CAEN power supplies The neverending story Jennifer Pursley Johns Hopkins University Silicon Workshop II, May 10-12, 2006 University of California, Santa.

Slides:



Advertisements
Similar presentations
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Advertisements

HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
Steve Hahn, CDF Meeting - October 7, CDF Operations Summary Shutdown progress  Work finishing up in west and east bores COT  Loose cables SVX 
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
MP530 Maintenance. General Description  The MP530 maritime computer is used in a wide range of Operator Stations (OSs) produced by Kongsberg Maritime.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
ISL David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
UCSB Silicon Workshop: Shutdown Review Ankush Mitra Academia Sinica.
Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs DAQ Power Supply Needs HV à 600 V/~1mA range –0.1-1  A Current Sensing –Over Voltage/Current.
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
Purpose Learn how to use basic electronic equipment:
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
Chapter 7Assembling Your Own Computer System  7.1Assembling the Hardware 7.1Assembling the Hardware 7.1Assembling the Hardware  7.2Installing the Operating.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
ZTF Interconnecting Scheme Stephen Kaye
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
COMPUTER COMPONENTS.
Robert Gomez-Reino on behalf of PH-CMD CERN group.
Verigy V93000 Service Training
Ageing … Eric Kajfasz (CPPMarseille) D0 Workshop, Beaune, June 17, 2003 DØSMT.
LV and HV status of the RPC system RPC detector and trigger group.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
Overview What is Arduino? What is it used for? How to get started Demonstration Questions are welcome at any time.
D0 Workshop Bagby, Foglesong John Foglesong Run 2B SMT Low Voltage Power The present location of the SMT DC power supply units creates a problem.
Physics 2225: Working With Electronic Equipment Purpose  Learn how to use basic electronic equipment: Digital multi meter Oscilloscope Function generator.
Oct 29, 2001 Ron Sidwell 1 Purple Card. Oct 29, 2001 Ron Sidwell 2 Purple Card Spec Two channels per printed circuit board Size ~20 sq. in. or best effort,
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
1 Availability and Controls Tom Himel SLAC Controls GG meeting January 20, 2006.
1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Computer Hardware Maintenance & Repairs Computer Hardware Maintenance & Repairs Suleiman Mohammed (mncs,mcpn) Instructor Institute of Computing & ICT,
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
12/17/01 Ron Sidwell 1 Run2b Datapath 17 Dec Update Bill Reay, Ron Sidwell, Noel Stanton, Russell Taylor, Kansas State University.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
8-May-2010 LV Workshop1 Alignment LV: quick’n dirty HW review Alignment uses CAEN low voltage –No HV –Low power consumption electronics: under kW.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
COMPUTER COMPONENTS Ms Jennifer Computer Components.
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
Avaya VA Line-interactive UPS
LKr status R. Fantechi.
Computer and Information Technology for HKCEE
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
FNAL Production Experience
Pierluigi Paolucci - I.N.F.N. Naples
Domestic Electricity AIM: To understand the use of domestic electricity and safety features such as fuses, circuit breakers and the earth circuit
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

CAEN power supplies The neverending story Jennifer Pursley Johns Hopkins University Silicon Workshop II, May 10-12, 2006 University of California, Santa Barbara

J. Pursley - Silicon Workshop II2 System overview: Diagram courtesy of J. R. Mumford

J. Pursley - Silicon Workshop II3 Infrastructure: the SY527 Universal Multichannel Power Supply system CAEN mainframe, has 10 board slots NOT custom-made, also used for plug power supplies Communicates via serial connection (RS232 port or CAENET coaxial cable) Control power supplies (settings and on/off) from front panel NOT radiation hard, but located in the collision hall! These are what you hockerize (reboot the crate CPU)

J. Pursley - Silicon Workshop II4 Collision Hall Map: 16 crates Mounted on CH walls, with fib racks 4 crates in each corner, numbered clockwise (sort of…) Roughly, 2 PS crates = 1 fib Even number fib is SVX, odd is ISL/L00 Diagram courtesy of M. Stanitzki

J. Pursley - Silicon Workshop II5 Crate Naming Conventions CrateReset PanelPS Interlocks Crate 1SVX NW Top 1NW Top Top Crate 2SVX NW Top 2NW Top Bot Crate 3SVX SW Top 1SW Top Top Crate 4SVX SW Top 2SW Top Bot Crate 5SVX SW Bot 3SW Bot Top Crate 6SVX SW Bot 4SW Bot Bot Crate 7SVX NW Bot 3NW Bot Top Crate 8SVX NW Bot 4NW Bot Bot West Side

J. Pursley - Silicon Workshop II6 Crate Naming Conventions CrateReset PanelPS Interlocks Crate 9SVX NE Top 1NE Top Top Crate 10SVX NE Top 2NE Top Bot Crate 11SVX SE Top 1SE Top Top Crate 12SVX SE Top 2SE Top Bot Crate 13SVX SE Bot 3SE Bot Top Crate 14SVX SE Bot 4SE Bot Bot Crate 15SVX NE Bot 3NE Bot Top Crate 16SVX NE Bot 4NE Bot Bot East Side

J. Pursley - Silicon Workshop II7 The Workhorse: SVX Modules (A509) Occupies 1 slot in SY527 1 board powers 1 wedge  5 Bias channels  5 Low voltage (AVDD & DVDD)  2 portcard (2V & 5V DOIMs)  Total: 18 channels 73 supplies in CH (72 for SVX wedges, 1 for a L00 wedge) VMax = 250V, IMax = 5 mA Cable pinouts designed for SVX Layer01234 VMax (V)

J. Pursley - Silicon Workshop II8 Next up: ISL Modules (A510) Occupies 2 slots in SY527 1 board powers 1 wedge  10 Bias channels  5 Low voltage (AVDD & DVDD)  2 portcard (2V & 5V DOIMs)  Total: 23 channels 30 supplies in CH VMax = 250V, IMax = 5 mA Bias Adapter, double LV cables Layer00,0110,1120,2130,3140,41 VMax FWD VMax CNTL 140

J. Pursley - Silicon Workshop II9 Finally: L00 Modules (A509H) Occupies 2 slots in SY527 1 board powers 1 wedge  Bias channels  4 Low voltage (AVDD & DVDD)  2 portcard (2V & 5V DOIMs)  Total: 15 channels 11 supplies in CH VMax = 500V, IMax = 36/23 mA Sense, LV, and Bias adapers! Extra feature: crowbar on bias line Layer0123a,3b VMax (V)90 160

J. Pursley - Silicon Workshop II10 L00 Crowbars Protect Si from PS failure 2 mA fuse on each bias line Now frequently blown in beam incidents (eg kicker prefires or nasty quenches) Blown fuse = no bias on sensor Most L00 sensors draw measurable current now; check for blown crowbars by biasing L00, look for 0 current Automatic crowbar tester! No light = blown fuse

J. Pursley - Silicon Workshop II11 Junction Cards Same junction card used for SVX, ISL, and L00  Extra LV and Bias connectors to accommodate ISL Cables in CH run from PS racks down into the bore  And across the COT face… This is the closest we can get to the silicon! Diagram courtesy of J. R. Mumford

J. Pursley - Silicon Workshop II12 Common Failure Modes – SY527 Crate CPU gets in a funny state  Some symptoms: “Crate xx lost communication” (or you see anything turn blue in IMON) All supplies in one crate spontaneously turn off Garbled readback of voltage/current of a ladder (could lead to trigger inhibit)  Solution: hockerize! Fan failures: frequent in plug crates, but none of ours (yet…) 1 damaged backplane (not fun!) Remember: must turn crate off for ~10 mins before removing power supplies, or could blow a PS fuse

J. Pursley - Silicon Workshop II13 Common Failure Modes – PS Overcurrent trips  Maybe the current is going high – try raising limit, watch plots  Also a common PS failure, usually fixable at FCC Overvoltage/Undercurrent trips  Approx. the same thing – if the voltage is set above the limit, the supply clamps it down before tripping  Usually a PS failure Undervoltage trips  Supply can’t get to the set voltage  Common PS failure (esp. of ISL supplies), NOT fixable at FCC Software protection trips  Voltage/current doesn’t trip the hardware  Software limits stricter than hardware, but requires the value stay above the limit for several mins before tripping  Usually denotes a readback problem, check values in IMON

J. Pursley - Silicon Workshop II14 Less Common Failure Modes Transistor regulating the Bias voltage blows  Symptoms: ladder voltage ramps up to VMax (250V or 500V) and doesn’t trip  Can’t be turned off, have to cut power to the whole crate  This is the failure mode crowbars were introduced to prevent! Large current offsets Erratic or oscillatory voltages/currents (seen on DVDD and Bias) Crate doesn’t recognize power supply  Not fully connected to backplane, X28HC256 prom is garbled…  None of the other supplies in the crate will work if there’s one in there the crate can’t recognize! Supply won’t work in one particular slot/crate, but is fine in another Usually require expert diagnosis!

J. Pursley - Silicon Workshop II15 Summary Love ‘em or hate ‘em, CAENs are here to stay Increasing frequency of failures may be due to radiation exposure or aging  9 PS swaps in 2005; 4 in first 3 months of 2006 Do our best to:  Work w/ FCC to minimize downtime from common failure modes (eg hockerization)  Hassle CAEN to make more spare crates and PS (and to fix the broken ones faster!)  Get creative (such as, put a PS with failure on one ladder in for a wedge where that ladder is out of the HWDB for other reasons!)

Backup Slides

J. Pursley - Silicon Workshop II17 Loadbox testing Must test a new PS before hooking it up to the detector Do this by cabling it to a junction card with a loadbox attached Loadbox uses constant and variable resistances to mimic a silicon wedge