October 21, 2003H.J. Krebs1 LST Mechanical Design Review West Coast Team Mechanical Engineering and Design Manpower & Organization H. James Krebs October.

Slides:



Advertisements
Similar presentations
LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Advertisements

Limited Streamer Tubes for the IFR Barrel Installation Review SLAC, Oct 21, 2003 Stewart Smith INFN: Ferrara, Frascati, Genova, Padova, Roma, Torino US:
IFR-LST status report G. Cibinetto INFN Ferrara Babar Collaboration Meeting, Feb. 21, 2004 Milestones LST production status 1 st module assembled Princeton.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
LIGO-G M LIGO Laboratory1 Adv. LIGO Program Management (PM) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004.
October 21, 2003LST Mechanical Design Review - SLACN. Yu BaBar IFR Upgrades An FEA Study of the Effects of Adding Brass Plates in the IFR.
10/21/03H.J. Krebs1 LST Mechanical Design Review Brass Absorber Design H.J. Krebs October 21, 2003.
High Energy Physics at the University of Oregon Accelerator-based Accelerator-based Non-accelerator Non-accelerator Theory Theory.
1 SLAC BaBar Program Blair Ratcliff SLAC BaBar Program Manager June 2004.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
BaBar: The Detector Richard F Boyce 21 October 2003.
2004 BRASS INSTALLATION HARDWARE. BRASS INSTALLATION FOR 2004 TOP AND BOTTOM SEXTANTS ONLY PROCEEDURE AND FIXTURES FOR TOP AND BOTTOM ARE SIMULAR.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
May 5, 2004H.J. Krebs LST Installation Readiness Review 2004 IR-2 Installation Schedule H.J. Krebs May 5, 2004.
1 RF Power infrastructure Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
High Energy Physics at the University of Oregon. Standard Model  What is the universe made of?  How does it interact? Standard Model very successful,
SLAC ES&H Overview Craig Ferguson March Operating Model ES&H Mission Critical Issues Challenges Path forward Topics October 2008.
March 23, 2009H.J. Krebs1 BaBar D&D Schedule & Budget Overview H. James Krebs March 23, 2009.
May 4, 2004Bill Wisniewski1 Installation Review. May 4, 2004Bill Wisniewski2 Charge ( W. Althouse, G. Bowden, W. Innes(chair), J.Weisend, (D. Nelson))
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2004 IR-2 Installation Schedule H.J. Krebs October 22, 2003.
May 5, 2004H.J. Krebs LST Installation Readiness Review Brass Absorber Production H.J. Krebs May 5, 2004.
IFR End Door Enhancement Mechanical Engineering Status & Installation Issues H. James Krebs June 23, 2001.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
LST Storage and Testing at SLAC in the SLD Hall Available space Available Infrastructure Needed Infrastructure Time Line People Money Carsten Hast (SLAC)
October 21, 2003H.J. Krebs1 LST Mechanical Design Review Handling & Installation Fixtures Design and Fabrication Status H.J. Krebs October 10, 2003.
Lawrence Livermore National Laboratory This work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory.
Surveillance Planning Team Initial Team Meeting January 9-10 NASA Headquarters Team Introduction Revision A Tom Whitmeyer - OSMA Jeff Cullen - Procurement.
Page 1 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (1) Excellent job on preparing and presenting review Overall, the Committee feels that the.
LST SAFETY INSTALLATION READINESS REVIEW 5/5/2004 FRANK O’NEILL (SLAC)
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
LST Upgrade LST Upgrade Readiness Review William Sands, Princeton University,
11/15/02H.J. Krebs IFR Improvement Phase II (Barrel) Mechanical Engineering Issues H. James Krebs November 15, 2002.
November 15, 2003Bill Wisniewski1 Introduction Brief Status of LST project QA Review Mechanical, Schedule and Cost Review.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Wolfgang Menges, Queen Mary The BaBar Muon System Upgrade Wolfgang Menges Queen Mary, University of London On behalf of the BaBar LST Group.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
Off-Axis Collaboration Meeting Feb 7, 2004 Richard Talaga, Argonne (Liquid) Scintillator Structure Workshop Report Workshop Purpose –To review the current.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
The BaBar Upgrade Load transfer of the Barrel and Endcap Calorimeters Richard F Boyce 21 October 2003.
APEX 27 Participants Dr. M. Webster “Web” Ewell
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
B Factory D&D Review: March 23, 2009 Page 1 B Factory D&D: Strategy Overview S. Kahn Director, PPA.
September 20, 2007H. J. Krebs/B. Wands/B. Cooper1 SiD Collaboration Preliminary End Door Design Concept Support of Forward Systems H. James Krebs Bob Wands.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
“We believe in providing products and solutions that will increase our customers’ productivity and profitability.”
October 7, 2009H.J. Krebs1 Super B WorkShop Overview of BaBar Detector Assembly/Installation Documentation Jim Krebs.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
CERN Steve Kettell DUNE Collaboration Meeting January 12, 2016.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
Integration meeting F.Raffaelli
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
BaBar LST Upgrade Mark Convery SLAC 13 Jun 07.
Bill Wisniewski SuperB Frascati Meeting September 30, 2010
John T. Seeman DOE PEP-II Operations Review April 26, 2006
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
LST Mechanical Design Review
RPC and LST at High Luminosity
Limited Streamer Tube Project Summary
BaBar LST Upgrade Richard F Boyce
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

October 21, 2003H.J. Krebs1 LST Mechanical Design Review West Coast Team Mechanical Engineering and Design Manpower & Organization H. James Krebs October 21, 2003

H.J. Krebs2 Mechanical Engineering Manpower Mechanical engineering manpower consists of those individuals designing the hardware and fixtures associated with –Removing and installing steel flux return components –Removing barrel RPCs –Installing brass absorber –Installing LST detectors –LST gas system –Installing electronics racks, HV components, wireways, etc. –Any miscellaneous hardware associated with the IFR Improvement Project

October 21, 2003H.J. Krebs3 The West Coast Team SLAC –Richard Boyce –Allen Constable –Mark Convery –Les Dittert (Contract) –Carston Hast –Peter Kim –Jim Krebs –Harvey Lynch –Bob Messner –Michael Olson –Frank O’Neil –Rafe Schindler –Zenon Szalata –Zohrab Vassilian –Tom Weber –Bill Wisniewski –Charlie Young –Nancy Yu (Analysis) LLNL –Chiara Simani Oregon –Raymond Frey –Minghui Lu –Nick Sinev –David Strom –Jan Strube UCSD –Dave MacFarlane –Hans Paar Colorado –Shejian Chen Princeton (SLAC resident) –Ben Lau OSU (SLAC resident) –Thomas Allmendinger

October 21, 2003H.J. Krebs4 SLAC 2004 Installation Mechanical Engineering & Design Organization Chart

October 21, 2003H.J. Krebs5 Engineering Manpower Issues All participants are heavily committed elsewhere Several individuals can be classified as “critical” to the mission –Loss of almost anyone will probably have an adverse effect on the engineering and design schedule 2005 installation engineering manpower and organization is probably identical to that of 2004 Integration between LST teams and also between LST teams and BaBar systems has been fairly informal up to this point but much effort is expended here For Safety Oversight, see talk by Frank O’Neil Positive comments –The West Coast engineering and design team is highly experienced and motivated –Weekly meetings occur for mechanical engineering and installation team and also for the LST West Coast Team –The teams appears to be working as a coordinated unit