Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

Improvements to ME1/1 TMB Algorithm from Simulation Studies US CMS EMU Workshop Vadim Khotilovich, Texas A&M University.
TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
TMB and RAT Status Report Endcap Muon OSU April 16, 2004 Yangheng Zheng University of California, Los Angeles  TMB Status  RAT Status.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Stan Durkin.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.
CSC Synchronization Procedure and Plans CMS Endcap Muon FNAL October 29, 2004 Jay Hauser* / Martin Von der Mey / Yangheng Zheng University of.
Endcap Muon meeting: FNAL, Oct , 2004 J. Hauser UCLA 1 TMB and RAT Status Report Jay Hauser University of California Los Angeles.
US Test beam data analysis & validation of OSCAR/ORCA Tim Cox, UC Davis Nikolai Terentiev*, CMU CMS Physics Week Fermilab Apr , 2005.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
Preliminary Results from Structured Beam Test CMS Trigger Meeting June 3, 2003 Brian Mohr UCLA Dept. of Physics.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
1.2 EMU Electronics L.S. Durkin CMS Review CERN, September 2003.
1 SCA Cell Utilizing Scheme The output of each preamp-shaper channel is sampled continuously at 20 MHz and stored the SCA cells. There are 96 cells for.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
UCLA group meeting1/9 CSC update – my random summary Another good week for LHC: L=0.9E32 reached (nearly the goal of 1E32 in 2010) Test run with 50 ns.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
UCLA meeting, 2012 Hauser1 Since last week Technical Coordination workshop Gave talk on CSC upgrades New 2013 timeline – ME4/2 seems okay, ME1/1 is tight,
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
CSC High Pileup Sumulations Vadim Khotilovich Alexei Safonov Texas A&M University June 15, 2009.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
10 th LECC Workshop, September 2004, Hauser et al.1 Experience with Trigger Electronics for the CSC System of CMS J. Hauser*, E. Boyd, R. Cousins,
13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
1 Update on CompareTFandDMBLCTs.cc Analyzer that compares LCTs read out from the Track Finder (input FIFO) with those read out through the EMU data path.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
Update on “Muonic Timing” of CSC Electronics
Timing/Synchronization Status
CSC Synchronization Procedure and Plans
CSC EMU Muon Port Card (MPC)
CMS EMU TRIGGER ELECTRONICS
Overview: Introduction to LHC Overview of CMS
University of California Los Angeles
University of California Los Angeles
Current Status of CSC Trigger Elements – Quick Summary
CSC Muon Trigger - Annual Review
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
CSC Trigger Primitives Test Beam Studies
Analysis of Oct. 04 Test Beam RPC Data
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
TMB and RAT Status Report
Updates & Rates in the Level-1 CSC Trigger Primitive code in ORCA
CSC Trigger Meeting Summary
Sector Processor Status Report
Plans for the 2004 CSC Beam Test
Presentation transcript:

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate electronics (mainly DMB/TMB) are ready for production. Complete a trigger electronic chain test from CSCs all the way to the Track-Finder trigger. Subsidiary Goals: Find and fix hardware/firmware bugs and annoyances. Find and fix software bugs and annoyances. (Re-)demonstrate proper triggering and DAQ readout. Shake out new OO software package.

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 2 Beam Test Setup Peripheral Crate 2 DMB, 2 TMB 1 CCB, 1 MPC FED crate 1 DDU PC TTC crate DAQ Data Trigger primitives S1 S2 S3 beam CSC 1 CSC 2 Track finder Crate TRIDAS

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 3 Beam Test Setup // From front end cards 2 TMBs and DMBs MPC CCB + TTCRx 2 CSC’s, all on-chamber boards Peripheral crate Track Finder CMS readout board Up to 80K events read out in 2.6s spill

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 4 Typical Muon Event (CSC1 tilted)

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA Test Beam Chronology Phase I – structured beam May 23-June 1 ALCT timing tests CLCT and TMB studies High-rate tests Phase II – unstructured beam June CLCT and TMB studies Low-rate and high-rate tests Phase III – additional structured beam September Trigger optical link data transmission tests (MPC to SRSP)

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 6 Phase I Results Optimal timing found Fairly high efficiency (~98-99%) achieved Peripheral crate system basically working as desired Chamber angle, HV, threshold scans

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 7 Structure repeats during 2.6 s spill length 48 bunches 25 ns bunch spacing bunch width 3-5 ns SPS orbit period 1.2  s 23  s 2003 Synchronous Beam Structure

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 8 Bunch Structure, ALCT Delay Tuning BX efficiency vs. ALCT delay setting 0-31 ns Chamber 1Chamber 2 Expect muons in 48 out of 924 bx verified by CLCT bxn from data

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 9 BX Distributions With Optimal Anode Delays Note logarithmic scale Cathodes: Data mostly in 3 bx (no fine time- adjustment possible) Anodes: Data 98.7% in 1 bx (after fine time- adjustment) Chamber 1 Chamber 2

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 10 CLCT Positions Relative position of key half strip from CLCTs from chamber 2 vs. Chamber 1 Note: Chamber 1 is vertically higher than Chamber 2 (thus the offset in position). Zoom

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 11 LCT Efficiency vs. Comp. Thresh. HV=3600v

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 12 LCT Efficiency vs. HV

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 13 Trigger Rate Tests Expected LCT rate at LHC < 25 KHz (ME1/1) data consistent with dead-time = 225 ns Chamber #1 CLCT ,000 1,500 2, ,0001,5002,0002,5003,000 Beam Intensity (KHz) CLCT Rate (KHz) SLHC (10xLHC)

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 14 Number of LCTs (Run 529) Cathodes show ~4% 0-LCT events Early run, before timing tuned Anodes show ~10% 2-LCT events

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 15 Look at 2-ALCT events Differences: Bunch crossing counter Wire group

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 16 An Event w/ 2 Chamber 1 ALCTs Anode hits satisfy 6-hit requirement in 2 adjacent key wire groups

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 17 Patterns and Quality in ALCT and TMB Logic xxx__ ly 0 _xx__ ly 1 __x__ ly 2 __xx_ ly 3 __xxx ly 4 __xxx ly 5 ALCT Pattern TMB Patterns x___ xx__ _x__ _xx_ __x_ pattern 1 _x__ __x_ pattern 2 x___ xx__ _x__ pattern 3 _x__ pattern 4 __x_ _xx_ _x__ pattern 5 _x__ x___ pattern 6 __x_ ly 0 __x_ ly 1 _xx_ ly 2 _x__ ly 3 xx__ ly 4 x___ ly 5 pattern 7 Patterns: Qualities for ALCT and CLCT: Quality=36 layers in pattern Quality=25 layers in pattern Quality=14 layers in pattern Quality=0<=3 layers in pattern

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 18 Half-/Di-Strip CLCT Patterns Nominally phi_b=0, but small tilts, esp. chamber 2

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 19 CLCT Quality, Pattern vs. Phi_b Phi_b (tilt) Quality (layers) Pattern

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 20 Test Beam Periods 2&3 Timing-in procedures improved & documented Very high efficiencies achieved Highest trigger efficiency of 99.9% required low rate (few kHz) 2-chamber “excellent event” (CFEB, CLCT, ALCT) efficiency limited to 99% due to CFEB timing Improved scans taken: Angle scan HV scan Comparator threshold scan Pattern requirements scan Logic scope read out on most data True time history of LCTs read by SR/SP input FIFO (see Darin/Alexei talks).

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 21 CLCT Pattern Requirements Example – “excellent event” (2xCFEB, 2xCLCT, 2xALCT) percentages: Di-strip Pretrig. Layers Half-strip Pretrig. Layers Pattern Layers Run #Excellent Event Eff. (off) % % % % % (off) % (off) % (off) %

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 22 Digital Comparisons LCTs vs. Simulation Simulation “DIGIs” start from raw hit data ORCA classes used Added modifications to reflect test beam TMB firmware (due to FPGA limitations) In principle, tests ALCT, CLCT, and TMB logic. So far, mainly a good debugging tool for simulation Present level of ALCT disagreement: ALCT Wire Group: 1.75%/1.99% ALCT Quality: 0.15%/0.41% CLCT disagreement ~10% (see plots on right)

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 23 Comparison of LCTs to Simulation ORCA simulation has some shortcomings and needs updating: Pretrigger # of layers is still hardcoded. –Was varied during test beam data-taking No drift delay in ORCA after pretrigger – just uses any hits within 4 bx of some reference bx. ORCA logic selects highest quality only, doesn’t prefer half-strip patters to di-strip patterns as per hardware. Simplification for test beam TMB allows only 1 CLCT per CFEB These are being addressed right now.

Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 24 Comments on Results Timing in the system takes effort but getting easier (~2 weeks -> 1 week -> 2 days) Almost everything can be done remotely with software. Procedures must really be streamlined to deal with 468 chambers… When timed in and experts are present: Electronics hardware is reliable (nothing flaky). Data quality is terrific, esp. compared to other CMS subsystems… Trigger and readout efficiencies are very good. It will be hard work to streamline for 468 chamber operation…