Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.

Slides:



Advertisements
Similar presentations
ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
The Control System for the ATLAS Pixel Detector
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
LHC SPS PS. 46 m 22 m A Toroidal LHC ApparatuS - ATLAS As large as the CERN main bulding.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
The Detector Control System for the ATLAS SemiConductor Tracker
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Shulamit Moed Vertex 2004, Como, September 20041page EndCap Module Production of the ATLAS semiconductor tracker (SCT) ATLAS SCT layout and specifications.
ATLAS Liquid Argon Calorimeters Geneva Group Alain BLONDEL Arno STRAESSNER Ahmed ABDELALIM Daniel LA MARRA Eric PERRIN Gabriel PELLERITI Gilbert VIOLLAT.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
The ATLAS Pixel Detector - Running Experience – Markus Keil – University of Geneva on behalf of the ATLAS Collaboration Vertex 2009 Putten, Netherlands,
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
TRT Commissioning Vassilios I. Vassilakopoulos Hampton University Hampton University (for the ATLAS TRT Collaboration)
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
Overview and Status of the ATLAS Pixel Detector Claudia Gemme, CERN/INFN-Genova on behalf of the ATLAS Pixel Community 10th ICATPP Conference, Como, Oct.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai, Kazuhiko Hara (Univ. of.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
23/01/2007ID Software Workshop1 SCT performance from the SR1 endcap data Satoru Mima Okayama University ID Software Meeting 23-Jan Noise Study -
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Test Beam Results on the ATLAS Electromagnetic Calorimeters Lucia Di Ciaccio – LAPP Annecy (on behalf of the ATLAS LAr Group) OUTLINE Description of the.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ at SR1 HEP Cosmics setup Running modes Problems Future.
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
Progress in the Development of Evaporative Cooling Systems for the ATLAS Inner Silicon Tracker G. Hallewell 1 and V. Vacek 2 1 Centre de Physique des Particules.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
`` ATLAS inner detector JV Els KoffemanAtlas - Inner Detector1 Tracking in solenoid 2 Tesla field – 3 pixel layers with 50 um x 400 um cells – 4.
Short summary of ATLAS week. Really a lot has happened since the last ATLAS Plenary in Paris! Giant steps in the detector hardware construction, assembly,
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Micromegas Vertex Tracker Status Report
Overview and status of the ATLAS Pixel Detector Attilio Andreazza Università di Milano and I.N.F.N. for the ATLAS Pixel Collaboration Layout of the ATLAS.
DAQ for ATLAS SCT macro-assembly
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
Integration and alignment of ATLAS SCT
9/20/2018 CHIPP Meeting 10 September 2008 Slides for use by Sven for ATLAS talk DPNC Geneva 10 September 2008.
Pierluigi Paolucci - I.N.F.N. Naples
RPC Detector Control System
Operational Experience with the ATLAS Pixel Detector at the LHC
TEC assembly and commissioning at Lyon
RPC Detector Control System
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Atlas SemiConductor Tracker Andrée Robichaud-Véronneau

Journée de réflexion DPNC - Cartigny 2 A Toroidal Lhc ApparatuS The Atlas Detector is divided into several subdetectors Out of them, 2 systems are using silicon sensors technologies: SCT Pixels

One central barrel with 4 layers of rectangular modules 2 end-caps containing 9 disks Each disk assembled with max. 3 concentric rows of wedge-shaped modules (Made in Geneva)‏ Andrée Robichaud-VéronneauJournée de réflexion DPNC - Cartigny 3 The SemiConductor Tracker  61 m 2 of Si resulting in 6.2 million readout channels  4088 double-sided modules, coverage  2.5  Modules using optical communication (CLK/COM)‏  Operation temperature : -7 o C (on the Si sensor) using C 3 F 8  Radiation hardness : 2x MeV neutron equivalent ·cm -2 (10 years LHC)‏

Journée de réflexion DPNC - Cartigny 4 From SCT to ID Different assembly phases for the SCT  Assembly of individual barrels in Oxford  Reception testing of the barrels at CERN  4-barrel assembly  EC assembly in NIKHEF and Liverpool  ID Barrel integration (SCT->TRT)‏  EC reception at CERN  ID Barrel Combined Testing (Cosmics)‏  ID Barrel Integration in ATLAS  ID EC integration (A and C)‏  ID EC C Combined Testing (Cosmics)‏  ID EC integration in ATLAS Andrée Robichaud-Véronneau

5 Reception testing Single barrel tests after reception at CERN Dec 2004-July 2005 Were tested: Cooling uniformity +stability DAQ & DCS operations Noise performance Signal response Results: Module condition unchanged compared to module production Andrée Robichaud-VéronneauJournée de réflexion DPNC - Cartigny

6 Barrel Cosmics 450 k events taken from March to June 2006 ~70 % good tracks Run at nominal threshold (1 fC)‏ Allowed for testing of: Online monitoring Event Display Offline reconstruction Alignment Andrée Robichaud-VéronneauJournée de réflexion DPNC - Cartigny

7 In parallel to the detector assembly, the DCS was developed to provide safe operation of the SCT. It includes the control and monitoring of: Power supplies Environmental conditions (Temp, Humi)‏ Cooling A hardware interlock on cooling temperature adds an extra protection to the software controls. The ID combined test were a good opportunity to test these systems and get experience for the final installation. Detector Control System Andrée Robichaud-VéronneauJournée de réflexion DPNC - Cartigny

8 EC C Cosmics ~167 k events taken in December 2006 Scintillators placed to catch horizontal tracks No dependence on trigger rate in physics mode detected No influence from TRT activities Andrée Robichaud-VéronneauJournée de réflexion DPNC - Cartigny

9 ID integration in ATLAS ID Barrel lowered in the Atlas pit in Aug. '06 Cabling and testing was completed Feb. '07 EC A was lowered May 25 th EC C was lowered June 18 th The SCT Barrel is now integrated with Atlas central DAQ & DCS SCT ECs are currently being cabled and currently being tested to participate in Atlas commissioning this fall Andrée Robichaud-VéronneauJournée de réflexion DPNC - Cartigny

10 Challenges ahead Andrée Robichaud-VéronneauJournée de réflexion DPNC - Cartigny Evaporative cooling heaters Used to boil off remaining liquid in coolant between detector and cooling plant Main source of unreliability of the cooling system Repositioned outside cryostat Currently being reworked Will be re-installed temporarily for cosmics running Module resistance Some modules show a high backplane resistance First on EC C, but also on EC A and Barrel (worst)‏ Might be linked with presence of humidity (DCS)‏ Still under investigation (forward biasing solution)‏

11 Next steps Andrée Robichaud-VéronneauJournée de réflexion DPNC - Cartigny What will keep us busy for the coming months: Cabling and testing the SCT ECs Resolving the heaters issue Run the detector with cooling inside Atlas (M5 in Oct-Nov 07)‏ Analyse the first SCT data (alignment, performance)‏ Manpower is needed for these important steps!

12 Conclusion and Outlook The SCT is integrated in Atlas Barrel has already been tested for noise occupancy Full scale commissioning in 3-4 months The integration tests were a great success in many aspects ~99.7 % of barrel channels functional (1 module lost - HV)‏ Cosmics data taken on surface Still a lot of work to be done! Continue development of Barrel DAQ & DCS for the fall Connect and Test both End-Caps Integrate the End-Caps with Central Atlas Work ongoing on the evaporative cooling heaters Look into the first data to understand e/  performance => Looking forward for the first LHC data! Andrée Robichaud-VéronneauJournée de réflexion DPNC - Cartigny