GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.

Slides:



Advertisements
Similar presentations
Mech Systems Proposed EMI Modifications Marc Campell 9/2/03.
Advertisements

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 7.1 Stress Analysis 1 GLAST Large Area Telescope:
GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Mgr’s Meeting October 13, LAT Planning Meeting Mechanical/Thermal Systems October 2004 Marc Campell.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Mechanical Systems Martin Nordby Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Mgr’s Meeting LAT Planning Meeting Mechanical/Thermal Systems March 17, 2005 Marc Campell.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section 4.4 Heat Pipe Design and Analysis1 GLAST Large Area Telescope: Mechanical.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 2.2 Budgets & Metrics 1 GLAST Large Area Telescope:
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
LAT-PR Section 11-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST Large Area Telescope:
Mechanical Integration
GLAST Large Area Telescope:
2K CB FDR Overview:  Agenda, Charge, Review Process
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
1. Introduction and Overview
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope:
Mechanical/Thermal Systems
GLAST Large Area Telescope:
Integration and Test Organization Chart
Introduction and Overview
GLAST Large Area Telescope:
Design Integration and Analysis
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical Systems Peer Review March 27, 2003 Section Management Marc Campell SLAC Mechanical Systems Mgr. Gamma-ray Large Area Space Telescope

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 2 Topics Agenda Organization Work breakdown Personnel Resource Loading

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 3 Organization After Delta PDR, Mechanical Systems group was split –Mechanical Design Integration Systems Engineering & LAT interfaces - Martin Nordby –Mechanical Systems Hardware design, fabrication and test – Marc Campell Mechanical Systems re-organized along hardware lines

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 4 Mechanical Systems

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 5 Work Breakdown Structure Management – Management – Reliability and Quality Assurance Systems Engineering/Design Integration – Mechanical Systems Development (SLAC) – Thermal Systems Development (LM) (remaining effort moved to ) Flight Hardware and Development – Thermal Control System (SLAC) – Radiators, Heat Pipes, and Thermal Testing (LM) – Engineering Modeling (SLAC) – Fabrication, Assembly, and Test (SLAC) Integration and Test Support – LAT I&T Support (SLAC) –4.1.8.A Mission I&T Support (SLAC)

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 6 Mechanical Systems WBS Interfaces GLAST, LAT /.2/.4/.5 Management (SLAC, LM) LAT I&T support (SLAC) Subsystems Mech Parts and Materials (SLAC) Reliability, Q. A. (SLAC, LM) Thermal Modeling (LM) Mech Design Inte- gration (SLAC) Grid development, prototypes (SLAC) Radiator development (LM) Heat Pipe Engin Model (LM) Grid Engineering Models (SLAC) Grid/X-LAT Heat Pipe fab (LM) X-LAT Plate flight unit fab (SLAC) Grid flight unit fab (SLAC) Radiator flight units fab (LM) Grid flight unit ass’y, test (SLAC) TCS protoflt T-Bal test (LM, SLAC) A Mission I&T sprt (SLAC,LM) Thermal Control System (SLAC) Spacecraft LAT Elec Hardware Mech Design Integration I&T Support

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 7 Mechanical Systems WBS Dictionary Mechanical Systems –Perform LAT system-level thermal and structural analysis, and manage system internal and external structural and thermal interfaces. Manage the LAT Mechanical Parts list, and mass and dimensional bookkeeping. Develop, fabricate, assemble, and test LAT Grid support structure, Radiators, and the LAT thermal control system. Support LAT integration and test by maintaining and updating system thermal and structural models through LAT, SC, and LV I&T, and on-orbit check-out Management –Provide subsystem scheduling, cost-accounting, and performance tracking and reporting. Support development of subsystem specifications, plans, and interfaces. Control mass, power dissipation. Support team meetings and project reviews. Travel to team meetings, vendor visits, and integration facilities. This includes management of and by subcontractors. Also includes development of mechanical parts database, and tracking of all parts and materials for the LAT Reliability and Quality Assurance –Provide input to LAT reliabilitiy and hazard analyses. Develop procedures for the fabrication of components and assemblies. Support PHA development. Collect quality records and report to LAT PSAM as needed. Includes subcontractor QA activities Mechanical Systems Development (SLAC) –Perform thermal and mechanical design integration and analysis for the instrument. Design and develop subsystem interfaces, and interfaces with spacecraft. Develop Grid structure, including prototyping and analysis of Grid.

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 8 WBS Dictionary (cont.) Thermal Systems Development (LM) –Perform overall thermal analysis for the instrument. Develop conceptual thermal and structural design of LAT Radiators and Grid heat pipes Thermal Control System –Develop control system for thermal management of instrument, including heater and heater power design, feedback and control system for heaters, and monitoring systems. Procure, fab, assemble, and test on the LAT. Also includes thermal control GSE for bench-testing and during environmental testing (if separate from test GSE) Radiators, Heat Pipes, and Thermal Testing (LM) –Fabricate Heat Pipe engineering model (EM). Finalize Radiator designs after dPDR and fabricate, assemble, and test flight Radiators. Complete detailed design and fabricate heat pipes for flight Grid and X-LAT Thermal Plate. Thermal-balance test proto-flight Radiators and X-LAT Plate, including development of STE and test plan. Support LAT instrument thermal-balance test with in-chamber thermal analysis and predicts and operational support of TCS Engineering Modeling (SLAC) –Develop, fab, and test Grid engineering models and prototypes after I-PDR. Finalize flight Grid interface designs Fabrication, Assembly, and Test (SLAC) –Fabricate Grid, X-LAT Plates, and EMI Shield Box. Supervise fabrication. Develop assembly and inspection plans for Grid/Heat Pipe assembly and qualification testing. Carry out fabrication, assembly and test work for flight Grid. This includes fabricating assembly fixtures and procedures for structural and thermal testing,

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 9 WBS Dictionary (cont.) LAT I&T Support –Support LAT instrument integration and structural and thermal testing. This includes engineering support to resolve interface issues, to update as-built drawings and to perform structural and thermal analysis and testing during LAT integration and test A Mission I&T Support –Support integration to SC and LV, and test activities after delivery of full instrument to SC vendor. This includes engineering and technician support of testing at SC test site. Includes engineering support at SLAC of post-launch check-out.

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 10 Personnel Summary by Discipline Program management Subsystem Manager: Marc Campell (SLAC) Subsystem Program Manager: Linda Roberson (SLAC) Materials Coordinator: Jeff Tice (SLAC) LM Program Manager: Susan Morrison (LM-ATC) LM project controls: Dan Aspiras (LM-ATC) Thermal engineering Thermal Engineer: Jeff Wang (LM-ATC) Lead thermal analyst: Jeff Wang (LM-ATC) Radiator/heat pipe specialist: Jay Ambrose (LM-ATC) Flight hardware development Mechanical engineers: Giang Lam, Bill Olson (SLAC) Lead designer: Joe Stieber (SLAC) Designers: Doug Plaza, Chris Wilder, Jim Stanfield(SLAC) Radiator lead designer: John Cernac (LM-ATC) Lead Technician: Mark Molini (SLAC)

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 11 Personnel Summary by Discipline (cont) Structural engineering Structural analyst: John Hodgson (SLAC) X-LAT structural analyst: Larry Sokolsky (LM-ATC) Radiator structural analyst: Parviz Sharifi (LM-ATC) System Engineering Engineer: Leonard Lee (ONE)

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 12 Resource Scheduling by FY

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 13 Resource Scheduling by FY

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 14 Current Resources NameFTEStatus Marc Campell1on-board Bill Olson1on-board Giang Lam1on-board Leonard Lee1on-board John Hodgson1on-board Mark Molini1on-board Doug Plaza1on-board Joe Stieber1on-board Chris Wilder1on-board Services.5available Total9.5

GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 15 End of Section 1.1