JRA1 5th General Meeting. Paris, February 2007 JRA1 web page 1 IAP, Paris, 20th Feb 07 WIFI: 556 A0 DA DA 1 JRA1 5th General.

Slides:



Advertisements
Similar presentations
ILIAS 4 EB meeting. Paris. January 2005 JRA1 web page 1 Reminder of goals Reminder of goals Present status Present status Work.
Advertisements

W Helmreich – Presentation to Sub-contractors; Brussels, 13/10/2005 WP 2: Monitoring, Analysis and Information Preparation Sub-contractor Meeting – 13.
© NCSR, Paris, December 5-6, 2002 WP1: Plan for the remainder (1) Ontology Ontology  Enrich the lexicons for the 1 st domain based on partners remarks.
N2 – WP3 (Communication and outreach) Status Report R. Antolini, C. Tomei, N. Ferrari The LNGS open day 2005 The the “Quark” booklet The LSM film Plan.
Neutron background measurements at LNGS Gian Luca Raselli INFN - Pavia JRA1 meeting, Paris 14 Feb
ILIAS-JRA1 General meeting. Edinburgh. Sept Motivation Motivation Objectives Objectives Deliverables Deliverables Organization.
ILIAS 3 EB meeting. Paris. October 2004 JRA1 web page 1 Present status Present status Work in progress Work in progress JRA1.
WP2 Background simulations Outline Execution plan for the third year Progress of the work Activities and news.
ILIAS 2nd Annual meeting. Prague. February 2005 JRA1 web page 1 Reminder of goals Reminder of goals Present status Present status.
Development of a standard library of background simulation codes JRA1WP2 Gloria Luzon, Canfranc Underground Laboratory.
Status of N2-WP3 Claudia Tomei - LNGS. Annual Report Public Communication Tasks - 5th full working meeting lab visit no. 5 (Pyhasalmi) - translation of.
JRA1 7th General Meeting. Zaragoza, Nov 2007 JRA1 web page 1 Zaragoza, 23th November 2007 JRA1 7th General Meeting Low background.
WP3: R&D on ultra low-level WP3: R&D on ultra low-level detectors and facilities JRA1 general meeting, Paris, Feb. 14 th 2006.
WP3: R&D on ultra low-level detectors and facilities WP3: R&D on ultra low-level detectors and facilities status and outlook Matthias Laubenstein JRA1.
Summary of activities of the WG on Cosmogenic activation in JRA2/IDEA (during first 18 months) Susana Cebrián Web.
JRA1 6th General Meeting. LNGS, May 2007 JRA1 web page 1 LNGS, 28th May 2007 JRA1 6th General Meeting Low background techniques.
Status of activities of the WP4 on Radiopurity of Materials Pia Loaiza Laboratoire Souterrain de Modane JRA1 meeting Paris February 20 th, 2007.
WP3: R&D on ultra low-level detectors and facilities WP3: R&D on ultra low-level detectors and facilities LNGS: status and outlook.
WP3: R&D for ultra-low background techniques and facilities in the EU underground labs Dr. Matthias Laubenstein Laboratori Nazionali del Gran Sasso ITALY.
WP1: Measurement of the backgrounds in the EU underground sites Dr. Matthias Laubenstein Laboratori Nazionali del Gran Sasso ITALY J1 General Meeting Paris.
JRA1 3rd General Meeting. Paris, February 2006 JRA1 web page 1 Introduction: Status of the activity, tasks and deliverables.
Status of activities of the WP4 on Radiopurity of Materials Pia Loaiza Laboratoire Souterrain de Modane JRA1 meeting Paris February 14 th, 2006.
Low radioactivity at the Modane Underground Laboratory
ILIAS Physics in deep underground laboratories JRA1 : Low background techniques WP4 : Radiopurity of materials Pía Loaiza Laboratoire Souterrain de Modane,
JRA1 secod meeting. Modane, January 2005 JRA1 web page 1 Reminder of goals Reminder of goals Mid-term report Mid-term report.
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
N5 – WP1: Status and perspectives G.Losurdo – INFN Firenze/Urbino H.Grote – AEI Hannover.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP6 Communication and dissemination 10-11/07/2012COGEN Europe.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
WP9: Project management
C HU H AI C OLLEGE O F H IGHER E DUCATION D EPARTMENT O F C OMPUTER S CIENCE Preparation of Final Year Project Report Bachelor of Science in Computer Science.
1 WP1 Coordination Sylvie Joussaume (CNRS-IPSL) IS-ENES 2 nd General Assembly Lecce, Italy December 12 th -14 th 2011 The IS-ENES website IS-ENES Partners:
1  Goal of ILIAS  Activities of ILIAS, running  Status, 3rd y highlights  “ILIAS next”  Links with others - HEAPNet Integrated Large Infrastructures.
PHIN JRA Status PHIN collaboration CARE SC meetingParis February 2004.
GENIUS. WP600 Support Activities Participants: University of Barcelona: 6PM CESCA (Center for Scientific and Academic Services of Catalonia): 24PM University.
NET-SHARE Kick-off meeting Matosinhos, Portugal April 15 h 2008 ICT Policy Support Programme (ICT PSP) WPs and ACTION POINTS.
NSF Implementation of the Research Performance Progress Report March
INFSO-RI NA2 Status Update ETICS2 second AHM Isabel Matranga Engineering Ingegneria Informatica SpA Darmstadt, February 2009.
JRA2 - IDEA Zaragoza, Andrea Giuliani University of Insubria (Como) and INFN - Milano.
Status of ILIAS Geppo Cagnoli INFN Sez. Firenze University of Glasgow 3 rd ILIAS GW Meeting – 26 th Oct. 2006, ICL.
N4, Double beta network Second year… …and next Prague, April 20th, 2006, IDEA-N4 meeting Dominique Lalanne.
WP 1: Durable community building Päivi Majaranta COGAIN Kick-Off Tampere, Finland.
HFM-coll-meeting, 20 th Mar. 2013, GdR & FK, HFM-task1 1 WP7 HFM task 1 Gijs de Rijk & Francois Kircher 20 th March th EuCARD-WP7-HFM Collaboration.
Bank of Pure Isotopes Ezio Previtali INFN Sez. Milano Department of Physics University of Milano Bicocca.
Project Board meeting 15 th July 2011, Vilnius Kate Fernie MDR Partner This project has been funded with support from the European Commission'
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2007 Palaiseau, October 10th Outline:  Summary and Outlook EUDET  Introdution to FP7 discussion.
C HU H AI C OLLEGE O F H IGHER E DUCATION D EPARTMENT O F C OMPUTER S CIENCE Preparation of Final Year Project Report Bachelor of Science in Computer Science.
EU Leonardo da Vinci Programme WASTE –TRAIN PROJECT 2 nd Meeting in Dresden, GERMANY March 2007.
ILIAS Project Summary ILIAS is an Integrated Infrastructure Initiative that has pulled together all of Europe's leading infrastructures in Astroparticle.
JRA1 Activities Administrative issues –Financial accounting system established at DESY Based on SAP, traces all WP`s in JRA Based on EXEL, traces all cost.
Luciano Pandola, INFN Gran Sasso Luciano Pandola INFN Gran Sasso Genova, July 18 th, 2005 Geant4 and the underground physics community.
AIDA WP8.4 Qualification of components and common database Simon Canfer Rutherford Appleton Lab, STFC AIDA Annual meeting, DESY,
Coordination of DBD searches WP1/N4 F. Piquemal IDEA meeting Heidelger October, First milestone: composition of the working group: G. Chardin.
Follow-up to SFT Review (2009/2010) Priorities and Organization for 2011 and 2012.
CERN 1 DataGrid Architecture Group Bob Jones CERN.
Proposals for FP7 Zaragoza November 2005, IDEA meeting F. Piquemal (CEN Bordeaux-Gradignan)
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EUCARD-2 Update for.
GC meeting R. Aleksan February TIARA 1.Meeting objectives 2.General Information 3.Final Budget 4.Consortium Agreement 5.Next meetings 6.Conclusion.
AMICI WP1 – Management, coordination and dissemination
WP6. Quality Plan 6.2 Develop a monitoring, evaluation, and quality plan Edited by September, 2017.
White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT.
WP8 – Improvement and equipment of irradiation beam lines
Development of a standard library of background simulation codes
Development of a standard library of background simulation codes
Gridifying the LHCb Monte Carlo production system
Development of a standard library of background simulation codes
Future Projects and Reporting
Organizational information:
Presentation transcript:

JRA1 5th General Meeting. Paris, February 2007 JRA1 web page 1 IAP, Paris, 20th Feb 07 WIFI: 556 A0 DA DA 1 JRA1 5th General Meeting Low background techniques for deep underground sciences

JRA1 5th General Meeting. Paris, February 2007 JRA1 web page 2 JRA1 WPs WP1 – Measurement of backgrounds in the EU underground labs WP2 – Development of a library of background simulation codes WP3 – R&D for UL background techniques and facilities in the labs WP4 – R&D on radio-purity of materials and purification techniques JRA1 participants Contractors: UNIZAR, CEA/CNRS, INFN, USFD, MPIK, TUM, JRC Non-contractors: RAL, FZK, Dortmund, Silesia, Henryk Niewodniczanski, Pol. Milano, CUPP

JRA1 5th General Meeting. Paris, February 2007 JRA1 web page 3 DateMeetingLocation Participants Website 10/07/06 4th JRA1 General MeetingZaragoza22 ilias/JRA1/05.htm 14/09/06 JRA1 WP2 meeting at IDM 2006Rhodes40 wp2Back/wp2BackS im.htm 01/10/06 JRA1WP4 meeting at LRT 2006Aussois38 lrt2006.in2p3.fr/ 20/02/07 5th JRA1 General MeetingParis Meetings: Welcome to Jean-Côme Lanfranchi (TUM)

JRA1 5th General Meeting. Paris, February 2007 JRA1 web page 4 Next events ILIAS General Meeting (26-28 Feb, Chambéry): - Talk on Neutron background studies in the DUL by Eirini Tziaferi - Talk on Muon-induced background for underground physics experiments by Luciano Pandola Mid-term review (28 Feb, Chambéry): Talk about “technical progress” of tasks/deliverables/modifications for JRA1 activity (José M. Carmona) ILIAS-next (1 March, Chambéry): Talk about new JRA1 in ILIAS-next (Matthias Laubenstein) ANNUAL REPORT (send to Gilles before 5 March!!)

JRA1 5th General Meeting. Paris, February 2007 JRA1 web page 5 Tasks and deliverables for 3rd year

JRA1 5th General Meeting. Paris, February 2007 JRA1 web page 6 Tasks and deliverables for 3rd year

JRA1 5th General Meeting. Paris, February 2007 JRA1 web page 7 4th year First six months 4th year deliverables: - ALL databases open and available for UG users (background components, MC library, and radiopurity) - Final TR on new low background facilities - Results and prospects about R&D program on purification techniques

JRA1 5th General Meeting. Paris, February 2007 JRA1 web page 8

9 3rd year Annual Report

JRA1 5th General Meeting. Paris, February 2007 JRA1 web page rd year Annual Report

JRA1 5th General Meeting. Paris, February 2007 JRA1 web page rd year Annual Report

JRA1 5th General Meeting. Paris, February 2007 JRA1 web page rd year Annual Report

JRA1 5th General Meeting. Paris, February 2007 JRA1 web page rd year Annual Report

JRA1 5th General Meeting. Paris, February 2007 JRA1 web page 14 Mid-term Review JRA1 – Main achievements Visits to the labs and exchange of information/practices Visits to the labs and exchange of information/practices Upgrade and improvement of ultralow background facilities Upgrade and improvement of ultralow background facilities Formation of a discussion group about Monte Carlo simulations; contact with GEANT 4 development group addressing them specific questions and needs for simulations of underground physics Formation of a discussion group about Monte Carlo simulations; contact with GEANT 4 development group addressing them specific questions and needs for simulations of underground physics Access to information in the databases created for WP1, WP4 (first databases ever created on background measurements and measurements of radiopurity of materials) Access to information in the databases created for WP1, WP4 (first databases ever created on background measurements and measurements of radiopurity of materials) Access to library of programs plus documentation created for WP2 Access to library of programs plus documentation created for WP2 Others? … Others? … What activities/results would you remark in the Mid-Term Review?