Perry. us & ministry aerial application of oil dispersant (due to the large file size, a number of great pictures had to be removed from this presentation.

Slides:



Advertisements
Similar presentations
The Marine Response Centre SPEAKER NAME SPEAKER APPOINTMENT National Contingency Plan – Environment Group Training.
Advertisements

General Safety Overview and Information
Welcome to SMMs Presentation offering a synopsis of our Emergency Response Service on a 24 Hour basis PRESS RIGHT MOUSE CLICK IF YOU WANT TO MOVE BACK.
AIRCRAFT HANDLING Part 2 Ground Handling.
Air Traffic Management
Spill Response Waste Reduction. Gold Crew Gold Crew with the following capabilities: Spill Cleanup – Concentrated Type II Water based Oil Spill Dispersant.
South Old Bridge Vol. Fire Co. Standard Operation Procedures for Hazardous Material Incidents.
Where are we now? D.Napier / W.Crawford Dropped Object Progress.
Pollution in the Sea The Sea Empress Disaster February 1996.
Irish Coast Guard Local Authority oil spill Contingency Plans.
Crude Oil and the Environment ENVE 202 Dr. A. Kerç.
AIR NAVIGATION Part 5 Weather.
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
Transport Railways Incident Procedures. Aim To give students information about the emergency procedures to be adopted at incidents involving railways.
Singapore’s Actions Against Oil Pollution
Chapter 19 Transport Operations.
ERIKA Sea Tech Week, Brest, 19 th of october 2006 Captain Charles Claden.
Salvage and Marine Firefighting Requirements Intertanko North American Panel March 21, 2011 Steven Candito President National Response Corporation (NRC)
Observer Scanner Training by 1 st Lt. Alan Fenter.
Leading Cadet Training
At-sea oil spill response options. Oil spill response options for use at sea Monitor and EvaluateMonitor and Evaluate Contain and recover at seaContain.
FPS PUBLIC HEALTH, FOOD CHAIN SAFETY AND ENVIRONMENT « Provinciaal Hof », Bruges, Belgium October MIMAC 2006 : International conference on.
An Emergency Response Training Program for the DG Transport Industry
AIRCRAFT HANDLING Part 4 Flight Preparation.
WALK OFF MATS 1 © HOST UK LTD Back To Basics Part 1 80/90% of Soil in Normal Carpets is Dry (Dupont) – The dryness of soil in Walk Off Mats varies.
Guidelines for Traffic Control at Surface Mines
Airfield Snow Removal Tactics. Runway Condition?
Microlight flights lessons Exercise Circuits.
Sep 2012 Lesson 3.4 Air Law Air Traffic Rules. Reference From the Ground Up Chapter 5.1: Air Traffic Rules and Procedures Pages
Backing & Spotter Safety
BSAC Ocean Diver Training
AIRCRAFT HANDLING Part 5 Pre-Take Off Checks. Starting Engines Starting engines is a team procedure between the pilot and the ground handling team. The.
1 The Bronze C Airmanship. 2 Is about common sense and thinking ahead Therefore being a minute ahead of the action.
5.3.1Analyze the risk associated with offshore oil production The offshore oil industry accounts for 29% of reported oil releases/spills. P Oil.
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
Ice Navigation & Seamanship A tanker master’s experience
9/17/2015 GEM Lecture 20 Content Flight preparation –Equipment –Weather conditions –Flying height –Coverage.
(MEP) Safety Forum in Riga Essential Elements: Thorough flight preparation, including: Training lesson / examination session planning (Flight Plan, sequence.
6-1 Design of UAV Systems UAV operating environmentsc 2002 LM Corporation Lesson objective - to discuss UAV Operating Environments including … National.
Leading Cadet Training
AIRTANKER BASE MANAGER (ATBM).
US IL Flying Club June 1 st, VERSION 4.
Y - 1 Oil Spill (Mid - February 1999). Y - 2 At 0200 in a thick fog, a barge carrying oil rammed one of the Chain Bridge supports Despite the collision,
By Jesse Buchman. We don't know exactly what happened to cause the blowout, but there will no doubt be months of investigations. The basic idea of what.
CANADIAN COAST GUARD AUXILIARY - PACIFIC COORDINATION OF MULTIPLE SURFACE UNITS CANADIAN COAST GUARD AUXILIARY - PACIFIC February 2012.
Oil drift modelling BE-AWARE II Final Conference, November, Ronneby, Sweden Co-financed by the EU – Civil Protection Financial Instrument.
Take-off and the circuit. Take-off  Take-off is the phase of flight in which an aircraft goes through a transition from moving along the ground (taxiing)
Basic Wildland Fire Management
Response modelling including dispersants BE-AWARE II Final Conference, November, Ronneby, Sweden Co-financed by the EU – Civil Protection Financial.
1 BLUE SIGNAL PROTECTION Blue Signal Protection of Workmen This rule outlines the requirements for protecting railroad workmen who are inspecting,
Environmental Tragedy.  Prince William Sound was known as Alaska’s “Emerald Jewel” because of its crystal clear waters.  The Sound was home to more.
In Situ Burning Mark Gregory – USCG Eleventh District Response Advisory Team Response Advisory Team.
REGULATIONS FOR ARMY AIRCRAFT CW2 ROBERT GOEBEL. Administrative Please turn off all: –Cell phones –Beepers –Palm Pilots –Gameboys –Stereos –Watch alarms.
Environment Mick Borwell Environmental Issues Director.
Inspections – Other Areas Other Areas –Interface documents between operators & contractors –EMS – review previous EMS audit report –Heli-Fuel Skid – condition.
Competition Flight  Launch  Start  Final Glide  Finish.
Work Place Transport. Members of the BPF Health & Safety Committee.
Case study: Grounding of CSL Thames in the Sound of Mull, UK, on 9 August 2011 TAIEX Workshop on Marine Casualty Investigation 5-6 September 2012 David.
First Aid & Survival Skills
Learning Engagement tool (LET)
AIR TRAFFIC ONTROL.
Mission Aircrew Course Search Planning and Coverage
USCG Roles & Responsibilities During a Ship Fire
Chapter 19 Transport Operations.
ANIMAL WELFARE: THE ROLE OF SHIP OWNERS
REDUCED VERTICAL SEPARATION MINIMA (RVSM)
INTERNATIONAL MARITIME SECURITY.
Vehicle Movement - Surfacing
Training Presentation Truck Controller- Surfacing
Aerodrome Certification Workshop
Presentation transcript:

perry

us & ministry

aerial application of oil dispersant (due to the large file size, a number of great pictures had to be removed from this presentation. We apologize.)

present fleet

TURF & EYES : the story continues

pause

the Sea Empress incident : dispersant spraying at its most effective case study : Sea Empress Workshop on the application of dispersant in the Dutch part of the North Sea

success due to number of factors The success of the spraying operation at the Sea Empress incident was due to a number of factors : - The primary ‘clean up’ response for dealing with oil spillage in UK waters was (and still is) aerial dispersant spraying, due to the length and nature of the coastline Legislation for the use of dispersants had been in place for several years; the method and rules of approval had been well established, practised and refined during exercises and incidents So only local approval and confirmation was required Equipment was readily available close at hand Personnel were an experienced & motivated team Size of the spill, location and type of oil were optimal Weather conditions were suitable for effective spraying

EQUIPMENT AND PERSONNEL Centrally-located surveillance and spray aircraft together with crews ( ) were available on permanent standby: 30 minutes call during the day, Centrally-located surveillance and spray aircraft together with crews ( including engineers and ground loading teams) were available on permanent standby: 30 minutes call during the day, and 2 hours at night Aircraft arrived at the forward base loaded with dispersant, and sufficient stock was stockpiled locally to enable operations to continue without delay Forward operating airfields near to the incident had been pre-identified equipment & personnel 1

EQUIPMENT AND PERSONNEL Loading pumps and safety equipment were held permanently on the spray aircraft and functionally checked weekly equipment & personnel 2 Three main, centrally located, dispersant stockpiles were mobilised and the IBC tanks moved to the forward base Aircrew and ground support teams were well trained and practised – in addition to operations, drills were held monthly and deployment exercises twice a year

size & nature of spill 9 discrete oil spills over a period of 6 days Biggest was 20,000t and the smallest 2,000t Total spillage 72,000 tonnes of Forties blend crude and 360 tonnes of heavy fuel oil The oil was amenable to dispersant size of spill

location & weather LOCATION AND WEATHER Tanker ran aground at the entrance to the harbour Forward airfield was available close by Weather was mostly good for dispersant use : wind speed - more than 10 knots. sea state - breakers present (up to state 7/8)

STRATEGY Because dispersant works more efficiently on freshly spilled oil and there were regular discharges from the tanker, the strategy was : Concentrate on freshly spilled oil first Spray ‘weathered’ oil later, if required STOP spraying when :- - sufficient dispersant applied - no longer effective due emulsification - slick too broken for effective spraying - weather unfavourably calm or too windy Monitor and spray again as necessary strategy

oil stats +PO spraying SEA EMPRESS 70,000 tonnes spilled in total 37,000 tonnes (52%) of spilled crude oil DISPERSED 10,000 tonnes NATURALLY 27,000 tonnes AFTER AERIAL DISPERSANT APPLICATION SEA EMPRESS 70,000 tonnes spilled in total 37,000 tonnes (52%) of spilled crude oil DISPERSED 10,000 tonnes NATURALLY 27,000 tonnes AFTER AERIAL DISPERSANT APPLICATION

general guidelines & SOPs general guidelines and operating procedures for spraying operations general guidelines and operating procedures for spraying operations Workshop on the application of dispersant in the Dutch part of the North Sea

control & guidance Control & Guidance From start to finish, control of spraying is under the guidance and direction of the surveillance aircraft, using standard operating procedures.

safety of airspace The surveillance crew and dispersant spraying team initially determine the dimensions of the ‘safe’ operating area Control over the ‘safe’ area is established by national emergency controlling authorities requesting restrictions over the airspace and sea area Ideally the operating area should be kept completely clear of all other aircraft, vessels and obstructions All spray operations are strictly daylight VFR For example in the UK, the Secretary of State is enabled through an act of parliament to declare a ‘temporary exclusion zone’ (TEZ) around a ship or structure at sea The National Air Traffic Services have the authority to establish a temporary danger area (TDA) to restrict flying All aircraft movements within the TEZ and TDA are controlled by the surveillance aircraft crew safety of airspace

initial role of surveillance crew Initial role of surveillance aircraft crew Establish, survey and control the ‘safe’ operating area Obtain & confirm approval to use dispersant Confirm dispersant type Confirm geographic & water depth constraints Locate position of thickest oil Determine ‘spray’ pattern Brief, guide & direct the test spray Assess and report the effectiveness of test spray

efficient application The surveillance aircraft crew determine position of the thick oil within the slick either visually (seen as true colour, discontinuous true colour, or metallic appearance) or using the IR detector. The spray pattern is then oriented to ensure that the dispersant is applied only to the thick oil, not sheens. Visual observation can confirm the dispersant is working. The oil will spread rapidly and there will be a ‘milky’ plume mainly at the edges. efficient application

application Application Dispersant is delivered by aircraft fitted with approved spray systems. Aircraft normally fly into wind at low level, feet above the surface, at about 140 knots, depending on aircraft type Normal dose rate 1 t of dispersant to 10 / 20 t of oil

THICK OIL SHEEN SURVEILLANCE AIRCRAFT (700 FT – 1000 FEET) SPRAY ‘OFF’ CLIMB STRAIGHT AHEAD TO 300 FEET SPRAY ‘ON’ LEVEL AT 30 FEET LEVEL AT 30 FEET spray pattern SPRAY CIRCUIT SPRAY AIRCRAFT CIRCUIT HEIGHT 300 FEET WIND spray pattern

DISPERSANT MONITORING VESSEL’S TRACK Effectiveness THICK OIL SHEEN After the spray aircraft has cleared the area the dispersant monitoring vessel is called in by the surveillance aircraft. Data is collected in clear water, the sprayed area, and the oiled area, using UV fluorescence spectroscopy. Data is analysed and the results passed back to the surveillance aircraft SURVEILLANCE AIRCRAFT AREA SPRAYED If the dispersant monitoring team are not available, the dispersant effectiveness is assessed visually by the surveillance crew and passed to the response authorities If the results are positive i.e. the dispersant is working – spraying continues and monitoring takes place at regular intervals between deliveries effectiveness

role of surveillance aircraft crew during main spraying operations Brief & direct the spray aircraft in the pattern Direct the in-situ monitoring vessel Monitor the area and spill between spray applications Stop spraying when sufficient dispersant has been delivered or as required by the response authorities main role of surveillance crew

questions ‘DANK U WEL’ THANK YOU QUESTIONS ?