MICE FAC Alain Blondel 7 October 2007 1   MICE The International Muon Ionization Cooling Experiment MICE CM19.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
MICE CM15 Alain Blondel 8 June MICE CM 15 Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. today: -- reviews and.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
Collaboration Board Summary K. Long, 27 June, 2015.
1 paul drumm; ; FAC-PR MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
CMPB Alain Blondel 14 April STATUS OF MICE.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
MICE VC Alain Blondel 10 January MICE VC Jan 2008 MICE news -- BEST WISHES TO ALL FOR main outcomes of MICO meeting 9 January --
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Project manager report paul drumm CM16 October 2006.
MICE CMPB Alain Blondel 1 August spokesperson remarks CMPB MICE NEWS.
K. Long, 10 October 2015 Project Manager’s report Status/progress since CM18 Looking forward Organisation Conclusions.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM29.
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MICE news video conference 15 march MICE NEWS 1.TOF0/1/2 funding 2.MICE Installation/Commissioning/Operations group (MICO) 3.Important issues from.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
Alain Blondel 4 April  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
MICE VC Alain Blondel, April MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
Muon Ionisation Cooling Experiment Overview
Accelerator R&D for Future Neutrino Projects
MICE CM31 Schedule summary
Presentation transcript:

MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19

MICE FAC Alain Blondel 7 October Overview MICE has essentially recovered from a major hiccup (Project manager resignation) and associated collateral damages (PSI solenoid, lapses of communication, delays in refurbishment of quads etc...) thanks to the dedication of many MICE collaborators, and Ken Long and Chris Nelson in particular. The collaboration is holding together. -- aim to have beam in the MICE hall in fall 2007 has vanished. -- Priority #1 is to ensure that full beam line is ready for step I data taking at the end of the Christmas shutdown (20 January) -- A cosmic test will be organized in bldg. R12 in November-December with a good fraction of detectors (DAQ, Tracker, CKOV, TOF0 and TOF1, KL) -- shakedown of the detectors and practice of DAQ -- avoids work pileup in February Much progress has been accomplished in the MICE beam line and Hall construction Main technical uncertainties concern the target, and the PSI solenoid -- thanks to the staging of MICE, damage to the overall schedule is limited -- Funding has made substantial progress (especially in the USA) and the construction process for Phase II elements has begun

MICE FAC Alain Blondel 7 October  MICE Schedule as of October 2007 January 2008 STEP I April 2008 STEP III July 2008 STEP II STEP IV Delivery of 1st FC ~May 2009 STEP V >summer 2009 STEP VI end 2009 (or 2010) major issues: get everything together target installation rate vs beam loss monitors Data taking and data analysis (support for collaborators at RAL) getting SW built AFC module *absorbers* what is the field emission in magnetic field? firm up schedule of step IV/V/VI RFCC module what comes after MICE step VI?

MICE FAC Alain Blondel 7 October NEWS -- 1.Since March 25, Malcolm Ellis is keeping a MICE NEWS page. 2.MICE Installations/commissionning/operations group MICO is now operational. (last meeting on 13 September). Still dominated by locals rather than northern UK or other countries. Weekly MICE installation and MICE planning meetings. MICO this week should concentrate on getting cosmic run ready 3. Fermilab has launched a Muon Collider Task Force for muon collider studies and R&D with funding at similar level as NFMCC 4. EUROnu Design study proposal has been approved. 5. Project management (replacement of Paul Drumm) is now agreed and ready to go

MICE FAC Alain Blondel 7 October Project Manager/Technical Coordinator R. Apsimon (PPD), A. Nichols (STBU) October 2007 MICE Hall Manager/Principal Contractor W. Spensley (ALSTEC) 10 th September 2007 Hall Foremen A. Jamdagni (Imperial), A.N. Other (PPD) June 2007, October 2007 MICE integration physicistMalcolm Ellis ISIS Liaison Officer C. Rogers (ASTeC) 20 th August 2007 Project management (replacement of Paul Drumm) is now agreed and ready to go proposal for PM/TC has been made to collaboration baord

MICE FAC Alain Blondel 7 October Access to MICE by collaborators from abroad It has become more and more evident that running MICE will require people on the site at RAL for extended periods of running. O(6 mo/year) This is beyond the scope of the MICE-UK project. For EU partners there exists the possibility of Transnational Access support by EU Such a proposal is being developed for the next "CARE" proposal (OMIA?) For other collaborators bilateral collaboration agreements should be established. Explicit request has been made in this direction by Chinese colleagues Point was raised to RAL PPD who promised to help

MICE FAC Alain Blondel 7 October Final Comment -- Beyond Phase II Once PHASE II is completed, the MICE hall remains a facility with -- spectrometers, TOF and PID able to measure emittance to MW of 201 MHz RF power MV of RF acceleration -- Liquid hydrogen infrastructure and safety system MICE can become a facility to test new cooling ideas Longitudinal cooling? Lithium lense? ISS cooling cell? Guggenheim? etc etc...