Progress in water vapour spectroscopy at RAL Dr Robert McPheat CAVIAR Progress Meeting University of Leicester, 24/09/2009.

Slides:



Advertisements
Similar presentations
TAFTS: Comparing Uncertainties in Atmospheric Profiles with the Water Vapour Continuum Ralph Beeby, Paul Green, Juliet Pickering, John Harries.
Advertisements

Progress in water vapour spectroscopy at RAL Dr Robert McPheat CAVIAR Progress Meeting UCL, 13/05/2010.
Progress in water vapour spectroscopy at RAL Dr Robert McPheat CAVIAR Annual Meeting Imperial College, 16/12/2008.
Current CAVIAR activities at Cambridge A.J.L. Shillings and R.L. Jones 1 University of Cambridge, Department of Chemistry, Lensfield Road, Cambridge, CB1.
Leicester lab study CAVIAR spectroscopy meeting at UCL 30 th April 2010 Stephen Ball & Mark Watkins.
CAVIAR meeting May, 13, 2010 – UCL, London 1/11 Cambridge Centre for Atmospheric Science Broad Band Cavity Enhanced Absorption Spectroscopy of the Water.
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
INRNE-BAS MELCOR Pre -Test Calculation of Boil-off test at Quench facility 11th International QUENCH Workshop Forschungszentrum Karlsruhe (FZK), October.
Yu. I. BARANOV and W. J. LAFFERTY Optical Technology Division Optical Technology Division National Institute of Standards and Technology, Gaithersburg,
PillBox Cavity Update (Button Tests) Bob Rimmer NFMCC CM University of Mississippi Jan 13, 2009.
Vacuum Fundamentals High-Vacuum Technology Course Week 8 Paul Nash HE Subject Leader (Engineering)
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
CAVIAR water vapour laboratory FTS measurements Dr Robert McPheat CAVIAR Meeting Cosners’ House, 15/12/2009.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Water vapour spectroscopy in the MSF Dr Robert McPheat CAVIAR Progress Meeting NPL 02/06/2008.
1 Xenon Detector Xenon Detector Group. 2/22 Contents  Construction Status Cryostat PMT mounts  PMT Pisa PMT test PSI PMT test Trouble report  Neutron.
1 CAVIAR meeting in NPL 2 June 2008 Water vapour continuum in near-IR band centres: Recent RAL measurements, results and problems I. Ptashnik & K. Shine.
Progress in water vapour spectroscopy at RAL Dr Robert McPheat CAVIAR Progress Meeting Cosners’ House, 14/12/2009.
Progress in water vapour spectroscopy at RAL Dr Robert McPheat CAVIAR Progress Meeting NPL, 29/09/2010.
Page 1 CAVIAR: TAFTS flight planning: Pt 1 Paul Green, John Harries, Alan Last, Ralph Beeby Imperial College London CAVIAR flight planning meeting 20th.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Cryostat Structural, Thermal, and Vacuum Systems 14 October 2008 Martin Nordby, Gary Guiffre, John Ku, John Hodgson.
KAGRA Vacuum System Items of vacuum sub-group 1 1. Overview VAC (YS) Required Pressure “uhv (ultra-high-vacuum)” in the order of Pa, or lower.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LINE PARAMETERS OF WATER VAPOR IN THE NEAR- AND MID-INFRARED REGIONS DETERMINED USING TUNEABLE LASER SPECTROSCOPY Nofal IBRAHIM, Pascale CHELIN, Johannes.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
1 Fulvio TESSAROTTO Update on the thin RICH beam pipe project - prototypes validation and pipe production - microflanges and fixation system - the intervention.
Dept. Physics & Astronomy Space Research Group Nick Nelms, John Dowson Space Research Group Dept. Physics & Astronomy University of Leicester UK GERB-4.
Emission Spectra of H 2 17 O and H 2 18 O from 320 to 2500 cm -1 Semen MIKHAILENKO 1, Georg MELLAU 2, and Vladimir TYUTEREV 3 1 Laboratory of Theoretical.
1 Fourier transform microwave and infrared study of silacyclobutane Cody van Dijk, Samantha van Nest, Ziqiu Chen and Jennifer van Wijngaarden Department.
A new facility for thermal conductivity measurements Filippo Martelli Univ. of Urbino and INFN Florence GWADW 2006 – 27/5-02/ – La Biodola.
FE Electronics - Overview ASD TDC L0 Buffer L1 Buffer biasL0 BXL1 50 fC DAQ counting room ~100m FE Electronics on the detector GOL Electronics Service.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Misure ottiche su atmosfere planetarie in laboratorio
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Vacuum Fundamentals High-Vacuum Technology Course Week 7 Paul Nash HE Subject Leader (Engineering)
Beamline AILES : Mid IR to THz Spectroscopy The AILES Infrared and THz High Resolution Spectroscopy beamline at SOLEIL (Saclay, 30 km south of Paris) –
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
[1] 3D Micromanufacturing Lab. CO 2 INCUBATOR. [2] 3D Micromanufacturing Lab. What is an Incubator In biology, an incubator is a device used to grow and.
Progress in water vapour spectroscopy at RAL Dr Robert McPheat CAVIAR Progress Meeting Cambridge, 19/02/2011.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Skip 6 positions from the high end. Locate Pin #1 Crimp the cable with one end extending 9 1/2” to the left and 4” to the right. Separate the wires in.
1 Atmospheric Radiation – Lecture 13 PHY Lecture 13 Remote sensing using emitted IR radiation.
Reaction Monitoring with ReactionView ® and ReactionProbe™ In-situ contamination and surface analysis with SpotView and SpotView-SL © Remspec Corp
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 11: STEAM PIPING SYSTEM (1)
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Thermal jumble! (Action list review) C. Marinas IFIC-Valencia DEPFET-Valencia 1 Valencia
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Status of Cooling Development in Karlsruhe
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
MICE Meeting at RAL, Oct-23, 2005
General remarks about the HESR and PANDA vacuum system
Micro-channel Cooling
Goddard Space Flight Center
LARP Vertical Test Facility
Aachen Status Report: CO2 Cooling for the CMS Tracker
Far Detector Activities Late 2017 – Early 2018
Recirculating CO2 System
Pressure Level Sensor OTT PLS
Infrared absorption sepctroscopy (FT-IR)
Aachen Status Report: CO2 Cooling for the CMS Tracker
New TGA-IR Module.
November technical stop activities:
Presentation transcript:

Progress in water vapour spectroscopy at RAL Dr Robert McPheat CAVIAR Progress Meeting University of Leicester, 24/09/2009

Previous MSF Measurements Measurements in the mid- and near-IR. These measurements were intended to target the weak water vapour continuum. –Long path lengths. Measurements carried out at moderate (0.01cm -1 ) & high resolution (0.002cm -1 ) using the Bruker IFS125 HR. Initial measurements revealed a need for better line data too.

Water line parameter measurements Although CAVIAR is targeted at improving the water vapour continuum, errors in line parameters contribute to the measured continuum First measurements with upgraded Bruker IFS120 HR –Upgraded electronics / moving mirror to same specification as IFS125 High resolution measurements cm -1 –Long integration times (~ 12 hours) in mid-IR

5 mm Cell 5 mm path length Electropolished stainless steel for low surface adsorption Spherical reservoir volume to increase volume to surface ratio All metal vacuum system Parylene coated KBr windows attached with low vapour pressure epoxy resin

5 mm Cell

Water line parameter measurements 486 measurements covering mid & near IR Up to 13 hPa pure water Room temperature Spectra delivered to Reading Ongoing analysis of pressure measurements to be completed early next week –Leak rate –Outgassing

Mid-IR Spectra Wavenumber /cm -1

Mid-IR Spectra Wavenumber /cm -1

Near-IR Spectra Wavenumber /cm -1

Near-IR Spectra Wavenumber /cm -1

SPAC upgrade OpticsInnerCooling Jacket

High temperature pressure gauge & filling line Temperature & pressure logging Temperature control Outer vacuum jacket Transfer optics vacuum tank Detector box Electrical feedthroughs

SPAC upgrade modifications Additional base heaters added Inner modified to avoid problems with thermal expansion

Example Spectra Wavenumber /cm – 450 K Up to 1 bar water vapour Up to 5 bar total pressure

SPAC upgrade problems Problems with water condensation on bottom mirror Largely solved with shield & higher temperatures Degradation of mirror surfaces Move feedthrough to bottom of cell Will also solve wiring problems Kapton wires More PRTs Remove humidity sensors Replace O ring Simplify connections

SPAC upgrade modifications Electrical feedthroughs

LPAC Measurements Previous Measurement conditions –Room temperature, ~ 290 K –Water pressures up to 0.75 SVP ( < 20 hPa) –Resolution up to 0.002cm -1 but mainly at 0.01cm -1 –Water/air mixtures at total pressures of 150, 500 & 1000 hPa –Pathlengths of 32, 128 & 512m Made measurements in 3 spectral ranges covering mid/near- IR Planned measurements in 8 – 10 cm -1 region for other work. –Will extend to higher wavenumber if window materials allow

Schedule Complete analysis of 5 mm cell measurements –Next week Complete analysis of existing SPAC measurements & deliver data –Early next month Finish modifications to SPAC & start new measurements –November