11/29/20041 Network Planning Task Force “Consensus Building: Preliminary Rate Setting”

Slides:



Advertisements
Similar presentations
1 NETWORK PLANNING TASK FORCE August 2, 2004 “SUMMER FOCUS GROUP SESSION ”
Advertisements

October 16, Network Planning Task Force Information Security Strategy.
TUITION & FEE PROPOSAL (Revised) Recommendation to The University of Texas Board of Regents (Revised) Recommendation to The University of Texas.
1 NETWORK PLANNING TASK FORCE FY’06 “ Final Session – Setting the Rates” 12/5/05.
Larry Conrad October 14, Issues with Current Comm Tech Funding Model Based on phone service only…no networking charges Revenues generated from bundled.
1 NETWORK PLANNING TASK FORCE November 15, 2004 FALL FY 2005 MEETINGS “STRATEGIC DISCUSSIONS”
1 NETWORK PLANNING TASK FORCE November 01, 2004 FALL FY 2005 MEETINGS “OPERATIONAL DISCUSSIONS”
1 NETWORK PLANNING TASK FORCE August 16, 2004 SUMMER FOCUS GROUP SESSIONS “SETTING THE AGENDA”
1 NETWORK PLANNING TASK FORCE “ SUMMER PLANNING SESSIONS ” 8/01/05.
1 11/21/05 NETWORK PLANNING TASK FORCE FY’06 Final Strategy Meeting.
Network Planning Task Force Strategy Discussions.
1 NETWORK PLANNING TASK FORCE September 20, 2004 FALL FY 2005 MEETINGS “OPERATIONAL BRIEFING”
CNIL Report April 4 th, CNIL Report (Apr 4 th, 2005) Two Major Goals: –Improvement of Instructional Services –Strengthening research IT infrastructure.
NPTF Wireless Discussion. 3/3/20032 Agenda Goals Strategy Current status Future plans Challenges Options.
1 NETWORK PLANNING TASK FORCE FY’06 Network Strategic Discussions 11/7/05.
12/1/20031 Network Planning Task Force “Consensus Building: Preliminary Rate Setting”
Network Planning Task Force Special Spring Session.
1 NETWORK PLANNING TASK FORCE FY’07 “ Setting the Rates” 11/20/06.
11/17/031 Network Planning Task Force Strategic Discussions.
IACC-ITS.PPT June 1, 2001 Communications and Computing Services Johanna Madjedi IACC-ITS Joint Meeting June 1, 2001.
1 NETWORK PLANNING TASK FORCE “ SUMMER PLANNING SESSION ” 08/21/06.
Data Centers and IP PBXs LAN Structures Private Clouds IP PBX Architecture IP PBX Hosting.
Treasurer Paul Andersen. Summary 2011 Draft Financial Results 2012 Q1 Unaudited Results Reserves Fees.
1 NETWORK PLANNING TASK FORCE Fall Agenda Setting and Focus Group Planning
PBS TeacherLine Post Grant Plan August 19, 2010 Tim Taylor.
FY ‘08 NETWORK PLANNING TASK FORCE Fall Agenda Setting and Discussion
FY Budget Overview October 4, 2012 CONFIDENTIAL – INTERNAL USE ONLY.
Office of Financial Planning October 2009 FY Budget Preparation.
Network Background August Topics  Services  Connected Institutions  Architecture  Operations  Finances/Co-pay  Looking Forward  Services.
1 Faculty Council IT Committee C-13 February 4, /4/2010.
Some aspects of Library Technology Infrastructure in the US and Japan Tim Deliyannides & Takeshi Kuboyama
::1:: ResNet 2008 ResNet Changes at Indiana University Changes for the Last 2 Years and for the 2008 Fall Move-In.
Natick Public Schools Technology Presentation February 6, 2006 Dennis Roche, CISA Director of Technology.
Centralized Management Services Dawn Malinowski Wisconsin Public Power Inc Sun Prairie, WI.
1 Draft NYISO 2003 Budget Report BS&P Report to Management Committee October 16, 2002.
Communications Pool FY ’06 Marla Meehl Friday, 10/21/05 NETS – Network Engineering & Telecommunications Section Enterprise Services Computer Security.
BUDGETING – CRADLE TO BOARD AT THE UNIVERSITY OF OTTAWA CAUBO – Pre-conference June 23, 2007.
Natick Public Schools Technology Update January 26, 2009 Dennis Roche, CISA Director of Technology.
FY ‘08 NETWORK PLANNING TASK FORCE Strategy Discussions
Cal State San Marcos Budgeting 101 University Budget Committee September 12, 2008.
Natick Public Schools Technology Update April 23, 2007 Dennis Roche, CISA Director of Technology.
Top Issues Facing Information Technology at UAB Sheila M. Sanders UAB Vice President Information Technology February 8, 2007.
Technology Coordinating Team.  1.The Technology Coordinating Team will determine technology strategic initiatives (4-year technology plan)
1 NETWORK PLANNING TASK FORCE “ FY ’06 FALL SESSIONS ” 10/03/05.
Update on Campus Networks December 2009 Bruce Campbell Director, Network Services Information Systems and Technology.
ABA Management Council September 15, UBAC Considerations –Strategic Goal #1 Meet Enrollment Targets –Recruit New Students –Class Schedule Supports.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
NPTF Planning Session 6 April FY ‘10 NPTF Members 2  Robin Beck, ISC  Michael Palladino, ISC (Chair)  Mark Aseltine /Amy Phillips, ISC  Gary.
NPTF Strategy Session May FY ‘10 NPTF Members 2  Robin Beck, ISC  Michael Palladino, ISC (Chair)  Mark Aseltine /Amy Phillips, ISC  Gary Delson.
NUOL Internet Application Services Midterm presentation 22 nd March, 2004.
Natick Public Schools Technology Update October 6, 2008 Dennis Roche, CISA Director of Technology.
OCFO - Financial Status of USPTO May 7, FY 2010 Status Authorized level of $1,887.0 million Mid-year Budget Execution Review currently underway.
ORGANIZING IT SERVICES AND PERSONNEL (PART 1) Lecture 7.
Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity.
City of Peachtree Corners Preliminary Expenditure Review May 22,
FY ‘08 NETWORK PLANNING TASK FORCE Rate Setting
12/15/20031 Network Planning Task Force “Consensus Building: Final Rate Setting for FY ‘05”
NETWORK PLANNING TASK FORCE FY ‘08 Planning Session I 1.
FY PROPOSED BUDGET  A "Target Level" expenditure base was established for all departments six- months’ worth of operations (July 1, 2016 – December.
6/13/20161 South Seattle Community College College-wide Meeting Budget Planning for FY March 10, 2008.
Campus Data Storage & Services Task Force Update IT Pro Forum 9 November 2011.
ALPA Information Technology Conference November 16-18, 2005.
© 2003, Cisco Systems, Inc. All rights reserved. 2-1 Campus Network Design.
Overview and Discussion Proposed Budget Fiscal Year-End June 30, 2016.
Review of 2016–2021 Strategic Budget Plan Development Process and 2016 Budget Assumptions Financial Administration and Audit Committee April 14,
Strategy for Complex Networking, IT, & Telecommunication Decisions
Sheryl Loesch Swakopmund, Namibia October 17, 2017
Information Technology (IT) Department
SCSU Technology Update FY05
About PennNet Redundant Gigabit Ethernet Core
Presentation transcript:

11/29/20041 Network Planning Task Force “Consensus Building: Preliminary Rate Setting”

11/29/20042 NPTF FALL ’05 MEMBERS ■ Mary Alice Annecharico / Rod MacNeil, SOM ■ Robin Beck, ISC ■ Chris Bradie/Dave Carrol, Business Services ■ Cathy DiBonaventura, School of Design ■ Geoff Filinuk, ISC ■ Bonnie Gibson, Office of Provost ■ Roy Heinz / John Keane/ Grover McKenzie, Library ■ John Irwin, GSE ■ Marilyn Jost, ISC ■ Deke Kassabian / Melissa Muth, ISC ■ Doug Berger/ Manuel Pena, Housing and Conference Services ■ Mike Weaver, Budget Mgmt. Analysis ■ Dominic Pasqualino, OAC ■ Kayann McDonnell, Law ■ Donna Milici, Nursing ■ Dave Millar, ISC ■ Michael Palladino, ISC (Chair) ■ Dan Shapiro, Dental ■ Mary Spada, VPUL ■ Marilyn Spicer, College Houses ■ Steve Stines / Jeff Linso, Div. of Finance ■ Andrew Selden*, PCBI ■ Ira Winston / Helen Anderson, SEAS, SAS, School of Design ■ Mark Aseltine/ Mike Lazenka, ISC ■ Eric Snyder*, Vet School ■ Brian Doherty*/John Yates*, SAS ■ Richard Cardona*, Annenberg ■ David Seidell, Wharton ■ James Kaylor, CCEB * New Members in FY’05

11/29/20043 MEETING SCHEDULE – FY ‘05 ■ Summer Focus Groups ■ July 19 ■ August 2 ■ August 16 ■ Fall Meetings ■ September 20 Operational Briefing (Non-financial) ■ October 18 Strategic Discussions (Security) ■ November 01 Operational Discussions ■ November 15 Strategic Discussions ■ November 29 Financial Discussions ■ December 6 Consensus/Prioritization/Rate Setting

11/29/20044 NPTF FY ’05 Progress to Date ■ Challenged and reaffirmed NPTF process. ■ Refreshed NPTF principles. ■ Updated FY ’05 – ’09 planning assumptions. ■ Prepared 5 year N&T budget. (Summer Submission) ■ Held 3 summer focus groups and many 1-1 meetings with schools/center computing directors to gather customer feedback. ■ Set the Fall Agenda. ■ Operational Briefing ■ Security Briefing ■ Strategic Discussions

11/29/20045 Today’s Agenda ■ Discuss revised assumptions ■ Share cost-cutting measures ■ Show N&T 5-year cash flow ■ Show draft FY ‘06 rates ■ Discussions and voting on new initiatives ■ Preliminary rate setting

11/29/20046 Budget Assumptions ■ Security concerns continue to be a high priority as various viruses, worms, etc. have reduced Penn’s productivity levels. However no new monies are being requested for FY ’06. ■ 5 year phase-out of allocated monies ($2.317M) to occur from FY ■ Telecommunications surplus, operating efficiencies and increased costs to offset allocated cost phase out. ■ Aggregate PennNet, Telecommunications and Video service rate increases projected at 1-2% maximum yearly, determined in conjunction with NPTF.

11/29/20047 Budget Assumptions (Continued) ■ Excellent bandwidth management techniques combined with a good Internet strategy have eased the pressure on developing tiered network connectivity options. However, this will continue to be explored and evaluated as the need/opportunity arises. ■ Separate SLAs for College Houses and Greeknet for maintenance and bandwidth. ■ FY budget assumes Next Generation PennNet project averages $590k/year. Funding source is Telecommunications surplus.

11/29/20048 Budget Assumptions (Continued) ■ No rate increases for existing Telecommunications services. Some Video service rate increase in ’06. ■ For FY2006 College House students will continue to be billed indirectly as part of housing fees for baseline PennNet and Penn Video Network services. ■ Building entrance and router equipment are on a four-year replacement cycle. ■ Closet electronics and network servers are on a three-year replacement cycle. ■ Penn will continue to operate MAGPI, the Internet2 gigaPop with primary purpose to help lower Penn’s I2 and Internet costs and position for Penn’s likely need in the future for the National Lambda Rail (Internet3?).

11/29/20049 Budget Assumptions (Continued) ■ The growth rate in IP addresses from the schools/centers is projected to increase by 1000 per year from FY ■ ISC managed wallplates projected growth at 1000 new per year. ■ The CSF will subsidize approximately 816 wired, public lab connections that have computers attached in FY2005. NPTF to decide for FY ’06. ■ The CSF will subsidize approximately 900 wireless public IP connections in FY’05. NPTF to decide for FY’06. ■ The NPTF to decide if we should do a school-based IP wireless subsidy for FY’ 05 and FY ’06.

11/29/ Subsidized Wired IP Addresses

11/29/ Subsidized Wireless IP Adresses (Public)

11/29/ Subsidized Wireless IP Adresses (School-based)

11/29/ Budget Assumptions (Continued) ■ To retain and recruit appropriate N&T IT staff, 3% compensation has been budgeted to include annual performance increases, equity increases, bonuses, promotions and reclassifications from FY ■ In FY2005 a 53% overhead rate was projected to cover costs of benefits, rent, training, computers, telephones, etc. Our FY’06 overhead rate is projected at 51.8%, despite an increase in the benefit rate. ■ The NOC will not be physically staffed (7x24x365) through FY2009. It will continue to operate from 6 AM – 11 PM, M-F with the rest of the week covered by technical staff on beepers. ■ N&T total expense budget increases from $22M in FY ’02 to only $23.5M in FY ’09. (< 1%/year)

11/29/ N&T Overhead Cost Breakdown FY2006

11/29/ FY’05 N&T Cost-Cutting Measures ■ Dropping 2 full-time contractors in FY ‘05. ■ Dropping 4 part-time contractors in FY ‘05. ■ Lowering voice systems expenses by $100k in FY ‘05. ■ Outsourcing some job functions. ■ Insourcing some job functions. ■ Many internal organizational changes. ■ Many contract re-negotiations.

11/29/ N&T Financial Information ■ Five-year cash flow ■ N&T FY2006 projected revenue ■ Telecommunications Revenue ■ Wallplate rates ■ Wireless AP rates ■ General information ■ Central Service Fee

11/29/ Projected N&T 5-Year Cash Flow

11/29/ FY2006 Total Revenue

11/29/ Telecommunications Projected Revenue (FY2005)

11/29/ Telecommunications Projected Revenue (FY2006)

11/29/ FY2006 Port Rental Expense Breakdown (10baseT) ElementsCosts (Annual) Staff including overhead$120,000 Equipment$1,150,000 TOTAL$1,270,000 Number Ports35,000 ÷ 12 month Monthly Rate$3.02 per port

11/29/ FY2006 Connection Maintenance Expense Breakdown (10baseT) ElementsCosts (Annual) Staff including overhead (NOC, Net Management, second shift, OT, beeper pay) $1,065,000 Hardware/Software/Tools/ Maintenance Contracts $205,000 TOTAL$1,270,000 Number Ports35,000 ÷ 12 month Monthly Rate$3.02 per port

11/29/ Lower 100 baseT Rates Effective 11/1/04

11/29/ Wireless Costs: Access Point Ongoing Costs FY ‘05 Per AP Support Costs DescriptionUnit CostsComments Hardware Spares Inv.$ % of Hardware costs typical. AP Administration$6.25Config, access, and SW Upgrade Mgmt. 1hr per year) Trouble Calls$ hr Sr. Net specialist & 1 hr NOC Specialist per year Wireless Tools/Test Equip. $2.42Wireless LAN Tools & Support Contracts(~$4500 per year) Total Monthly Cost$30.47 Assumptions ■ Maintenance Fees are per AP Device in each wireless LAN ■ Central service fees are billed per IP address in use on the wireless LAN ■ Does not include a 10/100Base-T or vLAN port connectivity charge to PennNet ■ 100Base-T port will be charged at 10Base-T Rate due to 11mb limit

11/29/ FY2005 Projected CSF Baseline Expenses (Fall, 2003 data)

11/29/ CSF Details ■ Campus Backbone ■ Building Entrance Equipment ■ Routers ■ Building Redundancy ■ Next Generation Fiber ■ NGP/NAPs (currently subsidized by Telecom budget $590K/year) ■ Mail Relay, Listserv, Directory ■ New NISC & NOC ■ Upgraded Listserv ■ Classlists ■ Centralized wireless authentication ■ Netman ■ PUMA ■ 802.1X

11/29/ CSF Details (contd.) ■ Fiber and Cable Management ■ CAD drawings ■ Databases ■ Coordination with Facilities ■ WWW (Akamai) ■ DR ■ Peak Load ■ Infrastructure and Software Services ■ DNS ■ DHCP ■ Radius ■ PennNames ■ Internet2 ■ DWDM

11/29/ CSF Details (contd.) ■ Internet ■ Bandwidth Management ■ Differential Billing Development ■ Intrusion Detection ■ Net Flow ■ DWDM ■ Network Security ■ NOC/Network Management ■ PUMA ■ Arbor ■ SALT ■ Extended Hours ■ Emerging Technology/Strategies ■ VoIP ■ Mobile Computing ■ Video

11/29/ FY2006 Projected CSF Rates

11/29/ Next Steps ■ NPTF makes rate recommendations. ■ Finalize N&T FY ‘05 - FY ‘09 budgets. ■ Rate recommendations presented to Provost. ■ Final FY ‘06 rates established. ■ Rates sent to ABA in late December. ■ Rates published in Almanac in January.