IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March 2010 o IBL interim-MoU Annexes Pixel Extended Institution Board CERN, March 1 st, 2010 NCP.

Slides:



Advertisements
Similar presentations
3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:
Advertisements

IBL G. Darbo – INFN / Genova Roma, 5 September 2012 o IBL Stato e Richieste 2013 Riunione ATLAS / INFN Referee, 5 September 2012 G. Darbo – INFN.
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Agenda - meeting of the GERDA Collaboration Board November 9, Approval of Agenda 2. Approval of minutes of previous Collab Board meeting 3. Update.
IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova.
Towards a TDR for the IBL G. Darbo - INFN / Genova AW, 24 February 2009 o Towards a TDR for the IBL ATLAS Upgrade Week CERN, 24 February 2009 Session:
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
® © 2009 Open Geospatial Consortium, Inc. Starting an Interoperability Experiment David Arctur, OGC Director, Interoperability Programs December 8, 2009.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
IBL MoU G. Darbo – INFN / Genova 24 April 2010 o IBL MoU ATLAS Upgrade Week DESY, April 24 th 2010 M. Nordberg, M. Nessi, C. Gößling, H. Pernegger Presented.
SPSC Questions to the 2014 NA62 Status Report 1 Beam: which is the beam structure expected in October? Which is the intensity you can reasonably expect?
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
IBL MoU G. Darbo – INFN / Genova 17 April 2010 o IBL MoU Contribution prepared for Marzio’s talk at April RRB G. Darbo - INFN / Genova.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
1 Stave 0 and QA plan UniGe-UniBe meeting, February 10 th 2012 D. Ferrère, A. La Rossa, Y Takubo.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
Jorgen Christiansen, CERN PH-ESE 1.  Spokes persons and Institute chair elected ◦ SP’s: ATLAS: Maurice Garcia-Sciveres, LBNL CMS: Jorgen Christiansen,
July 17, 2013 CERN T. Flick University of Wuppertal.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
October RRB G. Darbo & H. Pernegger RRB – October 2010 o October RRB Slides for Marzio’s RRB talk CERN, October, 11 th 2010 G. Darbo & H. Pernegger.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July 2009 o IBL kick off meeting summary and issues ATLAS Upgrade Project Office.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
ATLAS Upgrade Plans ATLAS Hardware – Challenges and Opportunities Norwegian CERN “Town Meeting” Bergen
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
IBL TDR G. Darbo / INFN Genova ATLAS CB – October 2010 o TDR of Insertable B-layer ATLAS CB, October 8 th 2010 G. Darbo / INFN - Genova Indico agenda page:
Planning 2009 JRA1 Meeting, Strasbourg March 4 th 2009 Ingrid-Maria Gregor DESY.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
20/07/ Marzio Nessi Agenda For NIKHEF plans for the ATLAS Upgrade. NIKHEF ATLAS upgrade plans and organization DL/NH Potential.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Organization and Goals for the Workshop
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Concluding remarks E. Migneco
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Status of ATLAS Resources
Communications Share Point Collaborative WS:
Update on ATLAS insertable B-layer
ANTARES Budget - Common Fund and new MoU
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March 2010 o IBL interim-MoU Annexes Pixel Extended Institution Board CERN, March 1 st, 2010 NCP Meeting – 21/04/2010 Prepared by: G. Darbo - INFN / Genova Indico agenda pages (PEIB & NCP): nfId=75714http://indico.cern.ch/conferenceOtherViews.py?view=standard&co nfId=75714

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March IBL Project IBL project and schedule in dept presented in the last IBL General Meeting with a summary at the last week ATLAS General Meeting. References: IBL General Meeting: February Talk of H. IBL General Meeting 11/2/ technical project status and schedule 1&materialId=slides&confId= &materialId=slides&confId=73688 Talks of G. ATLAS Week 26/2/ summary project status

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March ANNEX 1 Who does what

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 1 Project divide into 11 items. To funding Agency money matrix shows only 5 Systems. (less detail) IBL MoU Systems Grouping used in the Annex 4 table IBL MoU Systems Grouping used in the Annex 4 table MoU Items Grouping used in the Annex 1.x tables MoU Items Grouping used in the Annex 1.x tables

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 1.1: Sensor (1/4) Sensor technology selected after prototyping with FE-I4 Prototypes with Planar, 3D and Diamond. Once technology is selected the interim MoU will become the final MoU. An Institute can leave the IBL project before signing the final MoU if is participation is “Sensor Technology Dependent”. The Technology Option column in Annex 4 will cover the related and additional costs implied by the technology chosen. In the prototyping cost only part of the real cost are covered: Sensor prototype cost largely shared with sLHC R&D. Cost in the IBL are for “extra wafers” and bump-bonding with FE-I4.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A1.1: Sensors (2/4) The quoted cost for production should cover Planar sensor or “low profile 3D”. More expensive solutions in the 3D, Diamond and/or thinner FE-I4 modules are maintained in the Technology Option until final decision.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A1.1: Sensors (3/4) Only work responsibility for prototyping in the iMoU.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A1.1: Sensors (4/4) Cost sharing for prototyping follows the “work responsibility” on the sensor technology. Cost sharing for production selected to minimize “technology dependence” on funding source (see next slide).

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Sensor Production Contribution

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 1.2: FE-I4 FE-I4 assumes two engineering runs and final production of 3 batch of 24 wafers of the second version. Work and cost includes wafer testing. Including hardware (USBpix) and/or outsourcing for testing.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.2: FE-I4 (2/4) In the item are: FE-I4 version 1 (engineering run) Fe-I4 version 2 (engineering run) Hardware for single mo

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.2: FE-I4 (3/4)

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.2: FE-I4 (4/4) Cost sharing is different from version 1 and version 2 due to expected work participation of Geneva in the version 2.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 1.3: Bump-Bonding A 1.3 Summary: Deliverables: Bump-bonding and QC for IBL Prototype: Vendor qualification.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.3: Bump Bonding (2/4) The cost was evaluated with rather conservative (40%) yield. Yield is probably better, but more advanced techniques would rise the costs.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.3: Bump Bonding (3/4) Notes: In the prototype phase the cost of FE-I4 wafer thinning and bump- deposition are in MoU item #3. The sensor wafer processing (UBM/bump-deposition) and flip chip is in MoU item #1. Qualify the two vendors used by ATLAS Pixel - baseline AgSn - Technology backup Indium. KEK develops bump-bonding with Hamamatsu (possible option if the first two fail), participation to common procurement.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.3: Bump Bonding (4/4) Prototype: INFN and BMBF to qualify AsSn and In vendors, with Barcelona contributing with dummy sensors.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 1.4: Bare Stave & Cooling Pipe A 1.4 Summary: Deliverables: Bare stave with cooling pipe Cooling pipe to PP1 Package divided in: Prototype and production Baseline: CO 2 cooling and Titanium pipe based on Reviewers’ recommendations.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.4: Bare Stave & Cooling Pipe (2/3)

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Substantial prototype work already made and paid: Almost 50% of the cost of the stave prototype have been contributed by: BMBF, IN2P3 and INFN. Production and QC site need agreement. A 1.4: Bare Stave & Cooling Pipe (3/3)

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 1.5: Module & Stave Loading A 1.5 Summary Deliverables: Flex hybrid (stave/module) design, production QC Electrical internal services (pipe is in item #4) Flex Module production & QC Loading of Modules on stave and QC PP1 services (both electrical and cooling)

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.5: Module & Stave Loading (2/3) EoS card is equivalent to PP0 of the Pixels. No active component foreseen on it. Stave 0 is a multi module system with prototype parts (FE-I4.v1, stave, flex).

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.5: Module & Stave Loading (3/3) Clarification: Flex Module is the module dressed with parts ready for loading on stave.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 1.6: R/O Chain A 1.6 Summary Deliverables: Opto-board & boxes Opto fibers BOC/ROD Opto plugins TDAQ parts (TIM, ROD crates, SBC …)

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.6: R/O Chain (2/4)

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.6: R/O Chain (3/4) ROD baseline is a “modernized” BOC/ROD using VME. Deliverables and cost sharing follows this line.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.6: R/O Chain (4/4) RX-plugin assigned to Ohio (upgrade for the Pixel). DAQ hardware (187 kCH) proposed as in kind contribution from INFN Commissioning of the R/O chain is with the Institutes sharing the Work Responsibilities. BOC and ROD follow the philosophy of a modernized VME design TDAQ off-shelf hardware are in-kind from M&O-A.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 1.7: Power Chain A 1.7 Summary Deliverables: PP2 regulators and boxes HV & LV PS All cables to PP1 HV-PP4/LV-PP4 DCS and Interlock

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.7: Power Chain (2/4) Cables and power supplies on M&O-A.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.7: Power Chain (3/4) LV and DCS cables are M&O-A in-kind HV and LV PS are M&O-A in-kind HV Cables only work covered, but stay on M&O-A

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.7: Power Chain (4/4)

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 1.8: Integration & System Test A 1.7 Summary: Deliverables: Integration toolings System Test infrastructure (cooling included)

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.8: Integration & System Test (2/4)

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Note: This MoU item will see major involvement of CERN and Geneva with responsibilities and full contribution to the cost. More precise sharing of responsibilities is in discussion and this will reflect an update of how “Work Responsibilities” is phrased. Several institutes will contribute with work in both System Test and Integration. A 1.8: Integration & System Test (3/4)

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Note: CERN and Geneva are the two contributors in cost to this MoU item. Norway is interested in "System Test”. Expect to be able to cover about a third (i.e. 70kCHF), assuming only half the amount is to be spent during current funding period, which runs till the end of Norway contribution put into “Technology Options” Bern - Expression of interest in the Integration and System Test A 1.8: Integration & System Test (4/4)

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 1.9: Cooling Plant & Services Item covered by M&O-A Interest from some institutes (mainly if CO2) Nikhef and SLAC

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 1.10: Beam Pipe & Interfaces A 1.4 Summary: Deliverables: Beam-pipe (M&O-A) Tooling for installation & mockup Global supports for IBL and services.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.10: Beam Pipe & Interfaces (2/3)

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.10: Beam Pipe & Interfaces (2/3)

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March A 1.11: Installation A 1.4 Summary: Deliverables: Most of the cost is manpower, consultancy for ALARA, etc.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March ANNEX 2 The Project Organization

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 2: IBL Organization IBL MB decisions and IB decisions IBL PL and IBL TC responsibilities Participation of the Institutes to the IBL: Pixel Institutes, new Institutes and participation through the Project Office. Reporting of IBL PL and TC Selection of IBL PL and TC (ATLAS rules), term of mandate. Institutes voting for the IBL PL Management Board The IBL Management Board (MB) controls the execution of the project. The IBL MB meets every two weeks in phone meeting and is chaired by the IBL PL and TC. Meetings have closed participation to MB members and speakers could be invited to report on specific issues on request of the IBL MB. The IBL MB uses indico and SharePoint to distribute material for discussion. Minutes circulated to the IBL collaboration and Issue Tracking is the way the MB works. Working Groups The construction activities of the whole IBL project are divided into four working groups. Each working group has two coordinators. Sharing of responsibilities between the two coordinators in each working group is defined on the base on a mandate document. The Working Group coordinators steer the activities they are concerned in periodic meetings that are largely in the form of phone conference.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Institute Board The Institutions taking part in the project, in a direct way (as opposed through the UPO), with money and manpower, are part of the Institute Board (IB). The IB is an extension of the Pixel IB and usually meets after the normal Pixel IB with the additional Institutions members in the IBL. Major technology choices affecting the overall performance of ATLAS have to be brought forward to the collaboration as a whole for decision in the Collaboration Board. Composition of the IB is ad-iterim until the IBL MoU is finalised. IBL General Meetings These meetings are held three or four times a year and constitutes the forum where discussions on any aspect of the Pixel project should take place. Collaborative Tools & EDMS To transmit the information in the IBL project is used a “Share Point” Collaborative Workspace. Share Point is used during the phase of preparation of the documents in their final form. The approved document are referenced and posted in the EDMS structure. Workgroup meetings and IBL General Meeting are on indico. To transmit the information, a few open subscription (to ATLAS members) mailing lists.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March ANNEX 3 The Institutes & Institutions

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 3: Institutes/Institutions

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March ANNEX 4 The Money Matrix

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 4 Note: the numbers in the table "are not final, nor are the suggested financial contributions yet firm, but are meant for a common overall discussion.” Technology options refer to supplementary costs that are sensor technology specific and will be known before the definite MoU takes effect. So far, France, Italy and US have requested their shares to be moved from M&O to Project part.

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 4 (extended)

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March ANNEX 5 Payment Profile

IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March Annex 5: Payment Profile The payment profile corresponds to readiness for installation by end of 2014 The main cost in 2010 are for prototyping: FE-I4, sensor, stave.