R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University.

Slides:



Advertisements
Similar presentations
STEEL PLATES AND SECTIONS
Advertisements

Structural Steel Construction
Objective Define tools and materials used in agricultural engineering careers.
FORMWORK Prof Awad S. Hanna.
Mast Storage Rack NNSY Sean Ellis, Philip Crist, Max Carpenter, Gershom Obeng.
NCSX Machine Platform FDR June 15, 2005 Erik D. Perry.
MILLING.
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
Designing an Air-Propulsion System Presentation by – Jacob Griffin Advisor -Dr. Junkun Ma Senior Design Teacher -Dr. Cris Koutsougeras.
Impression tray and impression technique
Specification section 3.3
Week 5 Design Lab. Review of Rocket Project Convergent and Divergent thinking Dixon’s Taxonomy.
Using the EDP to Design a Fluid Powered System ENGR 8-4, Lesson 3 Syringe Crane Challenge Written by Roland Williams.
Advantages of Lattice Towers
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
The Super Scooper: Self Scooping Wheelbarrow
Structural drawing Instructor: M.Yaqub
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
Mechanisms Paul Ventimiglia WPI Student, Team 190.
Senior Design: Validation of Design December 15, 2008.
Foundations of Technology Mechanical Advantage
APPENDIX A (RFI) FOR THE FABRICATION OF MULTIPLE STEEL REACTION STRUCTURES FOR NASA-MSFC STRUCTURAL TESTING Mike Roberts 12/2/09.
Jerid Sutton Daniel Smith.  To prove an already employed analysis tool, improve it, or create new analysis tools for joints and fasteners. In doing this.
Lesson No. 11 Week No. 07 Name of lesson Marking Tools
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
Morin Flexo Printing Technologies Philip Morin 61 East Main Street Forestville, CT Tel/Fax:
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
U3d-L8 2 nd Semester Participation Policy 31 JAN 2011 Participation is 15% of quarter grade Lose points for –Coming to class late –Talking without raising.
D. Jason Koskinen FNAL Collab 12/ Geant4 NuMI Monte Carlo Uncertainties.
POE FINAL EXAM REVIEW Spool-White Fall 2013.
Basic Machinery & Quality Instruments INJECTION MOLDING MACHINE High Production Machinery Materials- Plastics Has a custom metal mold Precision equipment.
ET 493 Instructor: Dr. Koutsougeras By Rhett Falcone and Scott Dauzat Advised by Dr. Mitra.
Extra Examples.
INTRODUCTION ADJUSTABLE MECHANICAL STILTS INTRO PROBLEM DESIGN TESTING
CON 4003 Construction Estimating Prof R. V. Locurcio.
NUMI Transmission Line (TL) Review: Design Details TL through Block & Beyond Design/Status Bill Boettinger FNAL April 23, 2003.
UKNFIC meeting, 20 Oct 2005 – From Physics model to Engineering model Peter Savage From Physics model to Engineering model.
Structural Drafting Connection Details and Gages.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
The Dream Team: Sean Keefe, Lucien Filip, Aaron Alves, Manuel Boria, Matt Baxter
Fundamentals of Structural Detailing
P13458: Dresser-Rand Compressor Assembly Line Team Members: Lauren Kraft –Project Manager, Nick Feng – IE Cole Bowden – ME, Shawn Moseley – ME Jordon Boggs.
Where have you seen an inclined plane used before? January 5, 2009 DRILL U3d-L8.
U3d-L6 Complete back of your 3D worksheet.. 2 ft 2 ft U3d-L7 2.A gardener is capable of applying 50 lbs. to lift a wheelbarrow. His hands are placed 4.
MAST STORAGE RACK Philip Crist Max Carpenter Sean Ellis Gershom Obeng.
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
CON 4003 Construction Estimating Prof R. V. Locurcio.
BASICS OF UK DETAILING. BS Codes : 1) Design code: BS8110 2) Detailing codes: BS8666 BS4449.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
Problem Statement/Constraints Design Options Design selection Design layout Analysis Fabrication Testing Results Recommendation Concluding Remarks.
LHCb Radiation Shielding Wall – Lifting Tool Overview.
ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN.
Forklift pick set-up interfacing with a MCHP
Structural Steel Construction
Tool Identification. TURNING TOOLS Turn nuts, bolts, and screws.
Structural drawing.
Escalator Installation
FORMWORK DR. Nabil Dmaidi.
Tilt N’ Store Design Analysis
Grout and Other Reinforcement Module
Chapter : 01 Simple Stresses
Equilibrate System upgrade
Overview and Horiz uncoupled vib
CONNECTION Prepared by : Shamilah
Tilt N’ Store Design Analysis
Ag Mechanics Tools.
STEEL PLATES.
Valve stem “gag” mechanism
Sterling Industries.
Inventory Measurement Tutorial
Presentation transcript:

R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University

ME ROWAN 2 R Design Problem Design, analyze, fabricate, and test an overhead crane to lift heavy weights.

ME ROWAN 3 R Primary Specifications To lift a weight, quickly:  >400 lbs,  >24 inches in elevation  < 4 seconds Weight = 70lb Diameter = 24”, Thickness = 0.5” # of plates = 20 Up to 1400lb!

ME ROWAN 4 R Main Crane Column  Main Crane Column  6” construction- grade I beam  Structural steel  0.5” pin-holes 2” apart along edge  Base  Structural steel  C-channel

ME ROWAN 5 R Crane Pivot & Stopper Pivot axis Column Stopper

ME ROWAN 6 R Pick-up Reel  Diameter = 3”

ME ROWAN 7 R Pulley  Diameter = 6”

ME ROWAN 8 R Timer Circuit  Your design must include a timer circuit capable of measuring and displaying weight lift time during the 24-inch travel from the initial elevation to the final elevation.  An official time circuit will be used simultaneously

ME ROWAN 9 R Structural Materials  Aluminum  75 in 3 of 2024-T3 in various sizes  No dimension exceeding 48”  Plastic  50 in 3 of TIVAR UHMW in bar stock  Volume constraint is measured before any drilling or other material removal operation, i.e., pre-machined

ME ROWAN 10 R Miscellaneous Supplies  Miscellaneous supplies such as pulleys, pins (with pulley spacer blocks and shims), nuts, bolts, and other minor parts will be available.  Tools will be supplied, but it will be more convenient if you carry your own.  You will be able to use project lab.  You will use various machines to fabricate the parts.

ME ROWAN 11 R Performance Formula  P: Performance Index  W: Weight being lifted  h: Height reached  t: Official time  t m : Time measured with your timer circuit  LCA: Life Cycle Assessment Eco-indicator points  PW: Present worth

ME ROWAN 12 R Important Dates  Sept. 30: Preliminary Design Proposal  Oct. 14: Machining Starts  Dec. 2: Preliminary Testing  Dec. 9: Final Testing!

ME ROWAN 13 R A Background Survey ?