Location in CSD of electronic detector reconstructed events Scanning results from LNGS scanning lab N. D’Ambrosio, N. Di Marco, L.S. Esposito, P. Monacelli and all the shifters that have been working since September
Event number: CSD ID: Brick location: W29/RW9/COL12, rock side SX = SY = PX = 0.27 cm PY = 0.25 cmPZ= cm with Dario and Antoine
Event number : CSD ID: Brick location: W28/RW8/COL8, rock side SX = SY = PX = 1.21 cmPY = 0.19 cmPZ = cm with Dario and Antoine
Event number: CSD ID: Brick location: W29/RW9/COL8, corridor side SX = SY = PX = 0.24 cmPY = 0.20 cmPZ = with Dario and Antoine
Brick position in OPERA detector The brick position has been calculated using the nominal geometry
Microscope efficiency Double refreshed films exposed to CERN beam in July
Scanning, processing and event selection 1.General scanning 6 6 cm 2 on both CS around the prediction position 2.Top-bottom linking MinGrains 7 (actually set up in the microscope DAQ because of the higher fog density that slows the acquisition) MinSlope = 0 MergePosTol = 20 m MergeSlopeTol = PosTol = 30 m SlopeTol = rad SlopeTolIncreaseWithSlope = Basetrack quality cut –Sigma<N Event selection – tan( <0.040 respect to the ED prediction 5.CS connection – tan( < && r < 40 m && Ntot 40
Event Scanned area 4.8 4.1 cm 2 Located in emulsion on 18/11/ :54 Confirmed manually
Event : not located CSD ID: (near edge, big slope) –6.0 x 3.1 cm 2 on 29-NOV-06
Event : not located CSD ID: –6.0 x 6.0 cm 2 on 17-NOV-06 (surface lost) –6.0 x 6.0 cm 2 on 20-NOV-06 –6.0 x 6.0 cm 2 on 27-NOV-06 –9.2 x 9.4 cm 2 on 29-NOV-06 CSD ID: (near edge) –6.0 x 3.3 cm 2 on 23-NOV-06
Event : 3 out of 4 microtrack analysis BatchLink, version 2.0 modified with striplink option Quality cut for basetrack: Sigma<N Promote microtracks to base-tracks if N 9 Select all tracks if the slope respect to ED reconstruction Proceed with the standard analysis –For the connection of a basetrack and a microtrack –40 m && 150 mrad && slope(basetrack-ED reconstruction)<0.040 No candidate was found with Cristiano
Event : double measured basetracks The two 6 6 cm 2 zone in the same CS has been link together according to: – slope (basetrack-ED reconstruction) < –N 20 for at least one basetrack – SX(bt1-bt2) < && SY(bt1-bt2) < basetracks are selected on CS1, 5 are manually confirmed, no track found in CS2 according to projection 9 basetracks are selected on CS2, 6 are manually confirmed, no track found in CS1 according to projection
August run event beam
CS candidates reproducibility EVENTMEASUREDFOUND We re-measured the 3 August run events that we have in LNGS In case of good tracks the system has a good reproducibility
ED-CS connection
CS1-CS2 connection Here the mark grid were not measured automatically, it has been corrected in the successive measurements
Link top-bottom microtracks OFFSET
CSD exposed to cosmic rays 6 OPERA bricks were exposed to CR in order to fully simulate the OPERA scanning procedure ( , , , , , ) CS candidates were sent by mail to European scanning labs Scanned area: –4.0 4.0 cm 2 in the central zone of 6 CSD –3.0 9.2 cm 2 along the short side of 5 CSD 193 CSD candidates / 234 cm 2 0.82/cm 2 Expected number 100/CS 0.83/cm 2
Manual check To have a feeling of reliability of the cut used for the CS candidates selection the manual check has been performed for the tracks of CSD This CS candidate has 39 grains In one case a basetrack has been measured with a wrong angle, some test are in progress
We have to better use the mark position Some divergence in the X ray beam
CSD scanning driven by DB All scannings have been driven by DB Now the machinery works smoothly: –4 scanning workstations works together –3 data processing computers –1 DB server –1 Batch Manager It needs easy operations by shifters from scanning workstations: –submit the job –change plate
CS scanning: modules Three programs have been written: CSScanDriver: controls, connects CSD, saves basetracks information in the DB WideAreaScanDriver: scans areas in strips, manages strip linking, checks quality continuously BatchLink: links strips optimizing performances –the old StripLink has been replaced by “custom” version of BatchLink in order to benefit for future code developments
Input DB tables TB_PREDICTED_BRICKS ID_EVENT ID_EVENTBRICK PROBABILITY TB_PREDICTED_TRACKS ID_EVENT TRACK Z POSX POSY SLOPEX SLOPEY FRAME POSTOL1 POSTOL2 SLOPETOL1 SLOPETOL2 A simple program that reads ED predictions from a text file and inserts them into the DB TB_PREDICTED_EVENTS EVENT ID_PROCESSOPERATION ID POSX POSY POSZ TYPE with emulsion DB group
Output DB tables TB_CS_CANDIDATES ID_EVENTBRICK ID_PROCESSOPERATION ID_EVENT TRACK CANDIDATE ID TB_CS_CANDIDATE_TRACKS ID_EVENTBRICK ID_CANDIDATE ID_ZONE SIDE ID_MICROTRACK These tables are filled by CSScanDriver and are used to feed the general DB with the information to drive the scanning in the brick with emulsion DB group
Conclusions and outlook CSD measurements driven by LNGS scanning lab works smoothly It’s necessary to know OPERA geometry with a better accuracy both for brick position and track reconstruction Check mark accuracy Improve microtrack resolution Take under control emulsion distortions