HCAL-Fermilab7 Feb 2003Hazen / Machado HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.

Slides:



Advertisements
Similar presentations
MuTr Shielding & Grounding Preliminary 10/6/99 (G. Hart) Additions 1/4/01 (REM)
Advertisements

256 channel data acquisition system for VISTA focal plane to readout sixteen 2k x 2k VIRGO detectors Largest ever such system.
E0’ setup at CERN, , lab 187-R-D06, via bat 70, tel Is there a sock over the umbilical - if so how connected to chassis. and how far does.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
Update on Electronics Activities Jim Pilcher University of Chicago 20-Jan-2006.
HF Video MeetingDec 2002E. Hazen HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
Cosmic Ray Test Stand with Scintillating Cells for Digital Hadron Calorimeter As of 9am 05/28/2003.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
Walls crates cables gas chambers electronics CERN adb.
1 Linac/400 MeV BPM System Status Nathan Eddy PIP Meeting 8/8/12.
Marc Baarmand Total of 8 Calibration Boxes (CBOX) for HF  CBOX contains Small blue scintillator (UV → blue) 1×9 Splitter (each CBOX serves 9 PMT RO Boxes)
Flobber Space Constraints: Resolution Options James Mott, Eric Hazen, Dan Gastler Tracker Meeting 08/20/15.
HF Cabling Upgrade Options T. Shaw 30-OCT HF 2012 Upgrade Meeting 30-OCT-10 T. Shaw.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
March 12, 2006R. Abrams LCWS06 Bangalore1 ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
1 Prototype Calibration System for Forward Hadron Calorimeter L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
PMT gain check at Indiana University. Test setup inside dark box LED white paper PMT # JT0298 channel #2 (per HPK numbering) OTHER CHANNELS MASKED WITH.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 H C A L HF Cable Plant Options HF Cable Plant Options December 22, 2010 T. Shaw.
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
CDMS II Shielding To Installation To Construction From Design.
PandaX 实验中的电子学概述 郭国栋 Outline Introduction Original scheme Improved scheme PMT base design in PandaX I and PandaX II Decoupler design in.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Specifications Asic description Constraints Interface with PDM board Planning Summary.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
Mauro Citterio - Mi meeting
Update on Electronics Activities
HF “Slice test box” installation
Test beam straw prototype production status
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Present Read Out Chain for the PANDA Barrel DIRC
HF Test station at P5 A.Mestvirishvili.
HF “Slice test box” fabrication and installation
BPMs in the new Dump Line
Mini-drawers, FE-ASIC , Integrator
ROBOX modification plans
Electronics for RPC Upscope
HF Test station at P5 A.Mestvirishvili.
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
Front-end electronic system for large area photomultipliers readout
VeLo Analog Line Status
. . SDSU Controller Internal Cabling
NPS/CPS/COMCAL - Readout
Testbeam status report
RPC Electronics Overall system diagram Current status At detector
. . SDSU Controller Internal Cabling
Presentation transcript:

HCAL-Fermilab7 Feb 2003Hazen / Machado HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University

HCAL-Fermilab7 Feb 2003Hazen / Machado Outline ● PMT-to-QIE cabling summary ● Patch panel / ROBOX cabling design ● New QIE HF boards ● Test results (review) ● Plans for Test Beam

HCAL-Fermilab7 Feb 2003Hazen / Machado PMT-to-QIE Cabling PMT Anode 50Ω coax Skew-Clear ~50  single-ended to ground Coax shield ground at each PMT base Overall shield connected to QIE ground Separate Ground for each PMT QIE Signal Input QIE Reference Input PMT Box Two pairs per PMT channel Multi-pin shielded connectors (MDR-36)

HCAL-Fermilab7 Feb 2003Hazen / Machado PMT Box Signal Cabling MMCX on prototypes Soldered for production? SMB plug/socket for patch panel 50  mini-coax Patch panel PCBs Space for HV, Gas connectors

HCAL-Fermilab7 Feb 2003Hazen / Machado MDR Connector RefSignal Ref Return Signal Return Shield 12-pair Skew-Clear cable handles 6 QIE channels Each channel has: Pair 1: Signal, Signal Return, Shield Pair 2: Reference, Reference Return, Shield Overall Shield connected to metal connector backshell Can accommodate ether paired or coax cable for testing...

HCAL-Fermilab7 Feb 2003Hazen / Machado Skew-Clear Cables ● Two 5m cables delivered, but backshell with locking mechanism didn't fit... need to fix before testbeam cables are made. ● Can use existing cables for lab testing Cables made by assembly house have only shrink tubing

HCAL-Fermilab7 Feb 2003Hazen / Machado QIE boards for HF ● New prototypes available here ● Hope to take some home with new CCM for testing starting next week...

HCAL-Fermilab7 Feb 2003Hazen / Machado PMT+QIE Test Results (recap) ● Blue Nichia LED driven by Zetex avalanche transistor ● Pulser synchronized to QIE clock ● White paper (multiple sheets) used to attenuate to a fraction of a pe ● Data recorded using HTR+DCC thru VME

HCAL-Fermilab7 Feb 2003Hazen / Machado pulse 20 time samples (1500 V) 0-40 LC reflection (electric) reflection (electric)

HCAL-Fermilab7 Feb 2003Hazen / Machado 1, 2 pe response at 1500V 1500 V

HCAL-Fermilab7 Feb 2003Hazen / Machado 1pe peak vs HV 1100 V1200 V1100 V 1500 V1600 V 1700 V 1300 V1400 V

HCAL-Fermilab7 Feb 2003Hazen / Machado Signal / Pedestal vs HV sample 8 (pulse) sample 9 (reflec) HV signal

HCAL-Fermilab7 Feb 2003Hazen / Machado Average, Typical LED Pulses

HCAL-Fermilab7 Feb 2003Hazen / Machado HF Electronics for TB ● BU Responsibilities: – 12 skew-clear cables – Patch panels for PMT boxes (how many?) ● Plus participation in: – 3U crates w/ backplanes (2) – CCM + QIE board testing – LV power (?)

HCAL-Fermilab7 Feb 2003Hazen / Machado Task List