1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.

Slides:



Advertisements
Similar presentations
Presentation #M2 EZ Parking Wontaek Shin (M2-1) Shanshan Ma (M2-2) Nan Li (M2-3) Stage 1: 1/24/2006 Design Proposal Overall Project Objective: Design a.
Advertisements

M3: ProDiver 525 Kavita Arora (M3-1) *Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 4 Feb 04 Size Estimates/ Floor Plan Overall.
//HDL Example 6-1 // //Behavioral description of //Universal shift register // Fig. 6-7 and Table 6-3 module shftreg.
Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 29 Overall Project Objective : Dynamic Control.
Team M1 Enigma Machine Milestone March, 2006 Design Manager: Prateek Goenka Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 01 Overall Project Objective : Dynamic Control.
1 Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation 13: Final Presentation.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 7 MAD MAC th March, 2006 Functional Block.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 22 Overall Project Objective : Dynamic Control.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Huffman Encoder Project. Howd - Zur Hung Eric Lai Wei Jie Lee Yu - Chiang Lee Design Manager: Jonathan P. Lee Huffman Encoder Project Final Presentation.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 27 Overall Project Objective : Dynamic Control.
E-Voting Machine - Design Presentation Group M1 Bohyun Jessica Kim Jonathan Chiang Chi Ho Yoon Donald Cober Mon. Sept 29 System Hardware Component Diagram.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis April 4, 2005 MILESTONE 11 LVS & Simulation DSP 'Swiss.
GPS Waypoint Navigation 525 Team M-3: Nicholas Bannister, Charles Norman, Jeremy Weagley, Julio Segundo, Steve Nielsen Presentation 1: Preliminary Design.
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 4 MAD MAC th February, 2006 Gate Level Design.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 5 MAD MAC nd February, 2006 Top Level Integration.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 3 MAD MAC th February, 2006 Size estimates/Floor.
Lucas-Lehmer Primality Tester Presentation 4 February 15, 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design.
Team M1 Enigma Machine Adithya Attawar (M1-1) Shilpi Chakrabarti (M1-2) Zaven Gabriel (M1-3) Michael Sokolsky (M1-4) Design Manager: Prateek Goenka Week.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage III: February 11 h 2004.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 10 MAD MAC th April, 2006 Top-Level Layout.
Lucas-Lehmer Primality Tester Presentation 5 February 22, 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Sep 15 Overall Project Objective : Dynamic Control.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 8 MAD MAC nd March, 2006 Functional Block.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 5: Feb. 18 th Component Layout Overall Project Objective: Design an Air-Fuel.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 20 Overall Project Objective : Dynamic Control.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: February 4 th 2004.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: 26 th January 2004.
M2: Team Paradigm :: Milestone 5 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
M2: Team Paradigm :: Milestone 4 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage III: February 9 h 2004.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Shiven Seth (W2-5) Presentation 1 MAD MAC st February,
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Mon. Nov. 24 Overall Project Objective : Dynamic Control.
GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 15 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 11 Overall Project Objective : Dynamic Control.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Random Number Generator Dimtriy Solmonov W1-1 David Levitt W1-2 Jesse Guss W1-3 Sirisha Pillalamarri W1-4 Matt Russo W1-5 Design Manager – Thiago Hersan.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 9 MAD MAC th March, 2006 Functional Block.
Lucas-Lehmer Primality Tester Presentation 2: Architecture Proposal February 1, 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques.
Registers CPE 49 RMUTI KOTAT.
ECE/CS 352 Digital System Fundamentals© T. Kaminski & C. Kime 1 ECE/CS 352 Digital Systems Fundamentals Fall 2000 Chapter 5 – Part 2 Tom Kaminski & Charles.
SYEN 3330 Digital SystemsJung H. Kim 1 SYEN 3330 Digital Systems Chapter 7 – Part 2.
Howd - Zur Hung Eric Lai Wei Jie Lee Yu - Chiang Lee Design Manager: Jonathan P. Lee [M2] Huffman Encoder Project Presentation #3 February 7 th, 2007 Overall.
Analog-to-Digital Converters
Presentation transcript:

1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation 5: Top-Level Integration February 20, 2006 Overall Project Objective: Design a chip that navigates an aircraft to pre-determined waypoints.

2 Status Design Proposal Design Proposal Project chosen Project chosen Architecture Proposal Architecture Proposal MATLAB simulated MATLAB simulated Behavioral Verilog written & simulated Behavioral Verilog written & simulated Floorplan Floorplan Structural Verilog written & simulated (except left side due to clock/buffer issues) Structural Verilog written & simulated (except left side due to clock/buffer issues) Accurate transistor count Accurate transistor count Schematic Design Schematic Design Schematic done, not tested completely Schematic done, not tested completely  Layout  Simulations

3 Design Decisions  Accuracy –Latitude and longitude inputs in decimal format (6 decimal places) –GPS ~105 feet to 1 foot  Power –On/Off Power Control for Logic Modules  I/O pins –Reduced from >200 to 74 pins  Clock speed/buffers –Reduced 6 different clock speeds to 4 –All clock dividers depend on input clock to reduce delay –Transistor count went from 6,000  12,000  9,000 –Demux  Serial-Parallel Shift Register  Ripple carry adder  Ripple carry adder –Consume 60,000 times less static power than dynamic power at 1.8V –Added two invertors to comparators with carry outs to strengthen signal

4 Clock Speed  Input –61.44 kHz for input –Serial to parallel => 61.44kHz/30 = 2048Hz  Heading –8Hz for registers before the heading calculation –To observe changes in both longitude and latitude  50 knots = 50*105 feet/min = 5250 feet/480 cyc ~ 11 feet/cyc –Gives accurate direction and speed –Gives accurate direction and speed  Output to Black box –Parallel to serial => 8Hz *30 = 240hz

5 Clock Speed /* Clock converter from 61.44KHz to 2048Hz */ module inputclk (output clk, input clock,rst); wire [4:0] sum,num; reg5 r(num,sum,clock,rst,clk); add1_30 a1(sum,num); and (clk,num[4],num[3],num[2],num[1]); endmodule /* Clock converter from 61.44KHz to 240Hz */ module rclk (output clkr, input clock,rst); wire [7:0] sum,num; reg8 r(num,sum,clock,rst,clkr); add1_255 a(sum,num); and (clkr1,num[7],num[6],num[5]); and (clkr2,num[4],num[3],num[2]); and (clkr,clkr1,clkr2,num[1],num[0]); endmodule /* Clock converter from 61.44KHz to 8Hz*/ module outputclk (output clock8, input clock,rst); wire [12:0] sum,num; reg13 r(num,sum,clock,rst,clock8); add1_7680 a(sum,num); and (clock8,num[12],num[11],num[10],num[9]); endmodule /* Counter for Blackbox */ module counterr (output [29:0] ar, input clkr,clock,rst); wire [4:0] sum, numr; reset rcl(reset,clock,rst); reg5 r(numr,sum,clkr,reset,rest); add1_30 a(sum,numr); andnum an(ar,numr); and (rest,numr[4],numr[3],numr[2],numr[0]); endmodule module reset (output sto, input clock,rst); wire [8:0] sum,num; reg_9 r(num,sum,clock,rst,sto); add1_511 a(sum,num); and (clkr1,num[7],num[6],num[5]); and (clkr2,num[4],num[3],num[2]); and (st,clkr1,clkr2,num[1],num[0]); xor (sto,st,num[8]); endmodule

6 Serial - Parallel Shift Register

7 Ripple Carry Adder

8

9 Overflow Case Problem : Flying over the border +180 to -180 Solution : if either longitude is negative and it’s close to the border, add 360 to the negative value

10 Block Level System Diagram

11 Transistor Estimates Component Last Count Recent Count FSM SRAM Registers/Buffers Speed Comparator Angle Comparator Altitude Comparator Waypoint Comparator Heading Calculator Distance Calculator Speed Calculator Total20,10024,540

12 SRAM

13 Problems  Over flow cases = transistor counts BOOM!  Clock delay causes problems… –Different reset times  fsm  sram  counter (Parallel-Serial to blackbox) –Transistor count

14 What’s Next… Here’s what’s on our agenda for next week…  Finish testing Schematics  Creating Module Layout

15 Questions? Comments? Ideas?