Project Update 5/9/06 E. Colby, E163 E163: Laser Acceleration at the NLCTA Goal: Demonstrate the technical feasibility of laser-driven particle acceleration.

Slides:



Advertisements
Similar presentations
Initiating Devices Manual Fire Alarm Boxes Ionization Smoke Detectors
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
E163: Laser Acceleration at the NLCTA Goal: Demonstrate the technical feasibility of laser-driven particle acceleration Photonic band gap structures made.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
NETS Network Upgrade!.  304 Telecommunication Outlets (TO's) each with 4-copper and 4-fiber connections were installed.  255,000 Feet of CAT6A copper.
E163: Laser Acceleration at the NLCTA Eric Colby, ARDB For the E163 collaboration Safety Overview Committee Meeting Sept. 19, 2002.
DAQ&CM Infrastructure Paul Drumm. Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
Jo Beth Folger FAC - CF Breakout – Sector April 8, Sector 20 Project Overview Sector 20 Site Plan Description Schedule.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Construction and Installation of the CLIC Experimental Area
HVACR311 – Electrical for Refrigeration International Mechanical Code Relating to Refrigeration.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
Upgraded Injector Test Facility 2015 Users Group Board of Directors Update Akers/Experimental Nuclear PhysicsJanuary 13, 2015.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
LIGO-G W eLigo PSL laser diode room strawman design Rick Savage, Anamaria Effler, Peter King.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
1 HVACR318 – Refrigeration II International Mechanical Code Relating to Refrigeration.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
1 Mechanical for Oil Heat Mechanical codes. 2 Every state has codes. They may be the same in some states, but different in other states. Always have a.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
Thomas Jefferson National Accelerator Facility SensL 6-Oct CHL-2 12 GeV CEBAF Upgrade magnets and power supplies Two 1.1GV linacs Enhanced capabilities.
David Saenz EIR Review Oct 9-11, Conventional Facilities (CF) WBS 1.9 ETC and Methodology David Saenz CF Systems Manager.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District July 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
Progress of Shintake Monitor (ATF2 IP-BSM) KEK site meeting 2008/10/31 Takashi Yamanaka.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Fiber Accelerating Structures Advanced Accelerator Research Division By Andrew P. Hammond What technology is needed for the next powerful linear accelerator.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
ELENA installation progress F. Butin / ELENA collaboration.
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
The Next Generation of a Gamma Irradiation Facility GIF++
CBETA Technical Review
CLEX* Status and Plans CTF3 complex CLEX
Conditions at a potential location of a beam dump experiment at LCLS-II Clive Field, SLAC: 4/29/16.
RWTCS Steering Commitee
Maintain a single control room for all accelerator programs
Woodpile Structure Fabrication for Laser Acceleration at E163
User Facilities 2016 Users Group Board of Directors Update
XFEL Collimation and Beam Switchyard Vacuum Issues
Sector 20 Project Overview
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Installation Status & Operational Readiness Process
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

Project Update 5/9/06 E. Colby, E163 E163: Laser Acceleration at the NLCTA Goal: Demonstrate the technical feasibility of laser-driven particle acceleration Photonic band gap structures made by lithography (top) and fiber-drawing (bottom). Stanford University Bob Byer (co-PI), Tomas Plettner SLAC Eric Colby(spokesman), Bob Noble, Bob Siemann (co-PI), Jim Spencer, Dieter Walz Ben Cowan, Melissa Lincoln, Chris Sears (students)

Project Update 5/9/06 E. Colby, E163 E163 Layout RF System LASER ROOM SHIELDED ENCLOSURE NLCTA N E163 Counting Room (b. 225) 225 Moved here Summer 2003 Completed Completed 1/05 ORION Extension 2005 Oct 2003 Add/change equipment inside NLCTA enclosure: March 2004 Overhead Cable Tray

Project Update 5/9/06 E. Colby, E163 E163 Plans August 2006: Complete installation of beamline in Experimental Hall August/September 2006: Internal Readiness Review, including FPSC walk-through Sept/Oct 2006: First experimental runs Oct 2006—March 2009: E163 Experiment Runs No scheduled plans for expanding the experimental hall.

Project Update 5/9/06 E. Colby, E163 Concrete Shielding Enclosure Fire Detection and Alarm System (“Area 2”) Combustible Content: ~200# cabling in trays 30% of signal cables are NOT LSNH ALL remaining cables to be LSNH FF88 to be applied to non-LSNH cables in fire-blocking stripes at 10-20’ intervals Occupancy: FTE per year Structure lifespan: >10 years Construction Cmpltd: 2004

Project Update 5/9/06 E. Colby, E163 FireFree88 Application: 24” long stripes around cable bundle: + At top and bottom of vertical cable tray runs + every ~20 feet of horizontal runs

Project Update 5/9/06 E. Colby, E163 Laser Room Fire Detection and Alarm System (“Area 1”) Combustible Content: ~50# cabling, ~100# books, ~1 liter solvents, 1 rack of electronic equipment Cabling is moderate-to-low density In-duct FP11 detectors on intake and discharge sides of HVAC In-room FP11; horn; strobe Structure lifespan: >10 years Construction cmplt: Feb 2005

Project Update 5/9/06 E. Colby, E163 E163 Concrete Enclosure Roof Fire Detection and Alarm System (“Area 3”) Combustible Content: ~200# cabling, 7 racks of electronic equipment 30% of signal cables are NOT LSNH ALL remaining cables to be LSNH FF88 to be applied to non-LSNH cables in fire-blocking stripes at 10-20’ intervals Structure lifespan: >10 years Install Cmplt: Summer 2006 Ionization detectors above racks deemed unnecessary given volume of the ambient airspace (~1/2 million cu ft) and existence of ionization detectors on the ceiling.

Project Update 5/9/06 E. Colby, E163 E163 Counting Room (b. 225 Relocated) (“Area 7”) Equipment lifespan: >10 years Relocated, upgraded: Combustible Content: ~200# cabling 30% of signal cables are NOT LSNH ALL remaining cables to be LSNH FF88 to be applied to non-LSNH cables in fire-blocking stripes at 10-20’ intervals 6 racks of electronic equipment Occupancy: FTE Fire Sprinklers throughout, flow switch connection to FACP at bldg 229.