Presentation is loading. Please wait.

Presentation is loading. Please wait.

1  Goal of ILIAS  Activities of ILIAS, running  Status, 3rd y highlights  “ILIAS next”  Links with others - HEAPNet Integrated Large Infrastructures.

Similar presentations


Presentation on theme: "1  Goal of ILIAS  Activities of ILIAS, running  Status, 3rd y highlights  “ILIAS next”  Links with others - HEAPNet Integrated Large Infrastructures."— Presentation transcript:

1 1  Goal of ILIAS  Activities of ILIAS, running  Status, 3rd y highlights  “ILIAS next”  Links with others - HEAPNet Integrated Large Infrastructures for Astroparticle Science Gilles Gerbier CEA Saclay http://ilias.in2p3.fr/

2 2 Goal “ILIAS is an Integrated Infrastructure Initiative that has pulled together all of Europe’s leading infrastructures in Astroparticle Physics to produce a focused, coherent and integrated project to improve the existing infrastructures and their operation as well as to organise and structure the scientific community to prepare the best infrastructures for the future.”

3 3

4 4 ILIAS is a contract between EC and a consortium of contractors start date: April 1 st, 2004, 5 years duration, major actor : B Saghai 21 contractors from 12 countries; ~ 70 labs main participants: France, Germany, Italy, Spain, UK other labs to contribute: ~ 70 from 20 countries with 6 outside EC Total budget: ~ 10 M€ EC support: ~ 7.5 M€ Deliverables Annual report Joint Research Activities : 4.1 M€ Networking Activities : 2.7 M€ Transnational Access: 0.7 M€ Scientific Officers: Dr. Gerburg Larsen Dr. Elena Righi – Steele Contract Manager - Audit Liaison Officer: Dr. Ulrich Schmid

5 5 I3 activities naming N etwork -ing –Talking, thinking, meeting, exchanging experience, learning, coordinating, converging… JRA –ing (Joint Research Activities) –« Working » (for experimentalists) Developing measurement tools, techniques, Developing codes, data base R&D (detectors, …) TA –ing (Transnational Access) –Facilitating access to infrastructures (not usually accessible to some european teams)

6 . N1 Coordination and Management N2: Deep Underground Science Labs JRA1: Low Background Techniques N6: Theoretical Astroparticle Physics N4: Search on 2β Decay JRA2: Integrated 2β Decay N3: Dark Matter TA: Transnational Access N5: GW Antenna JRA3: Thermal Noise Reduction In GW Detectors Gravitational Waves Infrastructures Deep Underground Infrastructures ILIAS Activities

7 7 ILIAS total budget splitting Splitting of ILIAS budget betweeen activties and contractors

8 8 ILIAS Coordination Management Scheme

9 9 Executive Board in 2007. FunctionNameInstitution ActivityNameInstitution Project ScientistG. CagnoliGlasgow Univ. Networking N2: N. Spooner F. Piquemal Sheffield Univ. IN2P3 Project Coordinator G. GerbierCEA N3: J. Jochum G. Chardin Tübingen Univ. CEA Project Deputy- Coordinator M. LaubensteinINFNN4: D. LalanneIN2P3 Project Deputy- Scientists J. JochumTübingen Univ.N5: R. FlaminioIN2P3 & EGO E. CocciaINFN N6: G. Sigl L. Roszkowski INFN Sheffield Univ. Communication & dissemination C Bosaro G Miu IN2P3 Transnation al Access A1: L. PandolaINFN Coordinating Team L. Pandola J. Jochum G. Gerbier N. Spooner INFN Tübingen Univ. CEA Sheffield Univ. Joint Research Activities J1: J. MoralesZaragoza Univ. J2: A. GiulianiINFN J3: G. CagnoliGlasgow Univ.

10 10 Some 3rd year highlights Transnational access program fulfilled –2500 d, 2800 d distributed PRC evaluation Networking –DUL Lab extension meeting : emerging projects Outreach : film on Underground Labs –Dark Matter : Integration of all noble gaz liquid Ar-Ne expts First gathering of all european experiments in same room Web page available to all for direct det DM calculations and exclusion diagrams Starting of a co driven thesis –DBD Exploration of production of bb isotopes JRA –DM,DBD : shared approach of bolometric surface background evts (CUORE/Edelweiss) –DM, DBD, GW : common interest in solving cryogenic vibrations induced background Theory –Th/exp successful training sessions (axions, SUSY)

11 11 ILIAS (next) - HEAPNET Community : why ? What for ? –or what is added value ? –or which need does it fulfill ? EC :

12 12 Astroparticle physics : links Dark matter dir detection Particle properties knowledge Sky/Cosmos knowledge   end point Proton decayLE neutrinos, reac, acc Instrum techs Cryo, bolometers, gaz… Grav Waves RA Interf  astronomyHE  astronomy Deep underground labs Axions DU lab instrum techs low activities, purif techs… Charged CR Astr sourcesGravity  properties Dark matter

13 13 Proposed structure for ILIAS-next Andrea Giuliani Paris, 26/9/2006 keep unity of each community favor relations between communities address fundamental topics in ApPEC roadmap favor exchange of technologies among different but nearby research areas save resources by avoiding duplication of problems in different contexts stimulate R&D in key sectors of astroparticle physics Basic philosophy  Networks based on physics  Joint Research Activities based on technologies Integrated infrastructures  Underground laboratories

14 14 N1 Coord. Manag. N4 Grav. Wave net N7 Theory net Integrated analysis N2 Deep Lab net JRA1 Low background JRA4 Support experiments JRA3 Support technologies JRA2 Detection techniques JRA5 Simulations OUTSIDE ILIAS X-ray  -ray Astro Cosmo Radio HEAP TA1 Trans Access N5 Dark Matter net N6 Neutrino Mass net LHC results

15 15 Dark Matter : « integrated analysis » Dark matter dir detection Particle properties knowledge Sky/Cosmos knowledge HE  astronomyHE  astronomy Deep underground labs Axions Charged CR Dark matter SUSY LHC Galaxy profile models CR propagation models

16 16 Summary ILIAS is indeed a very effective tool Questions ? –coordination –2 I3’s in astroparticle physics ? No contradiction, let’s go ahead Late ad : 4th annual ILIAS meeting @ Chambéry (France) feb 26th to 28th


Download ppt "1  Goal of ILIAS  Activities of ILIAS, running  Status, 3rd y highlights  “ILIAS next”  Links with others - HEAPNet Integrated Large Infrastructures."

Similar presentations


Ads by Google