RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004.

Slides:



Advertisements
Similar presentations
LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Advertisements

M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
IFR-LST status report G. Cibinetto INFN Ferrara Babar Collaboration Meeting, Feb. 21, 2004 Milestones LST production status 1 st module assembled Princeton.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
C. Lu, RPC System Installation Workshop, 6/11/2009, CUHK 1 1 RPC gas system installation (step by step plan) (CUHK, 6/11/2009) Changguo Lu, Kirk McDonald.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing.
May 4, 2004Bill Wisniewski1 Installation Review. May 4, 2004Bill Wisniewski2 Charge ( W. Althouse, G. Bowden, W. Innes(chair), J.Weisend, (D. Nelson))
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
ZTF Interconnecting Scheme Stephen Kaye
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
RPC (Barrel) Cabling summary. Signal cable specifications Signal Cables (two possibilities): –Loose pair round and twisted pairs (with flat zone for crimping.
Page 1 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (1) Excellent job on preparing and presenting review Overall, the Committee feels that the.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
LST Upgrade LST Upgrade Readiness Review William Sands, Princeton University,
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
Integration and Services RE3/1 and RE4/1
Markus Friedl (HEPHY Vienna)
Preliminary thoughts on SVT services
Integration and Services RE3/1 and RE4/1
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
First of all we will remind some numbers:
Pierluigi Paolucci - I.N.F.N. Naples
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
LST Module Installation
Pierluigi Paolucci - I.N.F.N. Naples
RPC and LST at High Luminosity
Overview of T1 detector T1 is composed by 2 arms
Limited Streamer Tube Project Summary
Presentation transcript:

RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004

P.Kim2 BRIEF OVERVIEW SPACE ISSUES –Where Do All the Cables Go? Cable Routing inside the Sextants Cable Routing Around the Detector Cable Routing to Outside Shielding Wall –Where to Mount the New Racks? RPC Infrastructure Remains –Top/Bottom Sextants installed in 2004, Side Sextants in 2005 –Cylindrical RPC & ENDCAP RPC Operational after 2005 –Must Not Disturb BABAR Detector Components SCHEDULE ISSUES Can We Meet 2004 Schedule

May 5, 2004P.Kim3 LST High Voltage System HV Distribution (Baseline Design) –HV Supply located above Electronic Hut outside Shielding Wall (Racks No. 35, 36, 37) –One HV Cable (10-wire or 20-wire Kerpen) for each LST Module –Total of 564 Cables (94 Cables in each Sextant) –No Distribution Boxes near BABAR: Long Cables (25-35 m) “Warner Connectors”: Simplifies Cable Installation Cable Trays & Cableways –HV Cables need to be Separated from Other Supply Lines –New Cable Tray under the Shielding Wall -> New Opening –New Cableways to run HV cable from Central BABAR Cable Ways to Middle of Each Sextant Inside Each Sextant –Top/Bottom Sextants: Use Open Space Either Side of CENTER PLATE –Side Sextants: Use existing Black Box in the Middle

May 5, 2004P.Kim4 HIGH VOLTAGE SUPPLY BABAR Detector Electronic Hut RPC HV Supply LST HV Supply

May 5, 2004P.Kim5 HV CABLE ROUTING

May 5, 2004P.Kim6 New Opening in the Shield Wall 8 x 24 Cable Trays Radiation Safety O.K.

May 5, 2004P.Kim7 New Platform Near Shield Wall Plan View East Elevation

May 5, 2004P.Kim8 New Platform Design and Installation: M. Cramar –Design Near Complete; Submitted for Earthquake Safety Review Approval Expected Soon => Order Steel and Fixtures –Will Use Outside Vendor for Installation –Preassemble Platform and Make Mounting Hole Template before Aug. Shutdown Install During Aug. 7 – 13 Drill Mounting Holes (20): ½ Day Mount Platform Using Crane: 2 Hours Install HV Trays, Ladder, and Support Structures: 2-3 Days Racks Install and Electric Conduits: 2-3 Days (parallel)

May 5, 2004P.Kim9 Bottom Sextant

May 5, 2004P.Kim10.

May 5, 2004P.Kim11 View of Side Sextant (2005) Side Plate Goes Back in Here

May 5, 2004P.Kim12 Open Black Box Signal Readout Cable Box (2” Wide, 5” Deep) Signal Readout Cable Box (2” Wide, 5” Deep) Space Available for LST HV Cable (6” Wide, 5” Deep) GAS Tubes Goes Here

May 5, 2004P.Kim13 HV System and NEC New Cable Tray Design O.K. by SLAC Electrical Safety Committee (Perry Anthony) Cable Tray Loading Capacity Specifications Signal Cables: 60% of the available cross sectional area Power Cables: 50% of the available cross sectional area (Power Cable = Voltage of 50 V and higher, OR amperage of 10 A or more) We have conductor Kerpen cables: mm** conductor Kerpen cables: 3420 mm**2 Tray Size = 24” x 7” (but only up to 6” can be used for this calculation) => 24” x 6” = mm**2 FILL RATE = 40.6 % Cable Trays In/Around BABAR Detector are Immune because BABAR is an APPLIANCE!

May 5, 2004P.Kim14 High Voltage Cable KERPEN 6 kV HV Cable Zero Halogen, Frame Retardant Polymer Sheath Diameter: 9.1 mm for 10-conductors 10.7 mm for 20-conductors Minimum Bending Radius = 6 x Diameter Tinned copper, Flexible stranded Conductors (0.16 mm diameter)

May 5, 2004P.Kim15 Status of HV Related Tasks HV Distribution Box –Sun Workstations being removed for Distribution boxes, this week –First HV Distributions Crates under test at OSU –Cables to RPC HV supply and control lines, cable strain relief work still to be done. HV Cables HV cables for 2 Sextants in 2004 delivered OSU/CSU making Cables including In-line Connectors Cable Trays –Cable Trays has been ordered. Delivery on May 5. –Tray Install Outside Shield Wall will start soon. M. Cramar meeting Outside Vendor on May 5.

May 5, 2004P.Kim16 LST Gas System Gas Distribution –Reuse Rack space on Top of BABAR, currently occupied by RPC Crates. Enough empty slots for 2004 –New Gas Manifolds, but Reuse RPC Bubblers/Flow meters –LST Gas will be NON-FLAMMABLE Re-Use RPC Teflon Tubes –Need to install 60 more lines (228 for RPC; 288 for LST) –RPC Tubes going to the Front Side need to be Rerouted (LST Gas Tubes go to Backward Side only) Polyflo Tubes –Teflon/Polyflo Connections –Two Bundles of 24 Polyflo Tubes (Input & Output Lines) for each Sextant

May 5, 2004P.Kim17 ReUse RPC Gas Tubes TEFLON Gas Supply TubesTEFLON / POLYFLO Connections Backward Side Front Side TEFLON POLYFLO

May 5, 2004P.Kim18 LST Electronics Readout BASELINE DESIGN –Z-Strip Signal Read out from the Back Side 1152 Channels per Sextant –Phi Signal Read out from the Front Side 758 Channels per Sextant –AMPHENOL Twisted/Flat Readout Cable –Preamps on FEC, Not on the LST Module –7 Crates for Z Signals and 6 Crates for Phi Signals –Output Digital Signal to DAQ via Optical Fibers CRATE Features – VME Standard 6U High (26.5 cm); 19” Wide, 55 cm Deep –Allow 9U including Fan and extra 3U for air deflectors –Racks are all ordered and the last one shipped yesterday

May 5, 2004P.Kim19 Racks at ESA 11U Rack 24U/36U Racks

May 5, 2004P.Kim20 Amphenol Readout Cable MicroribbonTwitst/Flat Cable 17 Twisted Pairs Shielded & Jacketed Halogen Free Sheath Diameter at Round Section: 0.75 cm 96 Phi Cables / Sextant 72 Z Cables / Sextant  Enough Room in Two 5 cm x 12 cm Cable Boxes / Sextant

May 5, 2004P.Kim21 RACK LOCATIONS Keep the Racks Close to LST Modules –Deterioration of Raw Signal over Distance –Higher Background Noise Pick Up over Distance Space Considerations –Allow Access to Other Parts of BABAR Detector, Endcap Doors, Earthquake Braces, etc. –Cooling Fans / Air Circulation –Easy Removal and Install of FEC, Fans, Power Supply

May 5, 2004P.Kim22 Electronic Rack Locations on the Forward Side 2004 New Platform HV Cable Tray

May 5, 2004P.Kim23 Electronic Rack Locations on the Backward Side

May 5, 2004P.Kim24 Top/Backward Crates On a Movable Platform Side by Side Design for Height Clearance All Parts Delivered/Fabricated. Ready for Assembly A. Constable

May 5, 2004P.Kim25 Artist’s Version of Cabling from Gigi/Angelo

May 5, 2004P.Kim26

May 5, 2004P.Kim27 IFR DAQ Crates Re-Use Existing 4 RPC DAQ Crates Replace Top/Bottom RPC Cards with LST IFB Cards Unused Extra Card Slots Available Make Cable Connections BEFORE Doors Open Use Existing Optical Cables (Control & Signal) from DAQ Crates to BABAR DAQ System Control Cable Length Between FEC and DAQ Crates must be the same for ALL CHANNELS (19 m for RPC) MAKE CONTINGENCY TO CABLE LENGTHS SO WE CAN MOVE DAQ CRATES IN 2005

May 5, 2004P.Kim28.

May 5, 2004P.Kim29.

May 5, 2004P.Kim30 CRITICAL PATH DATES AUG 3 –DAY Shift Only Time Available for Access before DOORS OPEN (3:30 PM) –ALL RPC Work in the Area Hidden by Doors must be completed –LST IFB Board Install in BDAQ Crates and Cabling MUST BE FINISHED AUG 14 –Bottom Sextant LAYER-18 Module Installation –Shielding Wall disassembled on Aug. 7 –New Platform and HV Cable Tray Installed (Estimated time: 3 days) –Racks/Crates for Bottom Sextant installed and Checked out –HV Cables and Gas Lines for Layer-18 AUG 23 –Rest of Bottom Sextant LST Module Installation Begins –All Utilities & Readout System For Bottom Sextant Ready

May 5, 2004P.Kim31 MANPOWER TRAY and New Platform Install Use Outside Vendor, Contact Person: M. Cramar Cable/WireWays Install P Kim, H Rogers, C. Nix, S. Swain, S. Fan (Group E) + Gibson Locke Electrical Install Sam and EFD Crew Cabling and QC LST Module Install Shifters, INFN Electronics Group

May 5, 2004P.Kim32 SUMMARY Design Work for 2004 Install Mostly Complete Parts for HV/Gas/Electronics Ordered and Being Delivered Daily Preparing for Pre-Installation of Components that Can be done Before Aug. Shutdown Working on Detailed Schedule During the 1 st 10 Days with Jim K. Working Toward the Goal of Complete QC TEST of Modules using FULL DAQ System during LST Installation