Multiaxial Subassemblage Testing (MAST) System C. French, A. Schultz, J. Hajjar, C. Shield, R. Dexter Department of Civil Engineering D. Ernie Department.

Slides:



Advertisements
Similar presentations
Calyxinfo Walking through Calyx Info The Organisation.
Advertisements

CALIFORNIA DEPARTMENT OF EDUCATION Tom Torlakson, State Superintendent of Public Instruction 2013 Assessment and Accountability Information Meeting Technology.
Network Design and Implementation
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
Clemson University Department of Civil Engineering 110 Lowry Hall Clemson, SC Patrick J. Fortney Clemson University Civil engineering Telepresence.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
NEESGrid: Early Experiences in CyberInfrastructure Charles Severance University of Michigan Sakai Project, NEESGrid Project, OGCE Project
UB Node Network for Earthquake Engineering Simulation (NEES)
UC Berkeley Reconfigurable Reaction Wall NEES Equipment Site NSF NEES Awardees Meeting Video-Teleconference.
Feb 19, 2008 CU-NEES 2008 FHT Workshop Administrative Issues Tom Bowen University of Colorado at Boulder George E. Brown, Jr. Network for Earthquake Engineering.
9/28/01Colorado-NEES1 Fast Hybrid Test Platform for Seismic Performance Evaluation of Structural Systems P.I.s: P. Benson Shing Enrico Spacone University.
RPI NEES SITE 2D Shaker & 2D Laminar Box 4-D In-flight Robot Web-Based Data Acquisition Advanced Sensing Other Aspects –Data Management –Tele-observation.
Centers for IBM e-Business Innovation :: Chicago © 2005 IBM Corporation IBM Project October 2005.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
Upgrading Oregon State's Multidirectional Wave Basin for Remote Tsunami Research S.C. Yim, C.M. Pancake, and C.K. Sollitt Project Overview Goals: Develop.
© 2014 Rockwell Collins. All rights reserved. Middle East Airport Construction Projects: Lessons Learned From an ICT Perspective May 2015.
Broader Impacts in Proposal Writing Sally Bond Assistant Director of Research Development Services Proposal Coordination Office of the Vice President for.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
The BIM Project Execution Planning Procedure
Genesis Solar Module Brochure ™
1 IT Governance 2006 Strategy/Business Case Presentation Department of Human Services.
Information & Technology Services Update Forum May 20 & 21, 2009.
Field Project Planning, Operations and Data Services Jim Moore, EOL Field Project Services (FPS) Mike Daniels, EOL Computing, Data and Software (CDS) Facility.
Feb. 19, 2008 CU-NEES 2008 FHT Workshop Network Infrastructure; Real time viewer; Telepresence; Data Management Kent Polkinghorne Information Technology.
Research Cyberinfrastructure Alliance Working in partnership to enable computationally intensive, innovative, interdisciplinary research for the 21 st.
NEES Equipment Site University of Minnesota Multi-Axial Subassemblage Testing (MAST) 6 Degree-of-Freedom (DOF) Control Technology Ability.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
INTERNET2 COLLABORATIVE INNOVATION PROGRAM DEVELOPMENT Florence D. Hudson Senior Vice President and Chief Innovation.
CS780-3 Lecture Notes In Courtesy of Mengjun Xie.
Betsy L. Sirk Section 508 Coordinator NASA Goddard Space Flight Center
STEALTH Content Store for SharePoint using Caringo CAStor  Boosting your SharePoint to the MAX! "Optimizing your Business behind the scenes"
Managed by UT-Battelle for the Department of Energy 1 Integrated Catalogue (ICAT) Auto Update System Presented by Jessica Feng Research Alliance in Math.
Technology Planning. Primary Elements Stakeholders Leadership team Needs assessment Technology components Work plan Budget Policies Evaluation.
Planning for Arctic GIS and Geographic Information Infrastructure Sponsored by the Arctic Research Support and Logistics Program 30 October 2003 Seattle,
Ms. Irene Onyancha ISTD/Library & Information Management Services United Nations Economic Commission for Africa The Second Session of the Committee on.
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
P R E S E N T A T I O N to Academic Senate Forum 17 – May ALFA TECH.
1 Strategic Plan for Digital Archives Programme DAP PROJECT SCOPE OVERVIEW STATUS.
EDUCAUSE 2005 Annual Conference October 19, 2005.
National Center for Supercomputing Applications Barbara S. Minsker, Ph.D. Associate Professor National Center for Supercomputing Applications and Department.
Grid Based Distributed Hybrid Testing Mobin Ojaghi, Javier Parra-Fuente, Kashif Saleem, Anthony Blakeborough, Martin S. Williams. Department of Engineering.
A Preview of NEESgrid 3.0 Capabilities NEES Consortium Annual Meeting San Diego, CA May 2004.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. In most cases, the information.
NEES Cyberinfrastructure Center at the San Diego Supercomputer Center, UCSD George E. Brown, Jr. Network for Earthquake Engineering Simulation Enabling.
Module 1: Introducing Windows Server 2003 Network Infrastructure Planning, Tools, and Documentation.
Breakout # 1 – Data Collecting and Making It Available Data definition “ Any information that [environmental] researchers need to accomplish their tasks”
UNIVERSITY OF TORONTO SCARBOROUGH 1265 Military Trail, Toronto, Ontario M1C 1A4 CAMPUS DESIGN AND DEVELOPMENT (CDD) COMMITTEE.
August 3, March, The AC3 GRID An investment in the future of Atlantic Canadian R&D Infrastructure Dr. Virendra C. Bhavsar UNB, Fredericton.
EDUCATIONAL TECHNOLOGY IN THE ASIA PACIFIC REGION
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
NEES Networking Needs The NEES MRE: Where the Infrastructure Community Meets the Cyberinfrastructure Community Kyran (Kim) Mish, Director Center for Computational.
Cyberinfrastructure Overview Russ Hobby, Internet2 ECSU CI Days 4 January 2008.
Cyberinfrastructure: Many Things to Many People Russ Hobby Program Manager Internet2.
Internet2 Applications Group: Renater Group Presentation T. Charles Yun Internet2 Program Manager, Applications Group 30 October 2001.
Chapter 12 The Network Development Life Cycle
- George E. Brown, Jr. Network for Earthquake Engineering Simulation ITSC Issues Forum June 21-22, 2006 Vision of NEES Data Legacy Andrei M Reinhorn Director,
State of Georgia Release Management Training
End to End Performance Initiative . Context for E2E Performance High performance backbones are in place Now, under certain conditions within particular.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
Computer skills level one. Grades Distribution: 5% first Quiz 20% first MidTerm Exame. 5% Second Quiz 20% second MidTerm Exame. 10% (Project || participation.
Talent Acquisition, Staffing, Recruitment, Executive Search.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Chapter 1 Computer Technology: Your Need to Know
Strategies for NIS Development
Ch 15 –part 3 -design evaluation
Introduction to Projects
Presentation transcript:

Multiaxial Subassemblage Testing (MAST) System C. French, A. Schultz, J. Hajjar, C. Shield, R. Dexter Department of Civil Engineering D. Ernie Department of Electrical and Computer Engineering D. Du Department of Computer Science and Engineering University of Minnesota NSF George E. Brown, Jr. NEES Site

Overview of equipment proposal MAST system enables multi-axial cyclic static tests of large-scale structural subassemblages including portions of beam-column frame systems, walls, and bridge piers Stiff steel cruciform-shaped crosshead manipulated with 6-DOF control technology enables control of a plane in space (can apply pure planar translations or gradients) System features mixed-mode control capabilities (each DOF may be controlled as either load or deformation) System features four vertical actuators capable of applying 5870 kN (510 mm), and two sets of horizontal actuator pairs capable of applying 3910 kN (400 mm) in orthogonal directions, and four ancillary actuators

Update on Project Status and Schedule Construction of MAST Laboratory (new facility to house NEES equipment) to begin Jan 02. Schematics for facility completed and scheduled for presentation at October UMN Board of Regent’s meeting for final approval. Hydraulic equipment and controller contract made to MTS 9/01. Developing pool of candidates and interviewing for two technical research coordinators (having telepresence and hydraulics/mechanical specialties) Project is on schedule; however, UMN milestone dates for receiving significant input from SI are approaching

MAST Controller Actuators Control Sensors Still Cameras (8) Video Cameras (8) MAST System Still Image Servers (2) Control & DAQ Server Video Servers (2) Archiving & Visualization Server Client PCs (2) Measurement Sensors Core Node MAST System Teleparticipation Infrastructure Campus Network GigaPoP Gigabit LAN Internet 2 Internet 1 NEESPoP

Information for SI Gigabit Ethernet Link available Jan 02 for beta testing on campus, Jan 03 for development within NEES facility Telepresence expertise covered by three co-PIs from 3 depts. (CivE, ElecE, and CompSci) + research coordinator. Co-PIs have experience in streaming video, networking, multimedia computing, and teleparticipation UMN site contains remotely controllable still cameras (8) and video cameras (8) with required transmission rates of 200 Mbits/sec, and ~200 data channels with required transmission rates of 20 Kbits/sec. Data synchronization is important. Tests on specimens may take hours to completion. There may be pauses between load cycles for damage identification. UMN schedule of information needed from SI: - By 12/01: specifications for all hardware, OS, and software - By 4/02: Beta versions of all SI software - By 9/02: Initial verified versions of all software

Information for SI (cont.) UMN prioritization for functionality of MAST operations: Local control of MAST system from Control and Data Acquisition Server Local sensor data acquisition and temporary storage of information on Control and Data Acquisition Server Archiving and retrieval of data after an experiment on Visualization and Archiving Server and at national repository Teleobservation on Client Machine during an experiment Rudimentary playback and visualization of an experiment on Visualization and Archiving server after experiment is completed Teleoperation on Client Machine during an experiment Sophisticated playback and visualization of an experiment on Visualization and Archiving server after an experiment is completed Model-based simulation and integration of simulation with experiments

Questions for SI What are expectations of SI of each individual equipment site? How will expectations and needs of individual sites regarding telepresence/telecollaboration, data archival/management, and model-based simulation be integrated by SI? With plan for 3 early adoptor sites, how will SI ensure that all sites are engaged, i.e., have a voice in decisions/direction; benefit from learning/resources invested in development process; and do not lose precious time to completion? As individual sites develop questions/needs, what expectations can sites have regarding responsiveness of SI? How should this communication be handled, from each individual site to SI or in coordinated fashion? Who is the appropriate contact (e.g. Tom Prudhomme)? How much involvement will SI have in development of metadata protocols, hardware specifications/structure, software specifications/development, telepresence/telecollaboration, data archival/management, model-based simulation etc.?

Information for CD Team MAST system to be housed in new laboratory on campus w/in walking distance of department. Offices for visiting researchers elsewhere on campus. On-site research coordinators will participate in all tests (this ensures safety, functionality, and efficiency) Unique features of MAST include large force and stroke capacities and seamless 6DOF control MAST system can be used to investigate non-seismic research issues and industrial problems UMN prefers long-term vision of hard-funded annual operation and maintenance costs. This would facilitate site scheduling and coordination (e.g., if external researcher uses facility past predicted schedule, hard-funding will lessen impact on facility—researchers will not need to be requested to leave facility for funding considerations). This also helps planning for facility prior to determining which proposals will be funded to use facilities. UMN has expectation for CD assistance with outreach activities and promotion of MAST facility

Questions for CD Team What are the expectations of CD for individual sites? What are CD short term goals (prior to site commissioning)? What is CD long term vision of management (after commissioning)? Short term questions: -Will CD have a role in determining issues such as the format for data archival and desirable features for telepresence? (CD can gather info from external user perspective.) -Will CD facilitate/coordinate site task groups on common issues? -What does CD envision as its relationship with individual sites and SI in short term? - Will CD have or seek any funds for development of common resources/tools? Long-term questions: - How will CD coordinate site scheduling, handle site operation and maintenance costs (hard-funded annually or from project to project), engage external users, integrate contract testing into research schedule, facilitate outreach and training, assess sites, help seek sources of research funding, coordinate proposals?