safety Concerns for detectors: Power per channel Feedthroughs Seals.
MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Cooling Channel layout Presented by Stephanie Yang & Wing Lau.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
MICE Meeting at Columbia University Absorber windows design comparisons E.L.Black/IIT June/2003.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.
1 CS 426 Senior Projects Chapter 1: What is UML? Chapter 2: What is UP? [Arlow and Neustadt, 2002] January 26, 2006.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
MICE VIDEO Conference 17 th December 2003 Report on AFCSWG Safety Review -- Future Plan By Wing Lau -- Oxford.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
What is UML? What is UP? [Arlow and Neustadt, 2005] January 23, 2014
Database testing Prepared by Saurabh sinha. Database testing mainly focus on: Data integrity test Data integrity test Stored procedures test Stored procedures.
LESSON 8 Booklet Sections: 12 & 13 Systems Analysis.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
Fast TOF for Muon Cooling Experiments Robert Abrams Muons, inc.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Ivowen Ltd1 Ivowen Limited Preparation and Submission of a Traditional Herbal Medicinal Product Application.
© 2011 Autodesk Freely licensed for use by educational institutions. Reuse and changes require a note indicating that content has been modified from the.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
MICE – MUON Interface meeting at Mission Inn, Riverside, California January , 2004 MICE Cooling Channel Integration Issues Wing Lau – Oxford & Steve.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
10 Aug 2010 ECE/BENG-493 SENIOR ADVANCED DESIGN PROJECT Meeting #2.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
1 Search for Worst-Case Forces MICE Video Conference, September 8, 2004 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department,
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Kansas City Hyatt Regency Walkway Collapse By: Ian Thompson Stephen Conlon David Martin Laura Devane.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
PRODUCT VERIFICATION Adapted from the NASA Systems Engineering Handbook for CSULB EE 400D by Alia Bonetti.
LAYOUT OPTIMIZATION USING MANUFACTURING SYSTEMS SIMULATION SOFTWARE (VIP-PLANOPT) Presented by PERUMALSAMY M
ATLAS Internal ID Service Integration
FIRST VIDEO CONFERENCE JANUARY 7, 2004 Edgar L. Black IIT
Integration Group Summary
FRIB PLC Testing & Verification Process
Spectrometer Solenoid Fabrication Status and Schedule
Experimental equipment Edgar L. Black February 17, 2019
Safety Readiness Review (SRR) Thomas Hansson, ESH
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Presentation transcript:

MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT

New modified focus/absorber module

The layout of the new focusing/hydrogen absorber module was completed for the welded and non welded absorber windows. Layouts indicate that both cases are feasible for assembly within the constraints specified. Aspects of safety reliance however, requires a safety verification program for both cases which will be discussed separate from this presentation and it will include procedures, costs and schedule not considered in our original plans.

Integration findings and concerns: During the process of laying out the magnets, discrepancies on the dimensional data were encountered, the data was collected from: B. Palmer documents, the MICE proposal to RAL on January 10, 2003 and M. Green’s papers at Columbia University. The magnets parameters need to be verified, to validate the current layouts Ones the parameters are verified, the “MICE MAGNET LAYOUT” drawing (see next slide) shall be the core for the MICE elements final design and locations.

Essential base for the MICE hardware elements design & location

MICE magnets geometry parameters

Fig. 3.1 “Layout of the experiment”, on section 3 of the proposal, shall be replaced with the drawing in the next slide, it is based on the new focus/hydrogen module design with the modified parameters. Nomenclature of the MICE elements are copied from table 3.1 and the parameters for the elements position along the beam are interpolated with the data sources mentioned above. (Note the TOF 2 and the Cherenkov are transpose in the table ?) Additional drawings in PDF format are accessible on the web.

Layout of the experiment, total assembly

Safety issues Enclosure integrity, gas barrier continuity up to the detectors vessels need to be analyze Additional windows for the detectors, locations and sizes shall be determined Connection between the modified modules require new detail design Criteria for the test and acceptance for all welded and non welded windows is being developed

Partial detector cooling channel safety related assembly details

NOTE : IN THIS LAYOUT THE EXPERIMENT APEARS TO OBEREXTEND BEYOND THE LEVEL GROUND FLOOR ?

Preliminary MICE end view in the RAL facility