NIKON NPL-332 TOTAL STATION

Slides:



Advertisements
Similar presentations
Construction Surveys
Advertisements

Using the Qwizdom Remotes 1.Press and hold the MENU button to turn ON the remote. The double-arrow key is the “send” key. 1.Session ID: , press “send”
1 SET x10/X30 On Board Data Collection On Board Data Collection using the COORD Program sokkia.
Corrections and Adjustments TCA 1800
1 SETX30R/X10 Stakeout by Coordinate. sokkia 2 Stakeout by Coordinate During this brief presentation we will discuss the utilization of the on- board.
Surveying Chain Surveying
SURVEYING II UNIT III TOTAL STATION SURVEYING
Motors and Automatic Target Recognition Motors... l Motorized Instruments have 2 Motors: –One to Rotate the Alidade Horizontally –A Second to Rotate.
Using the Underground Traverse Calculator. Team #1 Begins a Traverse Luke Skywalker and Sandra Bullock begin an underground traverse as Team #1 There.
Types of angles A Z MLN – Horizontal angle ALM – Vertical angle
Chapter 6 Electronic Distance Measurement EDM
Localization. To Perform a Localization 1. Once you have located your first control point, tap the Data menu tab.
CE 260 SURVEYING CHAPTER 5.
1 EDM Calculations ASM 215 EDM CALCULATIONS. 2 EDM Calculations HORIZONTAL DISTANCE MEASUREMENT n In plane surveying, the distance between two points.
“LATEST TECHNIQUES IN SURVEYING
Electronic Distance Measurement (EDM)
Differential Leveling Mr. Conrado Agm 230. Leveling Operations The basic function of the tripod level is to provide the operator with a level line of.
Indiana LICA Contractor Certification Training Workshop 2008 Basic Surveying Concepts.
Profile and Differential Leveling
Differential Leveling
Differential Leveling
Navigation 1 GPS for ICS Navigation 1 Objectives:  Set up a Garmin GPS III Plus for inputting coordinates.  Manually enter three sets of coordinates.
Garmin GPS III Plus Data Collection. Objectives Collect: - Waypoints -Average Position Waypoints -Reference Waypoints - Multiple Tracks in One Track Log.
Surveying I. Lecture 3..
Surveying I. Lecture 13. Tacheometry.
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
PROFILES CREATE STATION LABELS LABEL CENTERLINES OF DAMS, WATERWAYS, DIVERSIONS ETC. To create a profile, you must first sample the existing ground from.
Using the 100B Computer. McDonald’s 100B Controls ON/OFF, left side in split pot. ON/OFF, right side in split pot. Displays oil temperature When lit,
SETTING OUT Horizontal Angles. Ensure instrument is set to measure angles in the appropriate direction. ( refer to operators manual) Unclamp both vertical.
GCS 300 System Operation Application – Level 1.
The Brunton Compass ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures in the slides.
How to Calculate a Traverse with the Traverse Calculator
Chapter (5) Leveling Introduction:
Levelling Applications:
EPOCH 1000 Series Procedure Phased Array Angle Beam Calibration
PRESENTS GENISYS LAB SCOPE TECH TRAINING. To do on car testing, scroll to Diagnostic Toolbox and press Enter. Enter Scroll to Diagnostic Toolbox.
Chap 7 – Differential Leveling
Join Calculation calculation of the
2D Guidance for Excavators on the 3D Display. Configuring a 2D Hex Machine If this was a 2D only display you would only see “Depth and Slope”
Garmin GPS III Plus Setup for Data Collection. Objective Select settings appropriate for each project.
Lesson Applying Differential Leveling Techniques.
How to Navigate a Set of Field Notes….. First the Jargon… Benchmark Backsight Foresight Height of Instrument Elevation Turning Point Station.
Objective To use angles of elevation and depression to solve problems.
CB430 Display Basics. Display Introduction LCD Screen Data Card Door/Slot Main Hardkeys Hardkeys / Softkeys.
Surveying 1 / Dr. Najeh Tamim
Surveying Equipment. Builder’s Level A telescope instrument used to check level of forms or field grades. Builders' levels are designed to be used for.
Construction Surveys. List of Figures Stages and Measurements of CS Design stages: topographic Surveying, and site maps Construction stage: Setting-out.
Chapter (5) Leveling Introduction:
Stadia Reduction.
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
الدكتور المهندس معن حبيب
Unit: Surveying Lesson: Differential Leveling
Surveying Equipment.
Engineering Surveying
Level Loop (or Closed Circuit)
القامة المقلوبة عندما يراد ايجاد منسوب اسفل الجسر (او اي نقطة تقع فوق خط النظر) يقلب وضع القامة بحيث تكون قاعدتها علي النقطة المعنية (شكل 2) وتضاف القراءة.
Unit 5. Levelling.
Leveling.
Leveling.
Leveling.
Leveling.
Leveling.
Leveling.
Surveying a Level Loop Surveying a Level Loop
Differential Leveling
Leveling.
Surveying With Construction Applications, 7th Edition
Presentation transcript:

NIKON NPL-332 TOTAL STATION CE 201 ENGINEERING SURVEYING

NIKON NPL-332 TOTAL STATION SETUP INSTRUMENT: Turn On Rotate Alidade Tilt Telescope

NIKON NPL-332 MEASUREMENT SETTINGS MSR1 or MSR2 Hold down key for 1 sec Target – N-Prism/Prism Const – 30 mm Mode – Normal/Precise Ave – 0 to 99 - 3 Rec – Confirm/All/ MSR

NIKON NPL 332 INITIAL SETTINGS MENU 3: Settings 1: Angle VA Zero : Vert = 0 ANG Reso: 1”/5”/10” HA: 0 to BS/AZIMUTH 2: Dist Scale: 1.00000 T-P: On Sea Level: On C&R: 0.132 3: Coord. Cord.: NEZ/ENZ Label: XYZ/YXZ/NEZ AZ ZERO: North 4: Power Main: OFF EDM: OFF Sleep: OFF 7: Units Angle: DEG Dist: US-FT Input: decimal-Ft Temp: degF Press: inHg 8:Recording 9: Other Settings XYZ disp 2nd Unit Sig Beep Split St. CD Input Owner Detail

NIKON NPL 332 HOT KEY: 1: HT - Input Height of Target 2: T-P - Input Temperature & Pressure 3: Target = Prism 30 mm - Prism Offset 4: Notes = 50 characters BUBBLE INDICATOR: (0) KEY Graphical Check

NIKON NPL 332 MEASURING DISTANCE Sight Target Press MSR1 or MSR2 if ave. count = 0, cont. measurement if ave. count set to >0 , SDx DISPLAY - DSP Key toggle between displays: 1/4, 2/4, 3/4, 4/4

NIKON NPL 332 HORIZONTAL ANGLE ANGLE KEY 1: 0-Set 2: Input – ddd.mmss 3:Rept – angle repetitions 4:F1/F2 – Face Left/Right 5:Hold – hold horizontal angle

NIKON NPL 332 RDM: Remote Distance Measurement PROGRAMS (4 Key) Indirect Distance Measurement PROGRAMS (4 Key) CONTINUOUS (4)

NIKON NPL 332 Remote Distance Measurement Difference between “3:RDM(Radial)” & “4:RDM (Cont.)”

NIKON NPL 332 DISPLAY Sight 1st Pt Sight 2nd Pt MSR1 or MSR2 MAGNETIC AZIMUTH

NIKON NPL 332 REM: REMOTE ELEVATION MEASUREMENT PROGRAMS (4 Key)

NIKON NPL 332 REM: REMOTE ELEVATION Enter HT – Target Height Sight Target MSR1 Sight Vertical Point Read Vh

NIKON NPL 332 JOB SETUP MENU 1: JOB OPEN EXISTING JOB - enter Or CREATE NEW JOB 8 Characters - GRP # Enter – Create Job Abrt (Soft Key) Sett (Soft Key) OK (Soft Key) * = Current Job

NIKON NPL 332 STATION: STN / 7 KEY STATION 10 1: Known ST: Enter Station Pt -10 INPUT N,E,Z N = 1,000.00 E = 1,000.00 Z = 100.00 HI = ________ CD = _______ ENTRANCE OLIN STATION 10

NIKON NPL 332 STATION BACK SIGHT SIGHT BS & ENT STATION 10 2: ANGLE OLIN STATION BACK SIGHT 2: ANGLE BS PT - No Entry AZ – Mag Azimuth – Flag Pole SIGHT BS & ENT STATION 10 ENTRANCE

POINT GUIDANCE Traverse Points – Single Digit Instrument/Setup Pts – Double Digit Sideshots/BM – Triple Digits HMU #4 STATION 11 FIRE #101 B-BALL #5 MILLER #3 OLIN #2 STATION 10 STATION 12 STATION 13 ENTRANCE #1 ENTRANCE #7 PARKING #6

NIKON NPL 332 Bench Mark Survey STN / 7 KEY 4: RBM STATION 10 OLIN Bench Mark Survey STN / 7 KEY 4: RBM Input BM Point – (Flag Pole) PT= 0 - Enter N = No Entry E = No Entry Z = 561.00 HT= ________ CD = FLAG STATION 10 ENTRANCE Sight Benchmark MSR ENT HI ______

NIKON NPL-332 POINT SURVEY SIGHT POINT MSR1 RECORD PT _____ CD _____ ENT Comments Left Cursor – Delete Entry Right Cursor – Overwrite Mode Auto Point Advance = Next Pt = Pt =1

NIKON NPL 332 New Instrument Station STATION 11 STN / 7 KEY HMU STATION 11 New Instrument Station STN / 7 KEY 2: RESECTION PT: 1ST POINT Input Point # – ENTER HT Sight 1st POINT MSR PT: 2ND POINT Sight 2nd POINT B-BALL MILLER OLIN ENTRANCE PARKING

NIKON NPL 332 New Instrument Station STATION 11 (Continued) HMU STATION 11 New Instrument Station (Continued) N (small number good) E (small number good) Z (small number good) REC ST 11 HI ______ CD STATION 11 BS _____(Default 1st PT) ENT B-BALL MILLER OLIN ENTRANCE PARKING