A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Advertisements

Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Integrating Acquired Subsystems Bob Dalesio 09/21/99.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
LSU 10/09/2007System Design1 Project Management Unit #2.
Distributed Control Systems Emad Ali Chemical Engineering Department King SAUD University.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
Optical Anchor / Interferometer Status: June, 2004 Josef Frisch.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Berliner Elektronenspeicherringgesellschaft für Synchrotronstrahlung mbH (BESSY) Accelerator and Experiment Control and Monitor Systems Ralph Lange BESSY,
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
Data Acquisition Dr inż. ZDZISŁAW PÓLKOWSKI Polkowice, 2015 University of Pitesti Dolnośląska Wyższa Szkoła Przedsiębiorczości i Techniki w Polkowicach.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Integrating Acquired Subsystems Bob Dalesio 11/29/98.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Joshua Stein LCLS Undulator 20 Feb 06 LCLS Undulator Controls ANL LCLS All-Hands Meeting February 20, 2006 Josh Stein Argonne.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Operations, Test facilities, CF&S Tom Himel SLAC.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
LHC Collimation Project Integration into the control system Michel Jonker External Review of the LHC Collimation Project 1 July 2004.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
The recent history and current state of the linac control system Tom Himel Dec 1,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
Pioneering Science and Technology Office of Science U.S. Department of Energy UNDULATOR SYSTEMS REVIEW MARCH 3-4, 2004 ARGONNE NATIONAL LAB. 1 LCLS Optical.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
BaBar Transition: Computing/Monitoring
ATF/ATF2 Control System
The ILC Control Work Packages
LAMP Vacuum System Documentation
Low Level RF Status Outline LLRF controls system overview
PLC / SCADA / HMI Controllers: Name : Muhammad Zunair Comsats University Date: 28-October-2018.
Linac Coherent Light Source Procurement
Undulator Scope, Management, and Organization
Low Level RF Status Outline LLRF controls system overview
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
LCLS Undulator System Status and Schedule
Project Management Unit #2
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Breakout Session SC3 – Undulator
Presentation transcript:

A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department of Energy LCLS - Undulator Controls WBS S. Joshua Stein

Pioneering Science and Technology Office of Science U.S. Department of Energy 2 [UCS] - Design Philosophy The LCLS Undulator Control System (UCS) will be designed as a stand-along control system with interfaces to the existing SLAC control system. Commercial products will be used whenever possible to avoid duplication of effort and maximize the benefits of product maturity. When a novel design is required, all attempts will be made to create a “product” which will be useful in both the LCLS-UCS and the SLAC control system.

Pioneering Science and Technology Office of Science U.S. Department of Energy 3 [UCS] - Resource philosophy Whenever possible, APS manpower will be utilized in the design and implementation of the UCS. External consultants will be used to help bridge the gap between SLAC and APS and fill in for engineering manpower that APS is unable to supply. -Bob Dalesio (LANL) is currently working with both APS and SLAC on LCLS control issues. His primary goal is to ease the communication between the different (independent) control systems. In addition, his experience in implementing control systems for multi-laboratory projects make him uniquely qualified in this role. -Technical design effort will be outsourced as needed from a wide pool of talent in the EPICS community.

Pioneering Science and Technology Office of Science U.S. Department of Energy 4 [UCS] - Schedule and cost estimates Whenever possible, real-world experience was used as a basis of estimate for both material and effort costs. Using engineering experience from within the APS controls group (who designed and implemented the control system for the APS and LEUTL), initial estimates were gathered from a diverse resource pool. Also, consultant effort has been utilized to check and scrub the initial UCS schedule. Many controls requirements are still not defined well enough for accurate vendor-based quotations. However, making practical assumptions allowed for creating estimates that we feel are significantly better than a wild guess.

Pioneering Science and Technology Office of Science U.S. Department of Energy 5 [UCS] - Interface with SLAC While the UCS will be self-sufficient, there is by necessity a large amount of communication required between the two control systems. -Software - It is expected that the undulator section will be accessible from anywhere within the LCLS control structure. As such, software interfaces will be designed to accommodate such a requirement, while maintaining the integrity of the individual control systems. - To leverage the knowledge of the APS controls group staff and minimize unnecessary effort, the EPICS control system platform was chosen for the UCS. EPICS has a proven track record in the accelerator (and FEL) community.

Pioneering Science and Technology Office of Science U.S. Department of Energy 6 [UCS] - Interface with SLAC (timing) -Timing - Significant effort will be expended in research and design to assure that timing information from the injector is available to the UCS and diagnostics. - We envision the design of EPICS compliant timing boards which will reside in both VME and PCI backplanes. These boards will accept the SLC timing messages and output EPICS compatible data for all of the subsystems within the UCS that require timing and time-stamp information.

Pioneering Science and Technology Office of Science U.S. Department of Energy 7 [UCS] - Interface with SLAC (MPS) -Machine Protection - To protect the undulator components, a machine protection system (MPS) will be implemented along side the UCS. This system will be responsible for notifying the LCLS injector of a shutdown condition when a (machine oriented) dangerous situation arises.

Pioneering Science and Technology Office of Science U.S. Department of Energy 8 [UCS] - Interface with SLAC (commissioning) Our goal is to turn over a completely seamless and operational undulator system to the LCLS. In this regard, as much as possible the control system will be designed, tested and verified at the APS. Work done at SLAC should be restricted to commissioning and test. Training will have to be done after the commissioning process to allow the operation of the undulator by SLAC personnel.

Pioneering Science and Technology Office of Science U.S. Department of Energy 9 [UCS] - Motion platforms Fine Motion -Strongback Cradle - Current motion platform based on cam movers - Stepper motors with rotary encoders - Overall effect to move Quadrapoles - Purpose: Beam Steering and tuning within the intra- undulator space - Position feedback via external sensors (wire position monitors covered in Undulator alignment)

Pioneering Science and Technology Office of Science U.S. Department of Energy 10 [UCS] - Motion platforms Fine Motion -Scanning Wire Transducer - Using SLAC standard SWA assembly - Stepper motors with rotary encoders - Purpose: Characterize the beam Position Size Shape

Pioneering Science and Technology Office of Science U.S. Department of Energy 11 [UCS] - Motion platforms Rough Motion -Diagnostic Stage Selection - Translate diagnostic “elevator” - Stepper motors - Purpose: Select which Diagnostic stage (OTR, SWA, “No- Diagnostic”) is in use at each station -Camera controls - Adjust Focus and aperture for both OTR and inspection cameras - Stepper motors - Purpose: “Tune” video picture

Pioneering Science and Technology Office of Science U.S. Department of Energy 12 [UCS] - Signal Analysis RF BPM [33 in total - one per break section] -Physics design to be done by SLAC - Detectors (RFBPM) - Front-end electronics (amplification) -Interface with Timing triggers -Physics requirements will determine ADC resolution and conversion rate - expected to be bits at 40MHz - VME backplane -High data rates may necessitate individual processors for each BPM.

Pioneering Science and Technology Office of Science U.S. Department of Energy 13 [UCS] - Signal Analysis Charge Monitor [1] -Hardware to be designed by SLAC - Toroid and ICT pair -COTS VME based ADC -Interface with Timing triggers Scanning Wire [33] -Hardware to be designed by SLAC - Mechanical Assembly including motors -COTS VME based ADC -Interface with Timing triggers

Pioneering Science and Technology Office of Science U.S. Department of Energy 14 [UCS] - Video OTR Stages [11] -Acquire and analyze beam - Position - Shape - Size -30 Hz capture and analysis rate (1/4 SLAC trigger) -Large FOV requirement at “reasonable” resolution - Allows digital “zoom” - No need for two camera configuration - Digital interface for frame grabber

Pioneering Science and Technology Office of Science U.S. Department of Energy 15 [UCS] - Video OTR Stages (continued) -Provide operator/scientist “warm fuzzy” - Rough beam alignment - Requires video mux and routing via UCS Observation video [7] -Color “analog” cameras for visual inspection only -To be integrated in video mux system from OTR stations.

Pioneering Science and Technology Office of Science U.S. Department of Energy 16 [UCS] - Temperature monitoring Two thermal sensors per each strongback -Used for low data-rate trend analysis and alarms

Pioneering Science and Technology Office of Science U.S. Department of Energy 17 [UCS] - Vacuum control Pump controller interface to control system -Whenever possible, commercial pump controllers will be purchased with standard communications protocols (Serial, Ethernet, etc.). Vacuum gauges -Whenever possible, commercial gauges will be purchased with standard communications protocols (Serial, Ethernet, etc.). RGA -Typically, these devices use embedded PCs as both a user interface and data acquisition unit. Integrating these into the UCS will most likely be done via Ethernet based function calls. Vacuum Valve -Position monitoring only via binary inputs from limit switches.

Pioneering Science and Technology Office of Science U.S. Department of Energy 18 [UCS] - Software Control software will be run on the EPICS ‘platform’ -Defines a low level control schema and implies higher-level software. Whenever possible, existing software will be utilized -Software maturity is an important part of creating a stable control system. High level tools will be installed or written to allow flexible ‘science’ software and support the LCLS community as much as possible without compromising the UCS. -Correlated and consistent operator screens -Data archiving -External software hooks

Pioneering Science and Technology Office of Science U.S. Department of Energy 19 [UCS] - Machine Protection System (MPS) Scope needs to be fully defined before details extracted Must interface with SLAC to inhibit beam trigger Local (inter-undulator) machine protection may include: -Cherenkov detectors -Motion limit detectors -Vacuum - Pressure - Gas detection - Valve position

Pioneering Science and Technology Office of Science U.S. Department of Energy 20 [UCS] - Machine Protection System (MPS) System must be independent of the UCS -Regardless of response time of UCS, MPS must be able to shutdown beam within specified parameters. Current estimates based off of ‘standard’ MPS components within the APS and take into consideration: -I/O types -Number of channels -Response time

Pioneering Science and Technology Office of Science U.S. Department of Energy 21 [UCS] - Design documentation It is important to create and maintain system documentation from the beginning of the design process to avoid the “as built” syndrome. In particular, all installed hardware and software will be logged and tracked via ‘live’ tools such as the APS developed IRMIS suite. -Maintain an integrated, comprehensive and searchable database of: - Installed hardware - Control software - Cable - And all interconnections…

Pioneering Science and Technology Office of Science U.S. Department of Energy 22 [UCS] - Cost and Schedule Undulator controls initial scrub schedule completely integrated within LCLS overall WBS. -Notable Milestones - Cradle motion controls complete : February RF BPM controls complete : March OTR Video capture and analysis complete : June 2005 Material and Effort numbers within reasonable bounds for TPC -Total Cost : $4.78M -Total Effort : 5.3 FTE

Pioneering Science and Technology Office of Science U.S. Department of Energy 23 [UCS] Cost and resource loading An attempt has been made to distribute resource needs over the project construction timeline in order to allow the use of staff and technicians from within the APS controls group A more balanced profile may be possible with further schedule scrubbing -FY04 : 0.1 -FY05 : 3 -FY06 : 1.7 -FY07 :.5