MICE Collaboration Meeting March 29 - April 1, 2004 -- CERN MICE Integration Edgar Black/IIT March17-1-007 Room.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Overview of Alignment System. FSI solution: implementation Retrolefrector ball 1” FSI head (TIP-TILT adjustmnent needed) To provide minimum redundancy.
MICE- AFC Unit Mechanical Design of the Cold Mass Support System Oxford University Rohan Senanayake.
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
Vacuum Vessel Production Readiness Review
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No July 2011 Oxford technical drawings by.
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
MICE Collaboration meeting at LBNL: 9 ~13 th Feb, 2005 Force reaction analysis Stephanie Yang Feb 10 th, 2005.
MICE COLLABORATION MEETING CERN March 29-April 1, 2004 Detector/Focus Coil module interface details P. Fabbricatore INFN-Genova Detector/Focus Coil module.
5/7/2003Edgar L. Black IIT MICE Meeting at Columbia University Hydrogen/Focus Module Components assembly Details concept June 13,2003.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
MICE modules interface proposal FAC module Phone meeting Edgar Black IIT 2/13/2004.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004.
5/7/2003Edgar L. Black IIT MICE Integration Meeting Hydrogen/Focus Module Components Details development May 9, 1003.
MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
MICE Preparations for CM18 Michael S. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Video Conference April 12,
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
MICE Target l Jason Tarrant – STFC l Investigative work on T2 with plastic bearings »Stopped after >2 million cycles »Disassembly with photographic investigation.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
STATIC AND MODAL BEHAVIOUR OF THE CLIC MAIN BEAM BPM SUPPORT M. Esposito, EN-MME The research leading to these results has received funding from the European.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
The HyCal Calorimeter from PrimEx A. Gasparian NC A&T State University Greensboro, NC.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Integration of the Spectrometer Solenoid Magnets
FIRST VIDEO CONFERENCE JANUARY 7, 2004 Edgar L. Black IIT
MICE Partial Return Yoke Mechanical Design
The ISOLDE Solenoidal Spectrometer project
List of changes and improvements for the next generation CLIC module
Spectrometer Solenoid Fabrication Status and Schedule
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
UK RFD Pre-Series cryomodule
Experimental equipment Edgar L. Black February 17, 2019
Presentation transcript:

MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room

Alignment considerations for integration What are we aligning A thought on alignment reference Considerations for tolerances Features of integration, design requirements Support structures & transport concepts

Components to be align The MICE cooling channel: 3-AFC modules 2-RFCC modules all the up beam and down beam measuring devices 2- Spectrometer detector modules 2- of each cherenkov, TOF, calorimeter and shielding

Magnets lattice with shrinking estimated values ( black color numbers are the initial dimensions for alignment at room temperature) additional alignments are preformed after shrinkage.

Assembled MICE experiment lattice

Reference for the alignment The beam to be processed is the reference to which the lattice shall be aligned to In principle, a line representing the center of the beam is the main reference for alignment Targets on the outside of the modules vacuum vessels are calibrated to the main reference line for alignment Surveyors fixed bench marks in the RAL facility are referenced to the vacuum vessel targets.

Considerations for tolerances The modules vacuum vessels are the structural supports for the magnets; therefore they are the fulcrum for the alignment of the components within the modules The connecting elements between modules, flanges and fastening devises, provide the means for the modules integration and alignment, this connections shall comply to the following requirements: –Interchangeability of modules at their stages of assembly –Structural longitudinal support against magnetic forces in conjunction with the modules vertical support and anchoring –Hermetic capacity to retain the vacuum within the modules

Integration of modules requirements Primarily maintain the required separation to permit the extraction or removal of the AFC modules Rigidly lock the vessels against internal and external forces in all directions including support to the floor Maintain the vacuum inside the vessels and Provide a quick mean for the assemble and disassemble of the module for removal from the lattice

MICE Sequence of integration

Support structures & transport considerations The performance of this operation requires a careful controlled guided movement so not to tilt or twist the module within the narrow < 2cm gaps at each side of the module The center of gravity of each module shall be carefully evaluated for the location and design of their support Several concepts are to be evaluated against the following requirements: 1.The modules support structures shall have provisions to allow anchoring at the in and out of the lattice positions 2.Shall provide means for the alignment of the module within a given value TBD