MICE collaboration meeting Alain Blondel 26-29 June 2005 1 MICE collaboration meeting 12 at Frascati -- Introduction -- MICE: progress and challenges.

Slides:



Advertisements
Similar presentations
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
Advertisements

Request & in-kind supportEarmarkedFurther requests UK 13 M Protons, Hall, Tracker 10 M£ Yes 3M£ US 23 M$ RF Amplifiers ($500k) + R&D 0.3+(1.2 negot.)M$
MICE the Muon Ionization Cooling Experiment Emilio Radicioni, INFN EPS-HEP Aachen 2003.
Neutrino physics: experiments and infrastructure Anselmo Cervera Villanueva Université de Genève Orsay, 31/01/06.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
MUTAC Fermilab Alain Blondel 16 March Status of MICE MUTAC March 2006 at FERMILAB.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE collaboration meeting Alain Blondel June MICE challenges organization global funding situation.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
MICE Funding agency committee meeting Alain Blondel 1 MICE: challenges, organization, global funding situation.
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
MANX meeting 15 July 2008 Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment MICE in 2011.
CMPB Alain Blondel 14 April STATUS OF MICE.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
Scoping study p-ECFA Alain Blondel ISS-detectors Introduction: working group plans, organization and aims of the meeting.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
NO-VE MICE Alain Blondel, 4/12/03   MICE International Muon Ionization Cooling Experiment 1.Why MICE? 2. Measurement 3. Prototyping 4. MICE at RAL 5.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
1 pd, PAC 2005 MICE Muon Ionisation Cooling Experiment Paul Drumm Rutherford Appleton Laboratory 19 th May 2005.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
MICE: The International Muon Ionization Cooling Experiment Ulisse Bravar University of Oxford ICHEP ‘04 1 MICE: The International Muon Ionization Cooling.
Paul Soler University of Glasgow MICE as a Step towards Cool Muon Beams for Particle Physics MICE Celebration Event RAL, 25 June 2015.
MICE CM in New York Alain Blondel, June MICE COLLABORATION Columbia University June 2003 Action List (online) 1.Funding and some organization.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
MICE : the Muon Ionization Cooling Experiment M. Yoshida (Osaka Univ.) for the MICE Collaboration Osaka - Overview and Status -
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
MICE RF Workshop Alain Blondel MICE = critical R&D for neutrino factory and muon collider 1 neutrino factory: accelerate muons and store to produce.
MICE: The International Muon Ionisation Cooling Experiment MOPLT106 Abstract The provision of intense stored muon beams would allow the properties of neutrinos.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE CMPB Alain Blondel 1 Highlights on MICE.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
MICE RF review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
CHIPP Oct 2007Jean-Sébastien Graulich Status of MICE Jean-Sebastien Graulich, Univ. Genève o o Introduction o o Beam Line o o Technical Design o o PID.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
(one of the) Request from MPB
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
MICE VC Alain Blondel, April MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
Experimental Tests of Cooling: Expectations and Additional Needs
Presentation transcript:

MICE collaboration meeting Alain Blondel June MICE collaboration meeting 12 at Frascati -- Introduction -- MICE: progress and challenges

MICE collaboration meeting Alain Blondel June Why MICE? Based on Muon collider ideas and development (Palmer et al, 92->), the Neutrino Factory concept (Geer, 1998) resonated in 1998 with the final demonstration of Atmospheric Neutrino Oscillations by the SuperK Collaboration. International workshops: NUFACT 99 (Lyon, France) NUFACT 00 (Montery, California) NUFACT 01 (Tsukuba, Japan) NUFACT 02 (London, UK) NUFACT 03 (Columbia,NY,USA) NUFACT 04 (Osaka, Japan) NUFACT 05 (Frascati,Italy)  Neutrino Factory is the ultimate tool for study of Neutrino Oscillations -- unique source of high energy e --reach/sensitivity better by order(s) of magnitude wrt other techniques (e.g. super-beams) for    ** matter effects ** *** leptonic CP violation *** **** e   and   **** NB : leptonic CP violation is a key ingredient in the leading explanations for the mystery of the baryon-antibaryon asymmetry in our universe    e + e   _

MICE collaboration meeting Alain Blondel June ~NOvA +PD

MICE collaboration meeting Alain Blondel June encouraging signs from CERN… report from Scientific Policy Committee to council

MICE collaboration meeting Alain Blondel June Avenues identified as promising a) Superbeam alone + large detector(s) (e.g. T2HK, NOvA) a) SuperBeam + Beta-Beam + Megaton detector (SB+BB+MD) Fréjus b) Neutrino Factory (NuFact) + magnetic detector (40kton)+… The physics abilities of the neutrino factory are superior but….. « what is the realistic time scale? » (Hardware) cost estimate of a neutrino factory ~1B€ + detectors. This needs to be verifed and ascertained on a localized scenario (CERN, RAL…) and accounting. The cost of a (BB+SB+MD) is not very different Cost/physics performance/feasibility comparison needed An ambitious neutrino programme is a distinct possibility, but it must be well prepared to have a good proposal in time for the big decision period in 2010 (Funding window: )  ‘scoping study’

MICE collaboration meeting Alain Blondel June Detectors (NEW!) Water Cherenkov (1000kton) Magnetized Iron Calorimeter (50kton) Low Z scintillator (100 kton) Liquid Argon TPC (100 kton) Hybrid Emulsion (4 kton) Near detectors (and instrumentation) Physics compare performance of various options on equal footing of parameters and conventions and agreed standards of resolutions, simulation etc. identify tools needed to do so (e.g. Globes upgraded) propose « best values » of baselines, beam energies etc.. Accelerator: M.Zisman -- proton driver (energy, time structure and consequences) -- target and capture (chose target and capture system) -- phase rotation and cooling -- acceleration and storage evaluate economic interplays and risks include a measure of costing and safety assessment AB + Ken Long Peter Dornan MICE and the SCOPING STUDY…

MICE collaboration meeting Alain Blondel June Time scales: NUFACT05 (Sunday 26 June 2005) launch of scoping study September 2005: ISS report0 NUFACT06 (summer 2006) discussion of results of scoping study September 2006 ISS report 2007 full design study proposal 2010 conclusions of Design Study & CDR NB: This matches well the time scales set up at CERN

MICE collaboration meeting Alain Blondel June Particle physicist: Q: Can a Neutrino Factory be built? Accelerator physisicst: A: YES! (US Study II, CERN) but… it is expensive, and many ingredients have never been demonstrated!  R&D is needed. (est. 5yrs) to 1.ascertain performance 2.reduce costs among critical items: ***Target*** *** COOLING *** Cooling component development programme+ ‘blast test’: MUCOOL collabration (US-Japan-UK) *** Acceleration ***

MICE collaboration meeting Alain Blondel June IONIZATION COOLING principle: this will surely work..! reality (simplified) ….maybe… Difficulty: affordable prototype of cooling section only cools beam by 10%, while standard emittance measurements barely achieve this precision. Solution: measure the beam particle-by-particle A delicate technology and integration problem Need to build a realistic prototype and verify that it works (i.e. cools a beam) Difficulties lay in particular in  operating RF cavities in Mag. Field,  interface with SC magnets and LH2 absorbers What performance can one get? state-of-the-art particle physics instrumentation will test state-of-the-art accelerator technology.  RF Noise!!

MICE collaboration meeting Alain Blondel June  Incoming muon beam Variable Diffuser Beam PID TOF 0 Cherenkov TOF 1 Trackers 1 & 2 measurement of emittance in and out Liquid Hydrogen absorbers 1,2,3 Downstream particle ID: TOF 2 Cherenkov Calorimeter RF cavities 1RF cavities 2 Spectrometer solenoid 1 Matching coils 1&2 Focus coils 1 Spectrometer solenoid 2 Coupling Coils 1&2 Focus coils 2Focus coils 3 Matching coils 1&2 10% cooling of 200 MeV/c muons requires ~ 20 MV of RF single particle measurements => measurement precision can be as good as  out /  in ) = never done before either…

MICE collaboration meeting Alain Blondel June MHz RF cavity with beryllium windows Liquid-hydrogen absorbers Scintillating-fiber tracker Muon Ionization Cooling Experiment Status: Approved at RAL(UK) First beam: Funded in: UK,CH,JP,NL,US Requests: Be,CH,It,JP,US Single-  beam ~200 MeV/c 4T spectrometer I 4T spectrometer II TOF Cooling cell (~10%)  =5-45cm, liquid H 2, RF Final PID: TOF Cherenkov Calorimeter Aims: demonstrate feasibility and performance of a section of cooling channel Main challenges: RF in magnetic field! meas. of emittance Safety issues Some prototyping:

MICE collaboration meeting Alain Blondel June Some challenges of MICE: 1. Operate RF cavities of relatively low frequency (200 MHz) at high gradient (16 MV/m) in highly inhomogeneous magnetic fields (1-3 T) dark currents (can heat up LH 2 ), breakdowns 2. Hydrogen safety (substantial amounts of LH 2 in vicinity of RF cavities) 3. Emittance measurement to relative precision of in environment of RF bkg requires low mass and precise tracker low multiple scattering redundancy to fight dark current induced background excellent immunity to RF noise require complete set of PID detectors (INFN) And… 4. Obtaining funding for R&D towards a facility that is not (yet) in the plans of a major lab

MICE collaboration meeting Alain Blondel June NUFACT NUFACT01 7:30 am Sept November 2001 January 2002 June 2002 January 2003 July 2003 October 2003 December 2003 June December 2004 March 2005 Re-activated the recognized need for muon cooling expt Workshops on Muon Cooling Experiment (CERN, Chicago, London) Steering group formed Workshop at CERN where final experiment took shape. Letter of Intent (LOI) submitted to PSI and RAL PSI cannot host experiment, will collaborate (beam solenoid) RAL IPRP Review Panel encouraged submission of a proposal Proposal submitted Recommendation by International Peer Review Panel ‘Scientific approval’ letter by RAL CEO JohnWood Project Manager appointed (P. Drumm, RAL) RAL CM: collaboration charter approved Gateway 1 review Gateway 1 passed on ‘amber’ Gateway 2/3 passed 10 green + 4 amber (MICE PHASE I) Release of funding approved by PPARC and CCLRC 9.7 M£ MICE is an international effort from the start.

MICE collaboration meeting Alain Blondel June at this point MICE (PhaseI) is an approved and funded project in 5 countries -- UK: 9.7M£ -- USA: 1.2 M$ approved for next three years (NSF+DOE) ( +RF source + MRI proposal -- some success) + propose to build solenoid magnet within MC budget (+ longer term plan for Coupling coil) (Zisman at CB) -- Japan: US-Japan ~$100k/yr, UK-Japan (travel funds) (+ 500k$ requested) -- Switzerland: PSI solenoid + Uni-Geneva-NSwissF (80KCHF/yr)+ 1 PDA+1PhDS -- Netherlands: Mag probes (in production!) + 1 PhDS + Proposal submitted in Italy (TOF, Calorimeter) and Belgium (Cherenkov) MICE is CERN recognized experiment RE11.

MICE collaboration meeting Alain Blondel June  - STEP I: April 2007 STEP II: October 2007 STEP III: 2008 STEP IV: 2008 STEP V 2008? STEP VI 2009? implementation in steps physics-based: understanding of systematics all configurations successfully matched optically PHASE I PHASE II

MICE collaboration meeting Alain Blondel June MICE is being designed simulated reviewed MOU’ed dug prototyped and built!

MICE collaboration meeting Alain Blondel June SIMULATION -- beam line : Turtle (Kevin Tilley) + G4beamline (Tom Roberts) match input beam (quads and dipoles) to MICE (solenoid) 600 ‘good muons’ per ISIS spill should be achievable  emittance measurement in 1 hr (stat) (work to do for diffuser, variety of optics, etc…) -- optics (Bob Plamer, Ulisse Bravar) ICOOL all steps of MICE have been optically matched (but not to the beam) both in flip mode and solenoid mode (proposed by Migliorati et al) -- physics simulation (G4MICE, Y. Torun et al)

MICE collaboration meeting Alain Blondel June SIMULATION and software. RF emission of X-rays (Rikard Sandstrom) less than difference between true and reconstructed Sci-fi simulation of the measurement includes noise dead channels etc.. (Malcolm Ellis et al) Left G4MICE Right ICOOL t E G4MICE-ICOOL comparison Chris Rogers good to 20 ps and a few 100 keV ‘Students are taking over the project’ ‘Simple things should be easy and complicated things should be possible’ Yagmur Torun EMCAL(Rome, Frascati)

MICE collaboration meeting Alain Blondel June requirements on spectrometer system: 1a reject incoming e, p,  TOF 0, TOF1) 1.b reject outgoing e => TOF2, Cerenkov + Calorimeter 2. measure x,y,Px, Py E (tracker) and t (TOF counters) to build 6D emittance particle by particle 3. resolution better than 10% of width at equilibrium emittance   meas =   true +   res =   true [ 1+ (  res /  true )2 ] (  correction less than 1%) 4. robust against noise from RF cavities  Sci-Fi tracker was validated with calculations based on G4MICE -- experimental input from prototype (dead channels, efficiency, resolution) -- calculated spectrum and time structure of RF field emission based on LabG 800MHz -- still will need to be scrupulous about multiple scattering in tracker  stepIII Sci-fi prototype II presently assembled  test at KEK in magnetic field (october)

MICE collaboration meeting Alain Blondel June

MICE collaboration meeting Alain Blondel June Now same exercize needs to be done for TOF requires measured 50ps resolution  double layer scintillator construction of TOF0 prototype this year (Milano,Pavia, Padova, Geneva) funding available (GVA), proposal submitted (Italy) bias on longitudinal emittance ratio 1% 50ps from tracker energy resolution TOF0 (R4998 Hamamatsu with Bicron scintillator)

MICE collaboration meeting Alain Blondel June DAQ, controls and monitoring working group aims understand what instrumentation is needed and what data are needed at which frequency (per spill, per muon, independently) in order to perform comparison of data with simulation at the level of started to meet here at Frascati, will have dedicated workshop (so far: Bross+Yoshida+Graulich+Radicioni+Drumm  will need some accelerator physicists!)

MICE collaboration meeting Alain Blondel June RF module MICE is foresen with 8 RF cavities Closed with curved Be windows (increase gradient / MW RF power) 201 MHz First cavity prototyped (MUCOOL) Completion in April 2005 RF power sources : Will be assembled from equipement refurbished from Berkeley, Los Alamos, CERN, RAL. Needed 8 MW peak power  23 MV acceleration Operation at LN2 foreseen to increase Volts / MW

MICE collaboration meeting Alain Blondel June Initial inspections of 4616 circuits LBL equipment arrived Jan 05 Initial inspections 4616 circuits look ok ! RF circuits arrived from LBNL to Daresbury Lab. MICE test area at Daresbury Moss

MICE collaboration meeting Alain Blondel June MICE Muon Beam Design integration: Beam line and shielding, cryogenics MICE: Support systems, RF, services, …

MICE collaboration meeting Alain Blondel June Paul Drumm MICE Project Manager Prof. John Wood RAL CEO MOU for PSI solenoid counter-signed

MICE collaboration meeting Alain Blondel June Hydrogen Safety Safety Review process under way Internal review organized in Berkeley in Dec Reviewers: D. Allspach (FNAL), G. Benincasa (CERN), M. Seely (Jlab), L. Starritt (NASA), J. Weisend (SLAC), J. Wells (RAL) Evacuated buffer tank needed? NO Burst valves and relief valves? YES Separate vents for vacuum and hydrogen? YES Detailed answers issued. Proceeding now to full safety revue (toward fall 2005) to be set up at this meeting

MICE collaboration meeting Alain Blondel June Design and safety working group nominated to ensure that MICE is designed and built according to appropriate and safe engineering and according to RAL safety rules. This will happen with 3 successive milestones internal audit external review (production readiness) external review (OK to operate) production reviews pertinent to PHASE I will have to be passed ***before end 2005*** …! Document Review Review FINAL Document Audit Operate RAL Review RAL

MICE collaboration meeting Alain Blondel June Time Line It will be timely (…and not too soon!) to have by then a full design for a cost-optimized neutrino factory, with no questions about practical feasibility of ionization cooling If all goes well and funding is adequate, Muon Ionization cooling will have been demonstrated and measured precisely by 2009 At that time: MINOS and CNGS will have started and measured  m 13 2 more precisely J-Parc-SK (and reactor expt?) will be about to start (  13 measurement ) LHC will be starting as well

MICE collaboration meeting Alain Blondel June MICE is getting REAL! First beam 1st April 2007 **** 365* = 642 days to data taking !!!

MICE collaboration meeting Alain Blondel June AIMS of the meeting: review ongoing activities design and safety reviews: where do we stand? are we on track to be ready to take data in April 2007? design of diffuser, impact on running strategy? see formation of DAQ Controls and Monitoring group continue to broaden simulation effort  analysis forum creation of editorial board foreseen in MICE constitution NB: we had 6 contributions to PAC05 NB we strongly encourage everyone to document their work within the framework of MICE with MICE Notes!

MICE collaboration meeting Alain Blondel June Editorial Board This body approves publications from the Collaboration. Two types of publications are foreseen. Collaboration Publications These publications are issued as ‘MICE Collaboration’ publications and it is expected that all active members of the collaboration will sign. All analysis results from the experimental data are expected to be in this category as are descriptions of the experiment as a whole and its performance. These must be approved by the Editorial Board. Limited Publications Publications by a limited number of members of the collaboration concerning e.g. the construction and performance of specific subcomponents of the experiment. They are not issued as ‘MICE Collaboration’ publications, however it is recommended that these papers are also submitted to the Editorial Board for approval so that the management are aware of them and can advise of any possible conflicts with other members which may occur.