AME 40463 Senior Design Group E3: Hewlett-Packers February 19, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.

Slides:



Advertisements
Similar presentations
Project Management Requirements Prof. Ralph V. Locurcio, PE.
Advertisements

Bad News Bots E2 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland Concept Design Review.
Robo-FootballE2 Project Design Review 1 - 1/31/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Game Development Essentials An Introduction. Chapter 11 Production & Management developing the process.
The Design Process Engineering Graphics Dr. Stephen Crown.
If it is lighter, is it farther? Project by Onyea Sholty 2009.
AME Senior Design Group E3: Hewlett-Packers Concept Design Review April 24, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
John Wloch Wind-Aid Preliminary Design Review 19 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
Robotic Football Group E1 CDR Team Top Gun April 22 nd, 2008.
ELM4701/02: ELM Projects I & II The mini-project has served as a practice project. It has given us the opportunity to explain our expectations and you.
John Wloch Wind-Aid Preliminary Design Review 26 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Small-Scale Solar Power Solar Power Rangers ~ Kevin Kastenholz 13 March 2008.
John Wloch Wind-Aid Preliminary Design Review 8 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
AME Senior Design Group E3: Hewlett-Packers January 29, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle O’Reilly Benjamin Rowland.
TableTop VEX Competition This game is designed to be played on a tabletop. We post this game for your enjoyment. Change the rules as you see fit for your.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
May Madness 2005 This year’s game adds another dimension to the engineering challenge. This year’s game includes both an autonomous and a LEGO remote.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday February 21, 2008.
ABET 1 SAYS - Your Senior Design Course Should Include Engineering design is the process of devising a system, component, or process to meet desired needs.
AME Senior Design Group E3: Hewlett-Packers February 26, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
A6: Team Rallye Potable Water Still Presented by: Entire Group September 28, 2006 Eric Sabelhaus Nicole Del Rey Mike McConnellTim Rodts.
AME Senior Design Group E3: Hewlett-Packers March 11, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
14 October 2004AME 470 – Team Unum PDR #10 – 11 November 2004 Subsystem Integration Tim Culbertson Team UNUM.
Bad News Bots E2 Project Design Review 2 - 2/7/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
CSC230 Software Design (Engineering)
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
13 : Omni-Directional Robot Ben Wolf Brent Cornelius Ed Cramer John Grabner James Grabner Advisor & Client: Dr. Nikola Elia.
Challenge #1 – Relay Race Robot #1 will be randomly placed on starting line #1, #2 or #3. Robot #1 will drive until it detects the “Dark Line” - Robot.
How to Make a Marshmallow Shooter By Pierce H..
PROJECT 3 STEPS— BUSINESS CARDS Planning and designing a business card.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Washburn Tech. What is Washburn Tech? A student who is on track to graduate may choose to attend a hands-on program at Washburn Tech A student who is.
Competitive Analysis Lesson 5 0. Agenda 5.1Product Description and Paper Prototype Revisions 5.2Project Planning 5.3 Competitive Analysis and Pricing.
Abdulmotaleb El Saddik Prof. Dr.-Ing., FIEEE, FCAE University Research Chair ELG 4913F ELG 4913F Electrical Engineering Design Project II
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
Team 1764’s. 1. Rules and Regulations 2. Game Brainstorming 3. Design Brainstorming 4. Design Development 5. Project Development 6. Test and Trials 7.
OVERALL ROBOT DESIGN, FTC STYLE PRESENTED BY: ANDY BAKER Sept
The Network Performance Advisor J. W. Ferguson NLANR/DAST & NCSA.
Robotics and Time Management  Robotics and Automation Copyright © Texas Education Agency, All Rights Reserved. 1.
ENGINEERING NOTES KID WIND By: Luis.C Miguel.M. Materials List  Screws……………….. ( base attachment )… …..#26  Nails………………….. ( Base attachment ) #10.
AME Senior Design Group E3: Hewlett-Packers March 18, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
1 Introduction to Engineering Team Design Project Agenda Team project description Introduction to design process. Brainstorming.
Design for Manufacture and Assembly Introduction Note: this is an adaptation of a presentation from Dr. Denis Cormier, intended for use as an Intro to.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
1 © The Delos Partnership 2003 Supply Chain Techniques Getting the plan executed.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
Engineering design is the process of devising a system, component, or process to meet desired needs. It is a decision-making process (often iterative),
AME Senior Design Group E3: Hewlett-Packers February 7, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
J. Vanhove Projects bvba. Presentation of the Magic Pillow The solution for uncomfortable and cold spectator seats in football stadiums: The magic pillow.
18 March 2004 / Rev. 01 Cyber Blue – Team 234 Perry Meridian High School Indianapolis, IN Design Review Process Documentation This document is intended.
AME Senior Design Group E3: Hewlett-Packers (Robo-football Quarterback) March 27, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
PLUMBING PARTS Plumbing ensures that a royal flush always beats a full house.
SeaPerch Structural System
SeaPerch Structural System
Chapter 2 The Process of Design.
UAL Level 2 GAMES AND ROBOTICS Design Document
SeaPerch Structural System
A Peek At What We Are Learning
SeaPerch Structural System
Foundations of Technology The Engineering Design Process
Presentation transcript:

AME Senior Design Group E3: Hewlett-Packers February 19, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant

Project Description Robo-Football Demonstration and Competition Development Intercollegiate robotic “football” competition to encourage interest in science and engineering Develop robot-based game with elements similar to American Football Develop rules of the game and design robot(s) to demonstrate its fundamental features and technology for the game

Previous Week’s Action Items Item 1 : Start Trade Studies – Trade Study Proposals turned in – Begin research and analysis individually Item 2: Buy Parts for Air Cannon – Went to Lowe’s, Home Depot, and Ferguson’s – Acquired pipes, joiners, end caps, primer and cement – Ordered Schrader valve and 2.5” PVC pipe online – Acquired tennis balls

Current Status Current Graphic – Air Cannon to be built Design Status – Finishing Trade Studies – Beginning to order prototype components – Air Cannon parts ordered Schedule – Weren’t able to get 2.5” PVC and Schrader valve but were able to order online – On schedule

Current Graphic Air Cannon ours will be modeled after

Next Week’s Action Items Item 1: Finish Trade Studies – Complete analysis and documentation – Present results to rest of group – Make all design decisions relevant to prototype Item 2: Prepare Parts for Air Cannon Assembly – Cut PVC pipes to desired lengths – Drill necessary holes into pipes and end caps – Apply adhesive primer where needed

Thank You Questions?