MuCool Test Facility Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 12/13 August 2002.

Slides:



Advertisements
Similar presentations
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Advertisements

MTA Instrumentation M. Haney University of Illinois at Urbana-Champaign 25 February 2004.
Open Channel Flow Panel Meters The materials included in this compilation are for the use of Dwyer Instruments, Inc. potential customers and.
1 Hardy Process Solutions – New Product Introduction HI6600 Series – Modular Sensor System Hardy delivers productivity solutions to manufacturers and processors.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
Instrumentation: ground and noise Temperature Measurement.
Slow controls and instrumentation of MICE 1.Physics and systematics 2.How the state of the cooling channel gets defined 3.Engineering for the signal readout.
Flammable Gas Electrical Safety Concerns for detectors: Power per channel Feedthroughs Seals.
MICE LH2 Absorber Instrumentation - What is necessary/ desirable? (physics calibration) Temperature inside the the absorber Temperature inside the absorber.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
Mucool LH2 Absorber Progress and Pauses Mary Anne Cummings FNAL August 12, 2002.
Feb Absorber/coil instrumentation and controls  Subsystems Absorbers RF Magnets  Monitoring/safety  Data acquisition: Information on system.
You Can Measure the Benefits… Training Course Introduction to SmartScan.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
Hall D Solenoid Controls. Rockwell Software Overview RSLogix5000 (PLC Programming) RSLinx Classic (Rockwell software/hardware interface) FactoryTalk (GUI.
The Interface Solution Experts Intrinsically Safe Design, TCM installs in: Class I, II, & III Div 1 and 2 (Zones 0/1 & 2) Up to 32 Channels.
3D Micromanufacturing Lab. School of Mechatronics Gwangju Institute of Science and Technology 3D Micromanufacturing Lab. School of Mechatronics Gwangju.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
SCADA and Telemetry Presented By:.
Problem Statement TelosB Charging/Metering Kit Power from 2 sources Charge AA or AAA NiMH batteries Monitor Current, Voltage and Power Deliverables 3 Fully.
E-LABORATORY PRACTICAL TEACHING FOR APPLIED ENGINEERING SCIENCES W O R K S H O P University of Oradea, Romania February 6, 2012 G E N E R A L P R E S E.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
7526A Precision Temperature/Pressure Process Calibrator
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Cooling Channel Instrumentation Update M. Haney University of Illinois at Urbana-Champaign 6 February 2004.
Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
TPC/TRD DCS meeting, GSI, 27 Sep 2002Børge Svane Nielsen, NBI1 TPC laser system controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser.
15 March 2001Absorber Review Meeting at NIU1 DAQ for Pressure Test, and later... Michael J. Haney University of Illinois
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
Grounding Guidelines Developed for LBNE
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Series RHP Temperature and Humidity Transmitter The materials included in this compilation are for the use of Dwyer Instruments, Inc. potential.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
16722 Mo: data acquisition150+1 data acquisition.
FEB Slide 1 Task No.:Point(s):1Only one answer is correct.Cat. No. To measure electrical … A current, the ammeter must be in line with the current.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
MICE Detector Integration A. Bross Mice Video Meeting August 27, 2003.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
ACT20X Ex isolator/ amplifier. Page 2 ACT20X (Ex isolators family) Overview - Connects to process equipment in Class/Div, or Zone 0 - Zone 2 areas - ACT20X.
TRANSMISSION LINE MULTIPLE FAULT DETECTION AND INDICATION TO EB
COMPUTER COMPONENTS Ms Jennifer Computer Components.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Logging and Alarms Apparatus monitored through GPIB – LakeShore temperatures – Agilent power supplies – AMI liquid level monitor Apparatus monitored through.
Electronics Plastics Film or Paper Medical (packaging) Chemical Painting.
1 Sensors and Switches... WHAT’S IN THE BOX? 2 Sensors and Switches... SENSORS, CORDSETS & PROX SWITCHES.
S A Griffiths CM42 June 2015 Electrical & Control.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Site Controller Unit and Trunk Interface Unit
ProtoDUNE SP – Slow control temperature readout setup test
Linac Test Area Instrumentation
Electrical Safety Standards
MuCool Test Facility Instrumentation Update
Linac Test Area Instrumentation
Setup for testing LHCb Inner Tracker Modules
University of Illinois (UIUC)
MEMS 8x8 Fiber Optical Switch
MEMS 12x12 Fiber Optical Switch
MEMS 48x48 Fiber Optical Switch
University of Illinois (UIUC)
Presentation transcript:

MuCool Test Facility Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 12/13 August 2002

m. haney, et al.2 Instrumentation Seeking an intrinsically safe solution for instrumenting the LH 2 absorber in the MTF –Prudent to accommodate MICE and European safety considerations –i.e. do it right the first time…

12/13 August 2002m. haney, et al.3 Objective - Safety Intrinsic safety, if possible –Limited power per channel Good idea for Fermi; required for Europe Gas-purged enclosure, if necessary –19” rack, 40U tall

12/13 August 2002m. haney, et al.4 Instrumentation (1) Lakeshore 218S –8 channel cryo temperature monitor +/- 21m K at 10 K –16 readings/s –GPIB interface (to PC) TG-120PL GaAlAs diodes (8) –-180mV/K at 4.2 K –B < 5 T; rad hard

12/13 August 2002m. haney, et al.5 Instrumentation (2) FISO Fiber-optic strain and temperature –BUS chassis, with 4 (up to 8) modules 1000 readings/s RS-232 interface (to PC) FOS-N strain sensors –+/- 500  ; 0.01% full scale; 0.2mm O.D. FOT-L temp sensors –0.1 K resolution; 1.5mm x 32mm (10mm active) –Slow: 1.5 second response…

12/13 August 2002m. haney, et al.6 Instrumentation (3) Gateway E-4000 PC –1.8 GHz, 1Gbyte RAM, 0.5Gbyte cache –120Gbyte disk, Windows 2000 –15” LCD flat panel display –640x480 CCD camera, microphone PCI-MIO-16E-1 –16 channel ADC, 1.25 Msample/s, 12 bits, +/-10 V Tripplite Smart UPS –3000 VA

12/13 August 2002m. haney, et al.7 Instrumentation (4) IRM –64 channel multiplexed ADC 16 bit, 100 Ksamples/s –ACNET network connection All PC data will be posted to IRM for ACNET access

12/13 August 2002m. haney, et al.8 Instrumentation (5) MTL7055ac barriers –Low level AC 24  per line 3 V max MTL7060ac barriers –Star-connected AC 101  per line 8.5 V max

12/13 August 2002m. haney, et al.9 (basic) Barrier Power + Signal Return Ground “safe circuit” fuse

12/13 August 2002m. haney, et al.10 Signals inside (the cryostat) 8 (cryo) temperatures –readout via GPIB + LabView (PC) Multiple fibers –FISO strain, temperature (4) Pressure, flow? –Laser occlusion (2) –Simple spark detectors (2) (light pipe to photodiode) 25(ish) 4-wire bolometry strips

12/13 August 2002m. haney, et al.11 (more) Signals inside Piezo vibration sensor –via (16 chan/12 bit) ADC and LabView (PC) Local (64 chan/16 bit) IRM channels –via “LabView” (see last slide) MICE channels (?) –placeholder for the future…

12/13 August 2002m. haney, et al.12 Signals outside USB (4 wires, and shield) for CCD camera and microphone –via PC Many voltages, currents, temperatures, pressures –magnets, beam position monitors, etc. –Most available from ACNET or local IRM via “LabView” (see last slide) –or Cyro-PLC

12/13 August 2002m. haney, et al.13 Two Possibilities (1) Intrinsically safe UPS PC w/16 chan ADC FISO Cryo(temp) IRM Barrier(s) network ACNET Sealed Conduit(s) Intrinsically safe signal conditioners and transmitters power Hazard Safe

12/13 August 2002m. haney, et al.14 Two Possibilities (2) Gas-purged box UPS PC w/16 chan ADC FISO Cryo(temp) IRM Barrier(s) network ACNET Sealed Conduit(s) power Hazard Safe

12/13 August 2002m. haney, et al.15 This Summer – Z. Conway LabView interface –GPIB to cryo temp monitor - works –PC-internal ADC (e.g. for piezo) – “works” Simple ADC data read - works High rate collection and compression – not yet –IRM communications IRM-ADC Read - works Write – any moment now… Integration – remains!

12/13 August 2002m. haney, et al.16 Open Issues Wire+Shielding Concerns –Noise/sensitivity issues due to wire+barrier resistance? Approx 12  /ft for 36 AWG manganin wire 48  to 202  added by barrier –And diode capacitance… –Common mode (surges) due to magnets? Need to protect electronics without burning barriers –Cable plant into solenoid

12/13 August 2002m. haney, et al.17 Open Issues (2) Software Concerns –Posting data to the IRM For ACNET access –Reading data from ACNET For PC access –Remote control of PC Citrix ICA, PCAnyWhere, etc. LabView web-remote instrumentation KVM?

12/13 August 2002m. haney, et al.18 Open Issues (3) FISO strain and temp sensors –Not official rated below -40 C (!) –Temp has been used at 35 K (custom) No experience with strain gages –Company very willing to work with us To adjust signal conditioner, correction curves, etc. Will require some form of agreement –Confidentiality, exclusivity for the instrument –Yet freedom to use and publish measurements –Also pressure, flow?