Mike Zelazny FAC April 17 th, 2007 Matlab Applications Image Management Bunch Length Measurement Feedback Software Engineers.

Slides:



Advertisements
Similar presentations
SNS Integrated Control System SNS RDB Requirements, wish list, status A little history l Oracle RDB used exclusively by accelerator physics group l JERI.
Advertisements

Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
LCLS Control System Overview Mike Zelazny SLAC ICD Software Department Accelerator Directorate.
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
Working group report T500 and E203 Armin Reichold 30/08/2011 A Reichold, for SP group, FACET User Meeting, SLAC 1.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Online Data Analysis and Simulation Sven Reiche UCLA - 09/22/04 Sven Reiche UCLA - 09/22/04.
June 17, 2008 LCLS FAC D. Fairley MATLAB Feedback Phase II Commissioning.
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
Debbie Rogind & Greg White High Level Applications October High Level Applications.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Paul Emma Injector/BC1 Commissioning April 20, Injector/BC1 Commissioning (Dec. 1, ’06 through Aug. 1, ‘07) P. Emma LCLS.
November 12, 2008 Controls Software D. Fairley LCLS Feedback.
Oct. 30, 2007 LCLS FAC D. Fairley MATLAB Feedback Phase II Commissioning.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
The Soft-IOC Based Alarm Handler – an Operations View Pam Gurd October 31, 2007.
Scan System Kay Kasemir, Xihui Chen Jan Managed by UT-Battelle for the U.S. Department of Energy Automated Experiment Control “Scan” should be.
Scan System: Experiment Automation Kay Kasemir, Xihui Chen RAL EPICS Meeting, May 2013.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
Controls Murali Shankar Luofeng Li Mike Zelazny Archiver Appliance Report Fall 2012.
Tells - a facility for web-based, remote real time laboratory experiments University of Limerick Ireland.
Beam diagnostics control for J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar
Group Electronique Csnsm AGATA SLOW CONTROL MEETING 19th fev AGATA PROJECT PREPROCESSING MEZZANINE SLOW CONTROL GUI FOR THE SEGMENT AND THE CORE.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
BPM System Status P. Cameron 13 Aug 07. Outline 1.Notes from NSLS-II Design Review (last Thursday) 2.System Block Diagram 3.Process Variables 4.DAQ status.
Controls Debbie Rogind EPICS Collaboration Oct SLAC LCLS First Year in Operation and Controls Lessons Learned Debbie Rogind SLAC Controls Software.
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
Michael Borland Advanced Photon Source Using SDDS for Accelerator Commissioning and Operation Michael Borland Operations Analysis Group Advanced Photon.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues “How to integrate the legacy system.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg June 18-20, SLAC Tune Tracker/Feedback Mike Laznovsky.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues Subsystem architecture, or… “How.
Franz-Josef Decker 14-Dec-2011 CSR is a big deal limiting performance Tolerance studies beforehand helped a lot Tor’s List Software adaptability helped.
Hamid Shoaee LCLS Facility Advisory Committee October Control System Overview Hamid Shoaee for the LCLS Controls Group.
LCLS MD Downtime William Colocho June 2014 to June 2016.
LCLS Commissioning & Operations High Level Software
Operations Machine Simulator.
Automation and Feedbacks
Beam-Based Feedback in LCLS-II
Longitudinal Diagnostics for start-up
LCLS Commissioning & Operations High Level Software
Work Update J. Rzepiela 8/17/10.
BC2 Commissioning Parameters
What am I working on… H. Loos 08/02/2010.
Phase II Commissioning
Data Mining Ideas.
OCELOT orbit correction and optimizer
Linac/BC1 Commissioning P
A Virtual Implementation of VELA (CLARA)
LHC Position Data The presentation follow-up from:
High Level applications development status
LCLS Commissioning P. Emma, et al
High Level Physics Applications for LCLS Commissioning
Linac Physics, Diagnostics, and Commissioning Strategy P
Linac Diagnostics Commissioning Experience
easYgen-3000XT Series Training
Injector Diagnostics Status
LCLS Control System Personnel Linac & BC2 Controls progress
SLC-Aware IOC Magnet Functional Requirements
High Level Physics Applications Lehman Review February 7 - 9, 2006
Presentation transcript:

Mike Zelazny FAC April 17 th, 2007 Matlab Applications Image Management Bunch Length Measurement Feedback Software Engineers Sergei Chevsov Diane Fairley Mike Zelazny

FAC April 17 th, 2007 Image Management Matlab Scripts Profile Monitor Support Soft IOC Profile Monitor IOC Profile Monitor IOC Profile Monitor IOC MPS IOC (for burst mode)

Mike Zelazny FAC April 17 th, 2007 Bunch Length Measurement Bunch Length Measurement Matlab Scripts BPM IOCs Image Management Matlab Scripts Profile Monitor IOC Profile Monitor IOC Profile Monitor IOC MPS IOC (for burst mode) Toroid IOCs TCAV IOCs

Mike Zelazny FAC April 17 th, 2007 Matlab Feeback Framework allows user to defined Actuators, States and Measurements as PV lists allows the user to save/restore configuration values (limits on actuator, state and measurement values; PID values, timer intervals etc) on a softIOC allows the user to start/stop feedback and change state setpoints dynamically performs the actual feedback calculations

Mike Zelazny FAC April 17 th, 2007 Feedback Support soft IOC stores the last 1000 points of actuator, state, and measurement values stores configuration parameters edm screens allows user to view the current feedback performance in real-time

Mike Zelazny FAC April 17 th, 2007 Feedback Simulator soft IOC simulates Measurement (BPM, BLEN, energy, current) values based on changes in RF or Magnet values

Mike Zelazny FAC April 17 th, 2007 Individual Feedback Status DL1 Energy - PID feedback coded and tested with simulator Spect. Dump Energy - PID feedback coded and tested with simulator DL1 Energy + BC1 energy + Bunch Length - PID feedback coded and tested with simulator Injector Launch feedback - algorithm needs work Bunch Charge Feedback - need algorithm definition

Mike Zelazny FAC April 17 th, 2007 Matlab Feedback Concerns: memory issues - need to test on systems in MCC how will it perform over several hours? can we run more than one feedback per kiosk or desktop in MCC?

Mike Zelazny FAC April 17 th, 2007 What’s not done? No background images available because MPS Burst Mode hasn’t been implemented. Physicists are asking for an alternate, maybe temporary, method to collect background images. TCAV hasn’t been commissioned. Channel Access can be slow to Profile Monitor IOCs.