Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,

Slides:



Advertisements
Similar presentations
LCLS Control System Overview Mike Zelazny SLAC ICD Software Department Accelerator Directorate.
Advertisements

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Paul Chu FRIB Controls Group Leader (Acting)
Ernest L. Williams Jr. Controls Commissioning October 2007 Controls Commissioning Facility Advisory Committee.
Patrick Krejcik LCLS June 16-18, 2008 High Level Applications Facility Advisory Committee Meeting June 17, 2008 Applications Team.
Stephanie Allison LCLS Integration with SLC October 12, 2004 Integration with SLC LCLS Facility Advisory Committee Oct 12, 2004 Introduction.
June 17, 2008 LCLS FAC D. Fairley MATLAB Feedback Phase II Commissioning.
Mike Zelazny FAC April 17 th, 2007 Matlab Applications Image Management Bunch Length Measurement Feedback Software Engineers.
Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory New High-Level Applications for 2009 Henrik.
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
Dayle Kotturi LCLS Diagnostics and Commissioning Workshop September 23, 2004 LCLS Controls and Data Acquisition September 23, 2004.
Debbie Rogind & Greg White High Level Applications October High Level Applications.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
LCLS Control Group FAC - Controls April 7, 2005 Controls Overview April 7, 2005 Outline ES&H Goals FAC Responses.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Hamid Shoaee LCLS Facility Advisory Committee 20 April Controls Overview April 20, 2006 LCLS Controls Group Outline Goals.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Paul Emma Injector/BC1 Commissioning April 20, Injector/BC1 Commissioning (Dec. 1, ’06 through Aug. 1, ‘07) P. Emma LCLS.
November 12, 2008 Controls Software D. Fairley LCLS Feedback.
Oct. 30, 2007 LCLS FAC D. Fairley MATLAB Feedback Phase II Commissioning.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Organization & Integration with the rest of the lab, Accelerator.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Controls Organization Overview A Progress Report Hamid Shoaee.
Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 LCLS Control System Status EPICS Collaboration Meeting December.
BROOKHAVEN SCIENCE ASSOCIATES High level applications and EPICS control GUOBAO SHEN NSLS-II, Control Group May 4 th, 2009.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
K. Luchini LCLS Controls, July 1, 2005 SLAC Aware IOC EPICS Magnet Functional Requirements Introduction Magnet Functions.
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
Greg White, Stanford Linear Accelerator Center, 2007 Operational Tools at the Stanford Linear Accelerator Center Greg White, for many, many, great programmers,
Paul Chu SLAC App. 10/14/ SLAC (LCLS) Application Plans P. Chu for SLAC High-Level Application Team.
LCLS Control Group EPICS Collaboration April 27, 2005 Controls Overview April 27, 2005 Outline Goals Status update.
1 Henrik Loos 1 13 Sep 2011 APE Meeting Recent Activities H. Loos 09/13/2011.
The recent history and current state of the linac control system Tom Himel Dec 1,
1 P. Chu 1 Adapting XAL for LCLS EPICS Meeting, Vancouver Adapting XAL for LCLS Paul Chu - SLAC May 1, 2009.
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
1 BROOKHAVEN SCIENCE ASSOCIATES High Level Applications Infrastructure and Current Status Guobao Shen, Lingyun Yang* Controls Group & Accelerator Physics.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
2/20/2016J-PARC1 Virtual Accelerator An Accelerator Simulator.
Controls Test Stand Test stand proposal document review - Dayle. The activities can be prioritized according to which measurements we need to do first.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues “How to integrate the legacy system.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg June 18-20, SLAC Tune Tracker/Feedback Mike Laznovsky.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues Subsystem architecture, or… “How.
1 BROOKHAVEN SCIENCE ASSOCIATES EPICS Version 4 – Normative V4 Team – presented by Bob Dalesio EPICS Meeting October 7, 2011.
Hamid Shoaee LCLS Facility Advisory Committee October Control System Overview Hamid Shoaee for the LCLS Controls Group.
LCLS Commissioning & Operations High Level Software
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
Introduction Functional Requirements (Stephanie) SLC Executive (Diane)
LLRF and feedback Outline Scope LLRF Requirements
LCLS Commissioning & Operations High Level Software
Work Update J. Rzepiela 8/17/10.
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
What am I working on… H. Loos 08/02/2010.
Phase II Commissioning
Injector/BC1 Commissioning (Jan. 2, 2007 through Aug. 31, 2007) P
Linac/BC1 Commissioning P
High Level Physics Applications for LCLS Commissioning
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
Injector Diagnostics Status
Injector/BC1 Commissioning (Jan through Aug. 2007) P. Emma, et al
LCLS Control System Personnel Linac & BC2 Controls progress
High Level Physics Applications Lehman Review February 7 - 9, 2006
Presentation transcript:

Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley, Rogind, Allison, Zelazny, Chevtsov, Laznovsky Outline Required High Level Applications for Injector Commissioning Interim deliverables Long-term plans

Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications for Injector Commissioning The original plan for high level applications called for making use of both the XAL and SLC applications suites The XAL use included: Emittance application On-line Model to provide model parameters to the Emittance application Energy spread application Bunch Length Measurement application

Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications for Injector Commissioning All other required applications were to be provided by the SCP Orbit Applications Orbit display Orbit fitting Orbit corrections Bump calculation Power steering These applications require CAMAC magnet control will not be available via EPICS before injector commissioning, so the SLC system and SLC-aware IOCs will provide orbit apps during first commissioning.

Hamid Shoaee High Level Physics 20 April 2006 High Level Applications – Change in Direction The applications group has been temporarily re-assigned to other tasks Supporting Timing System, Fast Feedback, Magnet control, etc. The new plan for Injector commissioning calls for… Making heavy use of MATLAB for application development Providing access to most control subsystems from MATLAB Enlisting the support of accelerator physicists in developing some of the required applications The Applications Group to provide the MATLAB interface to the accelerator data and the supporting infrastructure To migrate the applications to the XAL environment at a later date The critical Bunch Length Measurement application will be first prototyped it in MATLAB by the applications group The physics group will develop prototype Emittance / Energy spread applications in MATLAB

Hamid Shoaee High Level Physics 20 April 2006 Some applications require an interface to wire scanners and screens (OTRs/YAGs) The control for these and other new LCLS-specific devices will be available only through EPICS These applications will request scans or images via channel access from EPICS IOCs The applications will receive raw data and/or calculated parameters (beam sizes, etc.) from IOCs Low-level control of all LCLS-specific devices will be through EPICS

Hamid Shoaee High Level Physics 20 April 2006 Injector commissioning will make heavy use of the SLC control software Supporting software Online model; transfer matrices and twiss parameters SLC on-line model for orbit applications XAL on-line model used for emittance and energy spread calculations Buffered acquisition - SLC Correlation plots - SLC Multiknob facility - SLC Configuration management - SLC Golden orbits, user set-points, constants Applications not listed here are not required for commissioning They will be attended to once commissioning apps are complete

Hamid Shoaee High Level Physics 20 April 2006 High Level Applications Requirements (PRD - by Patrick Krejcik) The following applications are being prototyped in MATLAB, using LabCA to access IOC PVs, Aida to access LCLS Model data from SLC. Bunch Length Measurement application (including the Transverse Deflector Cavity Feedback) - Mike Z., and Sergei C. with Paul Emma Emittance application - Debbie R. with Henrik Loos Energy / Energy Spread - Debbie R. with Henrik Loos All other HLA will be provided by the SCP, using the SLC- aware IOCs to interface to Magnets, RF, BPMs and other measurement devices.

Hamid Shoaee High Level Physics 20 April 2006 High Level Applications Requirements (PRD - by Patrick Krejcik) The LCLS online model will be implemented through the SLC database and the modeling facility integration and test of SLC-aware IOC with real hardware - Diane F. and Debbie R. The general approach for the MATLB prototype application development is to: have software engineers set up the LabCA and Aida interfaces to the IOCs and SLC model data identify the PVs required structure the application and help develop simulations to be used until actual devices are ready. The physicists and software engineers will collaborate on creating a usable MATLAB application in each case.

Hamid Shoaee High Level Physics 20 April 2006 Fast Feedback Requirements PRD by Paul Emma Feedback loops will be prototyped in MATLAB, using LabCA to access IOC PVs, Aida to access LCLS Model data from SLC. MATLAB limits feedback loops to about 1Hz rate We will use the same prototyping approach described above. We are currently working on a soft IOC "simulator" to support feedback development. The following loops are currently under development Bunch Charge - Diane F., Sheng P., physicists Injector Launch - Diane F. and Juhao W.* DL1 Energy - Diane F. and Juhao W. Spectrometer Energy - Diane F. and Juhao W. DL1 Energy + BC1 Energy + Bunch Length - Diane F. and Juhao W. Transverse Deflecting Cavity - Mike Z., Sergei C., and Paul Emma The Injector Launch feedback loop will also be prototyped in an Epics soft IOC. This will give us a chance to prototype what will be the long-term design of the Fast Feedback loops for LCLS.

Hamid Shoaee High Level Physics 20 April 2006 Long-Term Goals for HLAPPS & Fast Feedback Long Term Priorities for high level applications RDB support for XAL XAL online model XAL PVLogger All application developments in XAL Long Term Priorities for Fast Feedback Decision point - use state-space or classical (PID) formalism? Decision point - interface for fast feedback communications: Front- runner - custom raw Ethernet interface on second Ethernet port. Implement a driver for this dedicated interface Formal design of a general Fast Feedback system, and implement in EPICS (based on SLC Fast Feedback architecture)