PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.

Slides:



Advertisements
Similar presentations
Fast & Furious: a potential wavefront reconstructor for extreme adaptive optics at ELTs Visa Korkiakoski and Christoph U. Keller Leiden Observatory Niek.
Advertisements

Thomas Stalcup June 15, 2006 Laser Guidestar System Status.
SSWG Meeting 2006 May 8 SSWG May ’06: SAMS. SSWG Meeting 2006 May 8 Agenda SAMS Hardware overview SAMS Software overview System status – performance to.
Wavefront Correction SystemWavefront Correction System Hardware and Software.
“Riding the Hub”: The MMT Adaptive Secondary Douglas Miller University of Arizona The AO System Current Performance of the MMT AO System Ongoing Development.
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
Adaptive Optics for Wavefront Correction of High Average Power Lasers Justin Mansell, Supriyo Sinha, Todd Rutherford, Eric Gustafson, Martin Fejer and.
PALM-3000 Status of the PALM-3000 high-order adaptive optics system A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss, J.R. Crepp,
PALM-3000 HOWFS - 2/20/09 C. Baranec. PALM-3000 HOWFS Current optical testing Review of Feb 8 th HOWFS update Detailed future tasks 2.
PALM-3000 Electronics PDR Stephen Guiwits Dean Palmer Ernest Croner 023 Robinson Room January 21, 2009.
PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.
PALM-3000 HOWFS - 5/29/09 C. Baranec. PALM-3000 HOWFS tasks in preparation for testbed work CCD50 readout modes – defined, awaiting quote. Test the camera.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
PALM-3000 P3K Team Meeting #16 Stephen Guiwits Dean Palmer, Ernest Croner, Antonin Bouchez Team Meeting # Cahill March 05, 2010.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
PALM-3000 P3K Integration and Test Review Stephen Guiwits P3K System Computers and Electronics 273 Cahill September 22, 2010.
PALM-3000 HOWFS Design Update 2/27/08 C. Baranec Pasadena, CA February 27 th 2008.
PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Status and the 3388-actuator Xinetics Deformable Mirror A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss,
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
High-Order Deformable Mirror
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
PALM-3000 P3K Team Meeting #15 Stephen Guiwits Dean Palmer Ernest Croner Team Meeting # Cahill October 29, 2009.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
PALM-3000 ATST/BBSO Visit Stephen Guiwits P3K System Hardware 126 Cahill February 11, 2010.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009.
LGS Project Meeting November 9, Outline 1.Project infrastructure 2.PALM-3000 update 3.LGS subsystem updates –Optical bench –LGS facility –AO software.
PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
PALM-3000 HOWFS - 7/24/09 C. Baranec. PALM-3000 Current Status Summary 2 Telescope simulator assembled HOWFS assembled and tested Alignment plan (CIN.
Thermally Deformable Mirrors: a new Adaptive Optics scheme for Advanced Gravitational Wave Interferometers Marie Kasprzack Laboratoire de l’Accélérateur.
Keck Laser Guide Star Adaptive Optics System: 1 st & 2 nd Milestones AOWG Telecon Oct. 17, 2003 A. Bouchez, J. Chin, A. Contos, S. Hartman, E. Johansson,
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002 Keck AO Overview to support summit tour.
1 NGAO Science Instrument Reuse Part 1: NIRC2 NGAO IWG December 12, 2006.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
5 th February 2010 FP7 Prep WP9000 Progress Meeting 1 Update Tim Morris Durham University FP7 Prep WP 9340.
SimPhonics, Inc. SimPhonics SMx Audio System. SimPhonics, Inc. V+ Visual Programming Language SMx Audio System Various I/O Drivers VComm Networked Audio.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
MCAO Adaptive Optics Module Mechanical Design Eric James.
Technology Division INSTITUTO DE ASTROFÍSICA DE CANARIAS Luis F. Rodríguez-Ramos Instituto de Astrofísica de Canarias Canary Islands, SPAIN “Hardware Developments.
NATIONAL INSTITUTE OF SCIENCE & TECHNOLOGY Presented by: Santosh kumar Swain Technical Seminar Presentation by SANTOSH KUMAR SWAIN Roll # CS
Position sensing in Adaptive Optics Christopher Saunter Durham University Centre for Advanced Instrumentation Durham Smart Imaging.
1 Palomar Tomograph V. Velur 1, B. Platt 2, M. Britton 1, R. Dekany 1 1 Caltech Optical Observatories, California Institute of Technology 2 Interferometry.
Tomographic reconstruction of stellar wavefronts from multiple laser guide stars C. Baranec, M. Lloyd-Hart, N. M. Milton T. Stalcup, M. Snyder, & R. Angel.
Lyot Stop Focal Plane Mask OAP3 Out of plane spherical mirror.
February 2013 Ground Layer Adaptive Optics (GLAO) Experiment on Mauna Kea Doug Toomey.
SAMS Project David Buckley, Hitesh Gajjar & John Menzies May 2014.
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
The Active Optics System S. Thomas and the AO team.
Lawrence Livermore CfAO Video Conference - March 29, 2001 Emily Carr Department of Electrical and Computer Engineering University of California, Davis.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
Page 1 Adaptive Optics in the VLT and ELT era Wavefront sensors, correctors François Wildi Observatoire de Genève.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
ALPAO ACEfast RTC Armin Schimpf, Mickael Micallef, Julien Charton RTC Workshop Observatoire de Paris, 26/01/2016.
Date of download: 6/22/2016 Copyright © 2016 SPIE. All rights reserved. Synopsis of the pyramidal surface parametrization. Figure Legend: From: Modeling.
Date of download: 6/26/2016 Copyright © 2016 SPIE. All rights reserved. PICTURE C uses a 60 cm clear aperture, off-axis, Gregorian telescope in the Wallops.
Keck Observatory Status
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Presentation transcript:

PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010

PALM-3000 PALM-3000 status The big picture: We are integrating the new PALM-3000 components in the lab, while a few remaining subsystems are in detailed design. We are on track for a pre-ship review in early July. Talk Outline: Status by subsystem –3388-actuator DM testing results Integration and testing in 2010 Commissioning plans in

PALM-3000 Optical Bench DM3388 DM241 OAP1 TTM FM3 FM4 FM1 FM2 OAP2 SSM1 SSM2 HOWFS & ACam Science Instrument Volume Detailed design of all optomechanics is complete Currently verifying global flexure of bench with science instrument Remaining design tasks: –Stimulus fold mirror –Enclosure –Cable routing –Cable interface boxes

PALM-3000 High-Order Deformable Mirror Prior to face sheet bonding (Xinetics Inc.) Received at Caltech on Dec. 4, 2009 Spent Dec-Jan. testing performance with a Zygo interferometer In the lab at Caltech

PALM-3000 HODM testing Tested with a Zygo in I&T testbed –Plastic curtains enclose bench to allow humidity control with dessicant Data –Unpowered and bias voltage measurements at 40-50% RH, % RH and 20-30% RH –Actuator influence functions –Actuator Linearity –Actuator Hysteresis –Actuator Creep Reconstructor made from the influence functions was used to flatten the mirror –Other control tests include controlling to the low spatial frequency error instead of flat and maximizing the focus error to test the full mirror stroke

PALM-3000 HODM Control Result Mirror in normal mode (40V bias) Temp: 75  F RH: 26% Zernikes 1-30 were removed from the bias measurement and the residual wavefront was flattened using the HODM actuators. The result is on the left. On the right is the same measurement less Zernikes This is what we can expect to achieve when the LODM is correcting the low-spatial-frequency errors Surface

PALM-3000 HODM lessons The HODM can be flattened to 10nm RMS –Simulations show that resulting wavefront will not limit contrast performance The total stroke of the mirror is 1.06μm. –A few actuators along the bottom of the mirror have significantly lower stroke With the LODM, the HODM will use 30% of its stroke to correct its own figure We need to control the humidity around the HODM –Best figure between 20% and 30% RH 40V bias rather than the nominal 50V bias gives more stroke and a better base figure at the expense of more non-linearity in the actuator gains

PALM % RH 74deg Humidity Results Unpowered surface figure at different humidities shows the effect of humidity on the puckers Ideal humidity is between 13% and 30% 45% RH 74deg13% RH 70deg

PALM-3000 High Order Wavefront Sensor Complete and ready for installation in lab testbed Flexure testing ongoing. Initial results meet requirements (<0.2”/hr) Two optics need to be replaced: Will replace and realign later in spring Acquisition camera (not shown) needs to be aligned and tested See Baranec, Proc. SPIE 7015, Meets requirements (<0.05 binned pixels)

PALM-3000 HOWFS Detail Microlens arrays imaged with a CMOS alignment camera Shack-Hartmann spots imaged with the CCD-50

PALM-3000 Electronics Overview Wavefront Processor (computer room) DM Racks (Cass cage pos. 2 & 3) Controller Racks (Cass cage pos. 4 & 5) User Workstation (Data Room) Fiber Splitter AO Bench Ethernet Pvt net Legend: Fiber, high-speed switch, ethernet, AO bench cables

PALM-3000 DM Electronics and Cabling Lab configuration complete and in use (serial com. to DM drivers, 99 cables, air cooled) Current design efforts: -High-speed DM command electronics design in progress -Operational DM cable design in progress (16 cables for HODM, 1 for LODM) -Driver electronics dissipate ~6 kW. Liquid cooling design still required

PALM-3000 Wavefront Processor Computer Wavefront Processor Computer clusters completed and deployed (JPL and Caltech) Significant challenge has been hardware/software compatibility. Manufacturer of high-speed switch went out of business. Have demonstrated full vector matrix multiplication using 64x64 subapertures at 1.24 kHz with current GPUs If necessary, will upgrade to latest GPUs after pre-ship review to meet 2 kHz requirement

PALM-3000 Software Deep into coding & verifying interfaces. Expect to begin using software environment in the lab in Feb. Major components% Complete Publish/subscribe infrastructure 100% Command parser95% –Includes communications interfaces Wavefront processor30% Device drivers (hardware interfaces)75% Telemetry system50% Automations25% Graphical user interface20% 14

PALM-3000 Servo Control Flexible servo control scheme. Detailed design of N=64 mode complete Detailed design of other modes still in progress

PALM-3000 Palomar Infrastructure Currently defining requirements. Major components: Power at Cassegrain focus (& AO lab) Coolant at Cassegrain focus (& AO lab) Telescope balance adjustments Power in computer room Communications between Cass, Computer Room, AO lab, and Data Room 16

PALM-3000 PALM-3000 Testbed 17 HOWFS & ACAM HODM Zygo HASO CMOS WFP computer Includes HODM, HOWFS, WFP computer, and 3 calibration/diagnostic sensors Will allow us to verify all electronic & software interfaces.

PALM-3000 Lab I&T Schedule Testbed activities Dec-JanVerify performance of HODM Feb-MarVerify performance of HOWFS Mar-AprTest wavefront processor, software environment May-JunVerify high-speed wavefront control performance JulSPIE meeting, pre-ship review 18

PALM-3000 PALM-3000 Schedule Overview 19