1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

MICE CM January 2009Jean-Sébastien GraulichSlide 1 EMR Issues o Detector o Front end electronics o Funding and Plan Jean-Sebastien Graulich, Geneva.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
TJR Feb 10, 2005MICE Beamline Analysis -- TRD SEPT041 MICE Beamline Analysis – TRD SEPT04 Tom Roberts Muons, Inc. February 10, 2005.
Particle ID in the MICE Beamline MICE Collaboration Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
MICE CM16, RAL, 11 Oct 2006V. Palladino Plans for MICE PI detectors & Shielding MICE CM16, RAL Oct 11, 2006 V. Palladino, Univ & INFN Napoli for the small.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
M. Bonesini - 3/10/061 M. Bonesini INFN Milano Some results from BTF testbeam on TOF.
M. Bonesini1 TOF design updates M. Bonesini – INFN Milano.
Detector Systems Update MICO April 23, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u Tests to identify the source of the problems in the.
KEK Beam Test Koji YOSHIMURA KEK MICE Collaboration Meeting Koji YOSHIMURA KEK MICE Collaboration Meeting
1 G4MICE studies of PID transverse acceptance MICE video conference Rikard Sandström.
MICE VC 17 Aug MICE MAGNETIC FIELDS & SHIELDS J. H. Cobb & H. Witte Oxford University Magnet fields for MICE (VI) calculated including magnetic shield.
Downstream transversal sizes Rikard Sandström University of Geneva MICE detector meeting.
MICE Pid & trigger detectors MICE CM15, FNAL Jun 11, 2006 V. Palladino, Univ & INFN Napoli for the small PID team Bonesini, Chimenti, Cremaldi, Graulich,
VME readout fro TOF MICE Tracker Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
Detector Systems Update MICO April 14, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u H6533MOD PMT assembly reliability is the main concern.
M. Bonesini - MICE CM19 RAL 07/10/071 M. Bonesini INFN Milano PMTs tests in Milano (M. Bonesini, M. Rayner, S. Terzo)
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
M. Bonesini - 08/06/06 Fermilab1 M. Bonesini INFN Milano MICE TOFes construction & planning.
27/6/05 Frascati1 M. Bonesini INFN Milano A possible design for MICE TOF stations.
M. Bonesini - MICE Collaboration Meeting 9/10/061 M. Bonesini INFN Milano TOF status (mainly TOF0/1)
M. Bonesini DAQ Meeting1 M. Bonesini INFN Milano Some Considerations for MICE TOF Stations FE electronics (mainly TOF0)
Walaron Diagnostics MICE Collaboration Meeting Berkley 9/2/ Beamline Diagnostics Kenny Walaron University of Glasgow / RAL.
April 2006Jean-Sébastien GraulichSlide 1 Pmts and Scintillators o Used Material in Geneva - Big Scintillator Slabs + Pmts - XP2972, 1” Pmts + Voltage Divider.
MICE VC March 2009Jean-Sebastien GraulichSlide 1 EMR Status o Introduction o News o Detector Design o Simulations o Responsibilities o Plan Jean-Sebastien.
M. Bonesini - MICE CM CERN 24/2/071 M. Bonesini INFN Milano Updates on TOF project.
May 12, 2004 TJR1 Effects of Upstream ParticleID Counters on MICE Good-Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
MB1 T.O.F. II Precise timing Electron ID Eliminate muons that decay Tracking devices T.O.F. 0 & I Pion /muon ID precise timing 201 MHz RF cavities Liquid.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields MICE PID detectors & Shielding MICE CM17, CERN Feb 25, 2007 V. Palladino, Univ & INFN.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
PHOBOS TOF Construction Status
Time of Flight Counter BESIII International Review Sep. 16, 2002 Heng Yuekun
27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.
MICE PID & trigger Detectors MICE CM11, LBL Feb 12, 2005 for the PID team Bonesini, Cremaldi, Gregoire, Kahn, Roberts, Sandstrom, Summers, Tilley, Tonazzo,
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical designs (structure of detectors, supports, …) will be.
SoLID HGC Update Zhiwen Zhao,Weizhi Xiong, Gary Swift Haiyan Gao,Garth Huber 2015/09/12 1.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Performances of SiPMT array readout for Fast Time-of-Flight Detectors 13th Conference on Innovative Particle and Radiation Detectors Siena – 7-10 October.
M. Bonesini - 22/10/05 RAL1 M. Bonesini INFN Milano MICE TOF stations construction & planning.
MICE PID size &scraping MICE CM16, RAL, Oct V. Palladino, Univ & INFN Napoli for R. Sandrstrom and others contributing to this effort Yagmur, Holger,
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
MICE Phase 1 Koji Yoshimura KEK June
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
PID PC 7th Sept MICE MAGNETIC FIELDS & SHIELDS J. H. Cobb & H. Witte Oxford University Magnet fields for MICE (VI) calculated including magnetic.
3 June 2009J. H. Cobb 1 ANALYSIS SUMMARY CM24 Agenda for Analysis parallel session at CM Sunday 31 May 14:00.
Instrumentation and Simulations for Target Test MICE Collaboration Meeting 22 October Bill Murray 1, Paul Soler 1,2, Kenny Walaron 1,2 1 Rutherford.
MICE CMPB Alain Blondel 1 Highlights on MICE.
1 MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau.
M. Bonesini - MICE PID review 12/10/061 M. Bonesini INFN Milano TOF upstream PID review (TOF0/1)
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
Eli Piasetzky Tel Aviv University Beam Scintillating Fibers PSI, Technical Review, July 2012 Guy Ron Hebrew University Israel.
A.PasseriHigh granularity Pb-SciFi calorimeter1 Construction and tests of a fine granularity lead-scintillating fibers calorimeter P.Branchini, F.Ceradini,
26/10/04 Meeting1 M. Bonesini INFN Milano MICE TOF0, TOFI, TOFII status.
Luminosity Monitor Status
MICE PID detectors & Shielding MICE CM19, RAL Oct 10, 2007
Particle ID Diagnostics in the MICE Beamline
Presentation transcript:

M. Bonesini PID Meeting1 M. Bonesini INFN Milano MICE TOF0 construction & planning

M. Bonesini PID Meeting2 Outline  Present design for TOF0 (as endorsed by MICE TP)  Current problems  BTF testbeam plans  some side considerations for TOF1/2

M. Bonesini PID Meeting3 Rates (Singles per ms) target insertion reduced to get 600 good mu+/sec (AUG05) LAHETGeant4MARSAverage TOF TOF Tracker Tracker TOF Good μ + (Ev/sec)

M. Bonesini PID Meeting4 TOF0 AUG05 beamline:news from 21/10/05 from T. Roberts 6pi beam

M. Bonesini PID Meeting5 1pi beamline design from D. Adams

M. Bonesini PID Meeting6 Present design of TOF0 From D. Adams & T. Roberts simulations a 40 x 40 cm 2 active area and a 4 cm segmentation seems a good choice BC-420 scintillator bars 40 x 4 x 2.5 cm 3 ordered at Bicron (emission peak ~390 nm) some problems with plexiglas procurement for lightguides (it must be UVT, not commercial one)

M. Bonesini PID Meeting7 Current problems small problems with UVT plexiglas procurement main problem mainly connected with FE electronics use of V1290 TDCs may require some integration stage after amplification to implement TOT correction one V1290 has been delivered to INFN Milano, we are waiting for V2718 DAQ

M. Bonesini PID Meeting8 The BTF testbeam we need to test FINAL detector “prototypes” (we are tight with time schedule) : TOF0 is frozen … we need to freeze also MUCAL, i.e. CKV2 in/out defines MUCAL dimensions !!!! Testbeam 10+2 days requested for beginning of June We will try to have our DAQ (not use default BTF one, that is quite cumbersome)

M. Bonesini PID Meeting9 Some side considerations for TOF1/TOF2 up to know only PMTs fine-mesh solution considered but problems: their cost has increased as respect to previous quotations by 50% !!!! (increase of cost of fine-mesh grids, according to Hamamatsu) B field is 1000 G _|_ to PMT axis (it can be shielded also in R4998) and 200 G // to PMT axis : studies are ingoing to see if we can either increase shielding for // axis component and have R4998 working

M. Bonesini PID Meeting10 Calculations from J. Cobb, presently B// ~200G, B_|_1000G |B| at TOF for 7 configurations of Iron Discs & Gap

M. Bonesini PID Meeting11 Conclusions up to now we are in schedule but manpower is very thin and we have to avoid ANY duplication/waste of work: eg prototyping must be final detector construction