Period Run Coordinator Shift Guide Period Run Coordinator Shift Guide Updated on 26.03.2010 1PRC Guide.

Slides:



Advertisements
Similar presentations
CWG10 Control, Configuration and Monitoring Status and plans for Control, Configuration and Monitoring 16 December 2014 ALICE O 2 Asian Workshop
Advertisements

André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
CSC Online and Offline DQA Status Ken Johns, Venkat Kaushik, Xiaowen Lei (U. Arizona)
Suggestions :  All the Webpages should possibly be visualized entirely without scrolling  The first page should be a « welcome page » with only few links.
First year experience with the ATLAS online monitoring framework Alina Corso-Radu University of California Irvine on behalf of ATLAS TDAQ Collaboration.
PARENT ORIENTATION WELCOME TO THE ADVANCED LEARNING ACADEMY! Lets spend some time together getting familiar with the tools, teachers and feel of Virtual.
1.Shifter Intro 1. Introduction 2. Pit Area 8 – LHCb 3. Control Room 4. Cavern 5. Access to Cavern 6. Shift Organization 7. Safety 8. Calling Experts 9.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
TOOL MANAGEMENT INTRODUCTION
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
5. Data Manager 1. Introduction 2. Data Manager Duties 3. Quality Checking 4. Problem Reporting 5. Data Monitoring 6. Histogram Presenter 7. Trend Presenter.
Muon Piquet Training. Intro - Disclaimer  This presentation is not intended to be a complete description of the system but a guide, possibly simple,
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
Web Based Monitoring DT online shifter tutorial Jesús Puerta-Pelayo CIEMAT Muon_Barrel_Workshop_07/July/10.
PPD Computing “Business Continuity” David Kelsey 3 May 2012.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Offline shifter training tutorial L. Betev February 19, 2009.
CAF shifts and procedures Marcello, Raffaello, Alberto, Pigi, Sungeun, David, Silvia, Anna & all the 2009 shifters.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
Click to add Text L. CONEY1 MICE Shifter Training June 2015.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
DQM status report Y. Foka (GSI) Offline week from pp to PbPb.
F.Carena, CERN/ALICE The ALICE Experiment Control System F. Carena / CERN-PH.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Muon Shift Organization Outline Class 1 Atlas Control Room Shifts Booking Present Status + Experience+ Feedback Class 2 reminder A. Polini & Z. Yan May.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
MG, YWB and CS 1 Alice Shift model for 2009 Shift model for the global subsytems (HLT,DCS,ECS,CTP,Offline) Shift model for the detector subsytems : MTR+MCH.
Board of Advisors for People continuing in 2 nd year of their term 4 People rotating off the board Must be a member of the Board.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
K. Jon-And, Stockholm University1 Tilecal Team 5 meeting 8 November 2005.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
6. Shift Leader 1. Introduction 2. SL Duties 3. Golden Rules 4. Operational Procedure 5. Mode Handshakes 6. Cold Start 7. LHCb State Control 8. Clock Switching.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
22 March 2010 DCS workshop C. Bortolin, g. de cataldo and A. Franco INFN it/CERN CH 1 Progress on LHC data exchange LHC-ALI_DCS project overview Future.
Alignment in real-time in current detector and upgrade 6th LHCb Computing Workshop 18 November 2015 Beat Jost / Cern.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
CSC Shifter Training Course – Global Running Fred Borcherding Reach from CSCOperations Twiki page or directly:
Control Room and Shift Operations: CMS Greg Rakness (CMS Deputy Run Coordinator) University of California, Los Angeles ATLAS Post-LS1 Operations Workshop.
1.Shifter Intro 1. Introduction 2. Pit Area 8 – LHCb 3. Control Room 4. Cavern 5. Access to Cavern 6. Shift Organization 7. Safety 8. Calling Experts 9.
The NA62RunControl: Status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 10/06/2015.
CMS Communication plan for stable beams Preliminary plan 21 April 2016.
1 Regional Hospital Full Scale Exercise CONTROLLER EVALUATOR GUIDE.
M. Caprini IFIN-HH Bucharest DAQ Control and Monitoring - A Software Component Model.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
General online meeting SLAC Nov 4, 1999 G.Crosetti, M.Lo Vetere, E.Robutti IFR online calibrations status and plans.
Muon Piquet Training: General Informations March 8-th 2016.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
P. Kuijer1 System run coordinator meeting
F. Bellini for the DQM core DQM meeting, 04th October 2012
Test beam check list Michael JECKEL EN-EA-EC.
ALICE moves into warp drive
Shift instructions August 16, 2017 Antoni Aduszkiewicz
Offline shifter training tutorial
Experience between AMORE/Offline and sub-systems
Offline shifter training tutorial
Shift Leader Tutorial Made by : Maria Chamizo Andrea Barisone
TE-EPC PIQUET BAD MANIPULATION
Presentation transcript:

Period Run Coordinator Shift Guide Period Run Coordinator Shift Guide Updated on PRC Guide

you are registered at CERN, have access rights to the ACR (and cafeteria), and wear a CERN cell phone you have sufficient overlap with previous PRC get familiar with the experiment and its systems grasp the style of the (short) daily meeting learn about book-keeping (minutes, runs, etc) attend a 14:00 LPC meeting in CCC you get keys for PRC office you decide if you wish to be ‘coffee coordinator’ well in advance if you are too tired, ask the RC for a break 2PRC Guide Before your period starts

detector subsystems and their coordinators DCS, DSS, handshakes, alarms, RP veto, SLIMOS duties, access formalities (access issues are TC matters!) ECS: runs, partitions, locks Accumulated data, beam intensities, etc CTP: configuration, trigger clusters, trigger classes Filling schemes, machine jargon (see list of LHC acronyms on RC website) communication with CCC communication with RC, SL, SRC, and shifters 3PRC Guide Get use to…

ALICE How are you embedded in RC SL ECS/DAQ SRC 4PRC Guide DCS Offline HLT CCC Piquets RC PRC DQM

attend the daily LPC meeting in (CCC) at 08:30 (working days) and 09:00 (weekend)  report to SR collect information from and inform SRC chair the daily RC meeting at 17:30 write and send daily RC minutes (post it in eLogbook, too) keep planning and statistics files up-to-date and post them on the web you may attend the trigger meeting. Useful links at attend weekly LPC meeting on Monday at 14:00. Material can be found at 5PRC Guide Tasks I

be present in ACR major part of the day and evening shifts keep track on subsystem and machine status (LHC websites). Transfer information to SRC setup and ensure, with SL, accomplishment of running plan check and ensure that data-taking is going according to plan communicate fluidly with SLs replace SL if necessary mind for a pleasant working atmosphere in ACR and WRs 6PRC Guide Tasks II

7PRC Guide Location of shifters in ACR

ACRALICE control room ACTALICE configuration tool CCCCERN Control Center DCSDetector Control System ECSExperiment Control System ERPEarly Run Partition FSMFinite State Machine LPCLHC Program Coordinator RPERadiation Protection Expert RCRun Coordination SLShift Leader SLIMOSShift Leader In Matters of Safety SMSShift management System SORStart of Run SRCSubsystem Run Coordinator TDIBeam Absorber for Injection (Internal) TEDBeam Absorber for Injection (External) UX25Main underground cavern WRWorking Room 8PRC Guide List of acronyms

ALICE RC LPC LHC project … 9PRC Guide Useful websites