Project Gulfstream Curtis Christiansen Jordan Hodge Jordan Lyford Troy Mills Wilson Schreiber Project Gulfstream Curtis Christiansen Jordan Hodge Jordan.

Slides:



Advertisements
Similar presentations
Advanced Energy Vehicle
Advertisements

Whole Systems, Whole Students Eric Brewer UC Berkeley, Google CCC Council November 2, 2012.
Initial Design Review Team “Chip” Tim Quinn Henry Mossell Desiree Cerretani.
Cory Fulkerson (Project Manager) - Mechanical Engineer John Graham - Computer Engineer Clayton Hooks - Electrical Engineer O’Raphael Okoro - Electrical.
Guitar Neck Duplicator By Eric Hall. Problem To design a device that fabricates a rough (not sanded) guitar neck out of a stock piece of wood by following.
Automatic Dog Walker Paul Johnson and André St. Denis 9/12/00.
Agile Robotics Site Visit Mitch Leammukda 8/8/2008 Agile Robotics Platform Integration Mitch Leammukda, Troy Jones, Lenny Paritsky, Rob Truax, Mofe Uku,
UltraSonic Orchard fertilizer Dispensing Automaton Erik Mueller & Patrick Thurston.
P11216 – Wandering Ambassador (Part VI) Customer: Stan Rickel Nick Leathe – Mechanical Engineer Anna Gilgur – Mechanical Engineer Rui Zhou – Electrical.
Background Current design is not portable Uses a very large truck with approximately 30 tons of pushing power For every two feet pushed a new section.
Bakers DJ By Troy Mills ELM-Final Project. Contents Problem Statement Background Solution Project Design Parameters System Diagram State Machine.
UltraSonic Orchard fertilizer Dispensing Automaton Erik Mueller & Patrick Thurston.
Justin Heyer Ted Keppner. Build an autonomous barn floor scrapper Needs to be able to be adapted to multiple barns Solutions to clean either slotted/solid.
Team Gary Dan Farley Tyson Rogstad Erik Flum Rob Koch Gary Zigmann.
The Combination Station Status Report Alex Rust & Nate Lamie.
Team Hybrid  Daniel Farley  John Hoyt  Sean Frost Hoyt.
Group Members JimyLeah Castro - Data Analysis Jeremy Chan - Hardware Architecture Eric Lee - Software Development Sae Yoon - Signal Analysis.
CSE Design Lab – Milestone 2 James Hopkins Dave Festa Dennis O’Flaherty Karl Schwirz.
1 IET 385 Industrial Design AGENDA Introductions Course Syllabus Course Schedule Terminology Overview of the Industrial Design process.
Mr. Mixer (Automatic Mixing Machine) Final Presentation Alex Rust & Nate Lamie.
Team MASTers™ Craig Lalumiere David Cobler Michael White.
Team Hybrid  Daniel Farley  John Hoyt  Sean Frost Hoyt.
Team Hybrid  Daniel Farley  John Hoyt  Sean Frost Hoyt.
Team Gary Dan Farley Tyson Rogstad Erik Flum Rob Koch Gary Zigmann.
Field Navigational GPS Robot Final Presentation & Review Chris Foley, Kris Horn, Richard Neil Pittman, Michael Willis.
Team Gantry Tyson Rogstad Erik Flum Gary Zigmann.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Guitar Neck Duplicator By Eric Hall. Background  Difficult to Replicate  Time Consuming  Generally done by hand.
Happy Home Helper Final Status Presentation Jeremy Searle Apr 20, 2004.
In Due Time Kyle Baitz, Jonathan Pierson, Travis Haley.
10/18/2006ELM 4071 Miniproject Team Gary Dan Farley Tyson Rogstad Erik Flum Rob Koch Gary Zigmann Rob.
Mix Master Status Report Alex Rust & Nate Lamie. 11/19/02Alex Rust & Nate Lamie Background Consumers enjoy elaborately mixed beverages but do not have.
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
Team Gary Dan Farley Tyson Rogstad Erik Flum Rob Koch Gary Zigmann.
 Rollin Bicskei  Eric Bornemann  Jason Wells  Ryan Bidlack  ELM 4701 October 2008 Toromatic Team Brown & Associates:
Team Gantry Tyson Rogstad Erik Flum Gary Zigmann.
Detailed Design Review of Magnetic Field Centering Device Project # P08028 “Develop a Design and Methodology to Ensure the Concentricity between the Magnetic.
Project Gulfstream Curtis Christiansen Jordan Hodge Jordan Lyford Troy Mills Wilson Schreiber Project Gulfstream Curtis Christiansen Jordan Hodge Jordan.
Team Hybrid Hoyt MemberSubsystem Sean Frost Electric motor, motor controller, charge controller, charge accumulators Dan Farley Hydraulics system: Pumps,
Dec09-11 Embedded Systems Design Though Curriculum Jacqueline Bannister Luke Harvey Jacob Holen Jordan Petersen.
Lec#14.  Disable person needs equipment with the degree of impairment and desired degree of independence in area of personal care, mobility, leisure,
Matthew Davison Bobby Harkreader David Mackey Dhivya Padmanbhan Artificial Intelliscents Robotic Chemotaxis.
Robotic Backhoe with Haptic Display Design Overview
RoboVac a UTC Corp. Power Generation Engineer Juan Gamarra
PropaGator Oral Report 2 Andrew Wegener IMDL 2012.
PO Box 1508, Vancouver, WA (360) THE COMMERCIAL & INDUSTRIAL BILLING SOLUTION.
Autonomous Surface Navigation Platform Michael Baxter Angel Berrocal Brandon Groff.
ME 4182 Mid Term Presentation Team Moondogs October 2, 2006 From left: Rahul Kirtikar, Chris Sampson, Chris Culver, Mike Widerquist, Elias Krauklis
Wearable Sensors Final Presentation Problem Background Inferred Transmission (short range) Bulky Design, hard to wear 20 Samples per second.
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
THE ULTIMATE TAILGATE SENIOR DESIGN: P10811 High Level Design Meets or exceeds functions and capacities of stock tailgate Provide a flat work surface for.
Team Members Cara Dunn Farshad Fahimi Sujan Bhaheetharan Nipun Yamdagni UW/VA Hospitals – Geriatric psychiatrist/Sleep specialist Assistant Professor,
Company for Urban Innovative Transport (CUIT) 19/12/2007 Request for proposal.
Grassinator1300 Senior Design Mid-Semester Design Presentation 2014.
Problem Statement Wasted time and effort in retrieving pucks after shooting them into the hockey net. Other sports like basketball have retrieval systems.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 10, 2008.
UNDERWATER SALVAGE ROBOT PROPOSAL HydroBotics Inc. O CTOBER Luke Karr Erin Fogle Dan Sowa Corbin Kruczek Kyle Zimmerman Will Huddleston Dr. Firas.
Marco Pagani Product Manager. Agenda The system: main components Features References.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Software Myths Software is easy to change
Chair-Mounted Computer Workstation
A.I. and the Automation of Oil Clean Up
Lab Safety Policies Don’t stand on lab chairs
Problem Definition Review
ECE 477 Final Presentation Team 10  Spring 2008
“Breadboarding” a Simple FM Transmitter
TG-1101 Engineering Design I Introduction to “Total Design” and “Systems Engineering Design Process” (Week 2)
Water-saving Shower Faucet
Intelligent HVAC Control
Presentation transcript:

Project Gulfstream Curtis Christiansen Jordan Hodge Jordan Lyford Troy Mills Wilson Schreiber Project Gulfstream Curtis Christiansen Jordan Hodge Jordan Lyford Troy Mills Wilson Schreiber

Agenda Background Problem Statement Solution Statement System Overview Design o Mechanical o Electrical o Software Assignments Schedule Budget

Background Many barns that contain livestock require some method to contain the animal waste and make it easy to clean Wood shavings are typically spread to make cleanup easier

Problem Statement Wood shavings may make cleanup easier, but it is still tedious. The shavings still need to be collected and removed.

Solution Statement Our solution consists of Autonomously driven vehicle with a vacuum source to collect the material Spiraling navigation Material collection storage area, with an auger disposal Docking station for disposal (HomeBase) For prototyping purposes, we are planning on testing and demonstrating the device in a controlled, "Lab" setting

System Overview Vacuum Pump Storage Bin Vacuum Hose Auger Out (when full & docked) Mobility Platform w/ Micro-controller and on-board power Collection Manifold Sensors A: HomeBase Receiver B: Bin Full Sensor C: Bin Empty Sensor D-E: Obstacle Sensors HomeBase Transmitter

Mechanical

Current Design - Mechanical

Initial Prototype - Mechanical

Electrical

Electrical - Bin Full Sensor

Power

Power - Inverter Ratings (120vAC) 560W Continuous 700W for 5-Minutes 1000W Surge

Design Concepts - HomeBase

HomeBase - Transmitter

Design Concepts - Navigation Software

System Overview - Navigation

if (Run_Autonomous) { if (Run_Autonomous == 2) { LeftMotorDuty = +30; RightMotorDuty = +75; Set_Left_Motor_Duty_Cycle (LeftMotorDuty); Set_Right_Motor_Duty_Cycle (RightMotorDuty); spiral_count = 350; Start_Motors(500); Run_Autonomous = 3; } if (Run_Autonomous == 3) { if(spiral_count == 0) { ++LeftMotorDuty; Set_Left_Motor_Duty_Cycle (LeftMotorDuty); Set_Right_Motor_Duty_Cycle (RightMotorDuty); if (LeftMotorDuty == (RightMotorDuty-1)) { Stop_Motors(); LeftMotorDuty = 0; RightMotorDuty = 0; Set_Left_Motor_Duty_Cycle (LeftMotorDuty); Set_Right_Motor_Duty_Cycle (RightMotorDuty); Run_Autonomous = 0; } Start_Motors(500); spiral_count = 350; //Defines the change in radius per unit step of duty cycle Navigation Software - Spiral

Navigation Software - Implementation

Current Assignments Troy: Bin, Auger Hodge: Navigation, CAD Lyford: Vacuum, HomeBase software Curtis: Obstacle detection software, CAD, Scoop Wilson: Navigation, Bumper

Schedule Week 1 (8/30 - 9/3) o Brainstorming, Vacuum Testing, Sensor Bumper, MARV Wiring Week 2 (9/7 - 9/10) o MARV Training & Testing, Further concept development, Vacuum testing Week 3 (9/13 - 9/17) o MARV Navigation, Power systems, Vac. testing, Bin/Auger prototypes Week 4 (9/20 - 9/24) o MARV Nav., Bin construction, Implement nav. sensors, Vacuum testing Week 5 (9/ /1) o MARV Navigation, Bin construction, Mount vacuum and scoops Week 6 (10/4 - 10/8) o MARV Navigation, Implement bin sensors, Final mounting Week 7 (10/ /22) o Engineering Verification and Testing, Problem corrections Week 8 (10/ /29) o Engineering Verification and Testing, Problem corrections

Preliminary Budget Auger - $20 Vacuum Accessories - $40 Stock - $50 Fittings and Fasteners - $30 Bin - $25 Sensors - $60 Total - $225

Expenses

Questions